Monthly Operating Rept for Oct 1986
ML20212L913
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/31/1986
From: Basile J, Krieger K
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8701290432
Download: ML20212L913 (6)


Text

. - -,

,a

. a. _

' OPERATING DATA REPORT DOCKET 50. 50-247 DATE ' 11/8/86

~' " ' ' ' ' "

COMPLETED liY 1K.

Krieger TELEPif0NE 914-5&5155

],

'~

' ~ ' - ~ '

~

OPER ATING STATU$

.-}

Notes

~-

Indian Point Unit'#2 i~

1. Unit Name:
2. Reporting Period:- - - m - Oc t o be r --19 8 6 2758 2;

-~.

_ m

3. Licensed Thermal Power (MW ): _ 1013
4. Nameplate Rating (Gross MWe):

~~ C.

~~

873 2: -

W

-r -

5. Design Electri:s! Rating (Net MWe):

900-

- 6. Maimum Dependable Capacit'y (Gross MWe):

864-

. 7.,Malmum Dependable Capacity (Net MWe):

8. If Clasqcs Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

Iterns 6' and 7 changed to ' win ter ratirios ~ ef fect-i ue n9nn i n / 9 6 M.-.,.

.., ~..,..,

...~,

n....

9. Power Lesel To Which Restricted. lf Any (Net MWe):

~

~ - ~ -

' - ~1 - - -.

~

10. Reasons For Restrictions,1f Any:

}

~

_. ~.

-J, r ~

c..

g n..k. Month;.e r

.-v Yr to.Date g:7 Cumul.1tive

_=.,~-.--y.

m=re-

!!.' l{ours In Reporting Period

~7.- A 745:; p % d":

-7 2 9 6 U

.. 108145' 5

606.32' 3743 A7' v>oi1 71 -

12. Number ofifoun Reactor Was Critical

/6.30 290.70" 3689.07

13. Reactor Resene ShutdomiIfours - - -

--'~ 585;67..

3577.91 70714.59 -

14. !!ours Generator On.Line u.

0 0

15. Unit Resene Shutdown flours 1592779 9394395 1R4??O697
16. Gross Tfiermal Energy Generated (Mk,H) 496/90 2914350 57163826
17. Gross Electrical Enesgy Generated (MWH) 474266 2761653 54540639
18. Net Electrical Energy Generated (MWH)

~ ~ ~

65.4 78.6 49.0

19. Unit Senice Factor - - -

,v 1

49.0 '

65.4 78.6

  • - 20. Unit Anr. ability Factor
74. 7 44.3 58.7
21. Unit Capacity Tactor IUsing MDC Net) _

72.9-

- - - 4 3. 4..

,57:8 -.

22. Unit Capacity Tsetor (U>ing DER Net) ' ~ r _ 21.4..
23. Unit Fereed Ourage Rate
13. 2 ' ~

9.2

~

34. ShutJomn Seheduled Oscr Next 6 Months (Type.Date.and Duration of Eachl:,

,~C'h

25. If Shut Down At ELJ Of Report Period E>timated Date of Startup:

~

~

26. Units in Test Status tPrior to rummercial operationi:..-

Fusceast Achiesed

'I INITIAL CRITICALITY ^-

INITi tt. Ft.l'CTRICITY

  • ~ ~ ~ ~. - -

~ I C0\\l\\ll'HCIAL Ort' RAT 10N >

I b ' T _.

[

~ ~

N/A.

~

'O (9/773 8701290432 861031ADOCK 05000247 i

PDR PDR ga 7

R

AVERAGE DAILY UNIT POWER LEVEL 50-247 DOCKET NO.

IP Unit #2 UNIT 11/8/86 DATE COMPLETED BY K. Krieger 914-526-5155 TELEPHONE MONul October 1986 DAY AVEJLAGE Dh!LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) 833 825 1

17

~

~

829 612 2

18 837 845 3

9 838 321

~~

4 837 0-i-

5 21 839

.0 6

22 840 4

-H7

-...dn23..-

0 1

f;...,.

+---

~ -

.,.. ~ - ~ ~.

838

,y g

' ^ ' ~

837 0

9 2S 848 0

10 26 843 454 11 27 1-844 838 12 28 846 844 13

. 29 846 842 14 30 15 845 858-

. 31 l'6 849

~

I I

s INSTRUCTIONS On this (grnut. fist the average daily unit power levelin MWe. Net for each day in the reponing anonth. Compute to the nearest ulmfe megawart.

(9/77) m

-._... :... :, _,_;._z-

N MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE WO NUMBER SYSTEM-COMPONENT DATE WORK PERFORMED 26902 WDS

.VLV 1731 09/30/86 BONNET CHANGED.

L 27532 CRD 22 CRDF 09/25/86 ' INSTALLED NEW MOTOR

~ 27628 SSD

~ STRUT 09/05/86

. REPLACED STRUT'FOR SR-M2 28412 CCW VLV 761B 09/25/86

. REPLACED GASKET AND FLANGE BOLTS 27852 CVCS 21 CHG PMP 09/30/86 REPAIRED WELD ON REL. VLV 231 28046 CVCS FCV 111A 09/25/86 INSTALLED TRIM SET, DIAPHRAGM AND PACKING 27464 CVCS.

22 CIIG PMP 09/15/86 REPACKED PUMP 28449 CVCS VLV 1275 09/19/86 INSTALLED VALVE AND NIPPLE 27643 AFW LCV 1158 09/25/86

. REPAIRED COUPLING / INSTALLED VALVE l

28266 480V 23 EDG 09/15/86 REPLACED #2 STABSIN' AND CLEANED CONTACTS 27229 CVCS VLV 232 09/08/86 REPLACE VALVE ASSEMBLY 27409 CVCS 22 CHG PUMP 09/03/86 REPACKED CHARGING PUMP 27597 EDG 22 EDG 09/15/86 GOVERNOR CHANGED 28214 CM POLAR CRANE 09/30/86 REPLACED BRAKE COIL 27418 CVCS VLV 237 09/15/86 REPLACED RELIEF VLV PIPING 25296 120V TERM BOX

~09/05/86 PEPLACED TERMINAL BLOCKS

t I

1

  • t I

0-247 DOCKET NO.

UNITSHUTDOWNS ANDIOWER REDUCDONS UNII NA4E

'n m

  • O t TE ILiolo6 ~

October 1986 COMPLETED NY K. Krieger 1

REPORT MONTil TELEPHONE' 914-526-5155

~

j b

u, 5 c

~r e

Cause & Correceiw Ibic P

k i$3 p"*

p?

$j

~

A(sieni to g* "'

r, gg

=,

5 = "j p

=.2 0

p,,,,,g,,,,,,,,,,

3E Repin

  • mo g

CO 6

N/A 861018~

S 0

B 4

N/A CH Valvex F Turbine stop valve test 11 861020 F

71.56 A

3 86-- 035 RB Ckt Brk Loose connection on, relay, replace relays 12 861023 F

87.75 A

27 86 - 036

[ CH Pump XX Loss of 21 MBFP, defective check B

valve. Repaired check valve.

i 4

d i

+

s'.

2 I

2 3

4 F F..eced Reasse:

Methent:

Enhshit G. Instsucts.ms 5 Schedialed A-Eqwpment Failure (Explain) 1-Manual for Pier. nation. : Data N-Maintenance or Test 2-Manual Scram.

Entr> Sisects for lucosce a

3-Automatic Seram.

Ewne Repini(LI RIl'ileINURIG-C-Refueling D-Regulais,ry itestriction 4-Other (Esplaint Ottill 3

I operaaser Training & Laense Emannimation

  • * a-n irF o ae <

A 5

<-.e

+

F-Adssiisiestratew

' ~

Emlubit i. Saene Source..

G-Operationd Error (Esplain) rof77) lleiher (Emplaint wg.

4

SUMMARY

OF OPERATING EXPERIENCE October 1986 Unit 2 operated at approximately 100% power until October 18, when power was reduced to approximately 230 MWE to conduct the monthly turbine stop and control ~ valve test.

Power was returned to full load the following day.

On October 20th, a unit trip occurred due to "B"

reactor trip breaker opening. The initiating event was a loose electrical connection associated with a relay in the logic network.

The unit remained in shut down for previously planned maintenance.

The unit was returned to service on October 23rd; however, during load increase, the reactor was manually tripped upon loss of the main boiler feedwater pump.

On October 27th, the unit was brought back on line and returned to full load.

/

O Murrey Selmen Vce Prosadent y

Consoixfated Edison Company of New York, Inc.

Indian Point Stabon Broadway & Bleakley Avenue Buchanan, NY 10511 Telephone (914) 737-8116 November 15, 1986 Ret Indian Point Unit No.2 Docket No. 50-247 Director, Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Enclosed are twelve copies of the Monthly Operating Report for Indian Point Unit No. 2 for the month of October 1986.

Very truly yours, l*e r

Encl.

18.251.11.14.1 cc.

Dr. Thomas E. Murley Regional Administrator - Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia,.PA 19406 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 38 Buchartan, NY 10511 l