Monthly Operating Rept for Nov 1985
ML20138P498
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 11/30/1985
From: Josiger W, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-LK-3071, NUDOCS 8512260140
Download: ML20138P498 (7)


Text

--

OPERATING DATA REPORT DOCKET NO.

50-286 DATE l'

1-as COMPLETED BY L-Ke11v TELEPHONE (9141 739-8200 OPERATING STATUS Notes

-Indian Point No. 3 Nuclear Power Plant

1. Unit Namc:

November 1985

2. Reporting Period:
3. Licensed Thermal Power (MWt):

3025 1013

4. Nameplate Rating (Gross MWe):

965

5. Design Electrical Rating (Net MWe):

1000

6. Maximum Dependable Capacity (Gross MWe):

965

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative 720 0,016 81,121

11. Hours in Reporting Period 713.75 5,157.15 46,523.38
12. Number Of Hours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 645.49 5,041.36 44,889.30
14. Hours Generator On-Line 0

0 0

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 2lo4G,223.87 13,069,923.87 118,774,871
17. Gross Electrical Energy Generated iMWH) 679,63o 4,265,010 36,907,325 650,588 4,095.295 35,an!.401 l
18. Net Electrical Energy Generated (MWH) on.6 62.9 55.3 l
19. Unit Service Factor 96.6 62.9 55.3 l
20. Unit Availability Factor 94.5 52.9 47.28*

(

21. Unit Capacity Factor (Using MDC Net) 94.5 52.9 45.2
22. Unit Capacity Factor (Using DER Net) 3.4 2.4 20.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
  • Wei9hted Average Steam Generator Insp3ction Outage est. April 1986 25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units in Test Status (Prior to Commercial Operation):

Forecast Achieved f

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8512260140 851130 I$ (ll PDR ADOCK 05000286

.ana j

t a

AVERAGE DAILY UNIY POWER LEVEL DOCKET NO.

50-286 Indian Point UNIT No. 3 DATE December 1, 1985 COMPLETED BY L-Kelly TELEPHONE (914) 739-8200 MONTH Movemhnr le DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Net) t MWe Net) 1 869 17 972 2

361 gg 974 891 975 3

39 4

965 2'O 973 971 972 5

21 972 966 22 6

7 972 23 972 972 g

975 34 9

974 25 974 973 10 974 26 973 II 974 27 973 12 973 73 317 13 972 39 105 974 30

,I4 15 974 31 16 974 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting inonth. Compute to the nearest whole megawatt, (0/77)

)

DOCKEl'lo.

Su-2H6 UNIT SilUTDOWNS /.ND POWER REDUCTIONS UNIT NAME rmii,n mine h 3

DATE 12-1-85 N V8mb*# 1985 COMPLETED HY T.

vn11 -

REPORT MON 111 IEl.EPilONE 914-n9-8200 t

n.

E E

.$ 3

}

jYh Licensee E,

{*,

Cause & Castective No.

Date g.

Eg 2s&

Event gy pO Action to fE j gjj licpose #

mO Pievens Recurrence H

g t5 09 851129 F

18.39 H

3 85-010-00 CH ZZZZZZ A maintenance worker who was working above the MBFP Turbine inadvertently stepped on the turbine manual trip lever, c'ausing the MBFP to trip which initiated a unit trip on lo level in #34 Steam Generator.

10 851130 F

6.12 H

3 85-011-00 CH Valvex F During a plant startup the unit tripped on hi level in #32 Steam Generator.

/

I 2

3 4

F: Forced Reason:

Method:

1:xtubit P-Instinctiiwis S: Schedaded A.Equipmens Failure (Explain) i Manual hu Psepai.iison of Daia B Maintenance of Test 2 Manual Scram.

I.'nasy Sheets sin I scemce C Refueling 3 Automatic Scram.

1 vent Repois ll l:RI Ede INllRl'G-D Regulatosy Resisiction 4-Other (Explain)

(1861) li-Operator Tsaining & License lixamination F Adminisisative 5

G4)peratiosial Enroe (F.xplain n I shihiili-Same Somcc 19/77)

Il-Osher (Explain)

.0

SUMMARY

OF OPERATING EXPERIENCE NOVEMBER 1985 Indian Point Unit 3 was sychronized to the bus for a total of 695.49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> producing a grass generation of 679,630 MWe for this reporting period.

On November 29th at'0817 hours0.00946 days <br />0.227 hours <br />0.00135 weeks <br />3.108685e-4 months <br /> a maintenance worker who was working above the MBFP turbine inadvertently stepped on the turbine manual trip lever. This caused the MBFP to trip which initiated a unit trip on lo level in #34 Steam Generator.

On November 30th at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> during a plant startup the Control Room Operator was unable to maintain proper Steam Generator level resulting in a hi-hi level condition in #32 Steam Generator.

The unit was returned to service on November 30th at 0925 hours0.0107 days <br />0.257 hours <br />0.00153 weeks <br />3.519625e-4 months <br /> and continued to operate for the remainder of the reporting period.

MONTHLY MAINTENANCE CATEGORY.I REPORT November 1985 MONTH WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5012 11/06/85 Chemical & Volume Control Level transmitter defective.

Replace level transmitter.

System, Hold-up Tank 31, Level Transmitter LT-167.

7367 11/14/85 Boric Acid Heat Trace Redundant circuit open.

Removed and replaced strip Circuit, #39.

heaters.

7386 11/14/85 Boric Acid Heat Trace Redundant circuit open.

Removed and replaced wiring.

Circuit, #34.

6939 11/15/85 Engineered Safeguards, Pressure switch leaks Removed and replaced switch.

Diesel Generator 31 internally.

Fuel Oil Pressure Switch, DPC-1119, 6121 11/20/85 Charging Pump 32.

Cylinder #5 had packing leak.

Replaced packing.

6774 11/22/85 Steam Generator Blowdown Open limit switch does not Adjusted limit switch.

Valve, PCV-1226.

function.

7415 11/22/85 Auxiliary. Coolant Close limit switch out-of-Adjusted clo.c 1 %it switch.

System, Valve MOV-822A.

adjustment.

5935 11/25/85 Radiation Monitoring Valve sticks in close position.

Repaired wiring and tightened System, Solenoid Valve air tubing to valve.

SOV-1535.

MONTHLY I & C CATEGORY I REPORT November 1985 MONTH WR#

DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4710 10/18/85 33 Static Inverter.

Voltage drops as current increases.

Replaced drive amplifier board, tie breaker and out-put fuse.

4742 1-V24 /85.

Process Radiation Monitor reads low.

Replaced detector and pre-amp.

Monitor R-15, Condenser Air Ejector.

4482 10/30/85 31 Component Cooling

' Temperature indicator out of Recalibrated temperature Water Header, Temperature calibration.

indicator.

Indicator, TI-602A.

4808 11/8/85 Process Radiation Monitor Blown fuse.

Replaceu power transformer R2, 80' V.C. Monitor.

and resistors, calibrated monitor.

4809 11/8/85 Reactor Coolant System, Bad temperature indicator.

Replaced TI-411B.

Temperature Indicator TI-411B.

4800 11/13/85 Process Radiation Monitors Bad detector.

Replaced detector and alarm R-1 and R-10, CCR Radiation board, recalibrated monitor.

Monitor and Auxiliary Boiler Feedwater Room.

4786 11/15/85 31 Diesel Generator, Bad selector switch.

Replaced selector switch.

Engine Pyrometer.

4860 11/26/85 Reactor Coolant System, Faulty controller for Replaced controller.

Pressurizer Spray Valve, PCV-455B.

PCV-455B.

4839 11/29/85 34 Reactor Coolant Pump Indicator reads upscale.

Recalibrated temperature Seal Injection Inlet indicator.

Temperature Indicator, TI-152.

Indan Ret 3 Nuckar Rume Phnt P.Q Ebx 215 Buchanan, New Stak 10511 914 739.8200

  1. > NewYorkPbwer g""f=n;?, '

1sf Authonty December 16, 1985 IP-LK-3071 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Atten. ion: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the Monthly Operating Report relating to Indian Point 3 Nuclear Power Plant for the month of November, 1985.

Very truly yours, dk $/

I

~

G 11am A Jo e

Resident an ger LK/jm I sures (12 Copies) cc:

Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident inspectors' Office Gecrge Wilverding (SRC), WP0 J. P. Bayne, WP0 J. C. Brons, WP0 S. V. Fuller, NYO W. R. Yario, NYO INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 L_ _

w