Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20207G2961986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20133N6201985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program 05000286/LER-1994-010, :on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised1994-11-0707 November 1994
- on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised
ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20044B8461993-03-0404 March 1993 Part 21 Rept Re Possible Safety Implications in Motor Operated Valve Evaluation Software Program Re Use of Total Thrust Multiplier.Utils Advised of Problem & Recommended Corrective Action in Encl Customer Bulletin 92-06 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program JPN-90-035, New York Power Authority Annual Rept for 19891989-12-31031 December 1989 New York Power Authority Annual Rept for 1989 ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 05000286/LER-1989-013-01, :on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities1989-07-28028 July 1989
- on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities
ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point 05000286/LER-1989-007, :on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained1989-04-17017 April 1989
- on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained
ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept 05000286/LER-1989-001, :on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded1989-03-0303 March 1989
- on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded
ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed 05000286/LER-1989-003-01, :on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed1989-02-23023 February 1989
- on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed
ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 1999-02-09
[Table view] |
Text
--
OPERATING DATA REPORT DOCKET NO.
50-286 DATE l'
1-as COMPLETED BY L-Ke11v TELEPHONE (9141 739-8200 OPERATING STATUS Notes
-Indian Point No. 3 Nuclear Power Plant
- 1. Unit Namc:
November 1985
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
3025 1013
- 4. Nameplate Rating (Gross MWe):
965
- 5. Design Electrical Rating (Net MWe):
1000
- 6. Maximum Dependable Capacity (Gross MWe):
965
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Date Cumulative 720 0,016 81,121
- 11. Hours in Reporting Period 713.75 5,157.15 46,523.38
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 645.49 5,041.36 44,889.30
- 14. Hours Generator On-Line 0
0 0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2lo4G,223.87 13,069,923.87 118,774,871
- 17. Gross Electrical Energy Generated iMWH) 679,63o 4,265,010 36,907,325 650,588 4,095.295 35,an!.401 l
- 18. Net Electrical Energy Generated (MWH) on.6 62.9 55.3 l
- 19. Unit Service Factor 96.6 62.9 55.3 l
- 20. Unit Availability Factor 94.5 52.9 47.28*
(
- 21. Unit Capacity Factor (Using MDC Net) 94.5 52.9 45.2
- 22. Unit Capacity Factor (Using DER Net) 3.4 2.4 20.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
- Wei9hted Average Steam Generator Insp3ction Outage est. April 1986 25 If Shut Down At End Of Report Period. Estimated Date of Startup:
26 Units in Test Status (Prior to Commercial Operation):
Forecast Achieved f
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8512260140 851130 I$ (ll PDR ADOCK 05000286
.ana j
t a
AVERAGE DAILY UNIY POWER LEVEL DOCKET NO.
50-286 Indian Point UNIT No. 3 DATE December 1, 1985 COMPLETED BY L-Kelly TELEPHONE (914) 739-8200 MONTH Movemhnr le DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Net) t MWe Net) 1 869 17 972 2
361 gg 974 891 975 3
39 4
965 2'O 973 971 972 5
21 972 966 22 6
7 972 23 972 972 g
975 34 9
974 25 974 973 10 974 26 973 II 974 27 973 12 973 73 317 13 972 39 105 974 30
,I4 15 974 31 16 974 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting inonth. Compute to the nearest whole megawatt, (0/77)
)
DOCKEl'lo.
Su-2H6 UNIT SilUTDOWNS /.ND POWER REDUCTIONS UNIT NAME rmii,n mine h 3
DATE 12-1-85 N V8mb*# 1985 COMPLETED HY T.
vn11 -
REPORT MON 111 IEl.EPilONE 914-n9-8200 t
n.
E E
.$ 3
}
jYh Licensee E,
{*,
Cause & Castective No.
Date g.
Eg 2s&
Event gy pO Action to fE j gjj licpose #
mO Pievens Recurrence H
g t5 09 851129 F
18.39 H
3 85-010-00 CH ZZZZZZ A maintenance worker who was working above the MBFP Turbine inadvertently stepped on the turbine manual trip lever, c'ausing the MBFP to trip which initiated a unit trip on lo level in #34 Steam Generator.
10 851130 F
6.12 H
3 85-011-00 CH Valvex F During a plant startup the unit tripped on hi level in #32 Steam Generator.
/
I 2
3 4
F: Forced Reason:
Method:
1:xtubit P-Instinctiiwis S: Schedaded A.Equipmens Failure (Explain) i Manual hu Psepai.iison of Daia B Maintenance of Test 2 Manual Scram.
I.'nasy Sheets sin I scemce C Refueling 3 Automatic Scram.
1 vent Repois ll l:RI Ede INllRl'G-D Regulatosy Resisiction 4-Other (Explain)
(1861) li-Operator Tsaining & License lixamination F Adminisisative 5
G4)peratiosial Enroe (F.xplain n I shihiili-Same Somcc 19/77)
Il-Osher (Explain)
.0
SUMMARY
OF OPERATING EXPERIENCE NOVEMBER 1985 Indian Point Unit 3 was sychronized to the bus for a total of 695.49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> producing a grass generation of 679,630 MWe for this reporting period.
On November 29th at'0817 hours0.00946 days <br />0.227 hours <br />0.00135 weeks <br />3.108685e-4 months <br /> a maintenance worker who was working above the MBFP turbine inadvertently stepped on the turbine manual trip lever. This caused the MBFP to trip which initiated a unit trip on lo level in #34 Steam Generator.
On November 30th at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> during a plant startup the Control Room Operator was unable to maintain proper Steam Generator level resulting in a hi-hi level condition in #32 Steam Generator.
The unit was returned to service on November 30th at 0925 hours0.0107 days <br />0.257 hours <br />0.00153 weeks <br />3.519625e-4 months <br /> and continued to operate for the remainder of the reporting period.
MONTHLY MAINTENANCE CATEGORY.I REPORT November 1985 MONTH WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5012 11/06/85 Chemical & Volume Control Level transmitter defective.
Replace level transmitter.
System, Hold-up Tank 31, Level Transmitter LT-167.
7367 11/14/85 Boric Acid Heat Trace Redundant circuit open.
Removed and replaced strip Circuit, #39.
heaters.
7386 11/14/85 Boric Acid Heat Trace Redundant circuit open.
Removed and replaced wiring.
Circuit, #34.
6939 11/15/85 Engineered Safeguards, Pressure switch leaks Removed and replaced switch.
Diesel Generator 31 internally.
Fuel Oil Pressure Switch, DPC-1119, 6121 11/20/85 Charging Pump 32.
Cylinder #5 had packing leak.
Replaced packing.
6774 11/22/85 Steam Generator Blowdown Open limit switch does not Adjusted limit switch.
Valve, PCV-1226.
function.
7415 11/22/85 Auxiliary. Coolant Close limit switch out-of-Adjusted clo.c 1 %it switch.
System, Valve MOV-822A.
adjustment.
5935 11/25/85 Radiation Monitoring Valve sticks in close position.
Repaired wiring and tightened System, Solenoid Valve air tubing to valve.
SOV-1535.
MONTHLY I & C CATEGORY I REPORT November 1985 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4710 10/18/85 33 Static Inverter.
Voltage drops as current increases.
Replaced drive amplifier board, tie breaker and out-put fuse.
4742 1-V24 /85.
Process Radiation Monitor reads low.
Replaced detector and pre-amp.
Monitor R-15, Condenser Air Ejector.
4482 10/30/85 31 Component Cooling
' Temperature indicator out of Recalibrated temperature Water Header, Temperature calibration.
indicator.
Indicator, TI-602A.
4808 11/8/85 Process Radiation Monitor Blown fuse.
Replaceu power transformer R2, 80' V.C. Monitor.
and resistors, calibrated monitor.
4809 11/8/85 Reactor Coolant System, Bad temperature indicator.
Replaced TI-411B.
Temperature Indicator TI-411B.
4800 11/13/85 Process Radiation Monitors Bad detector.
Replaced detector and alarm R-1 and R-10, CCR Radiation board, recalibrated monitor.
Monitor and Auxiliary Boiler Feedwater Room.
4786 11/15/85 31 Diesel Generator, Bad selector switch.
Replaced selector switch.
Engine Pyrometer.
4860 11/26/85 Reactor Coolant System, Faulty controller for Replaced controller.
Pressurizer Spray Valve, PCV-455B.
PCV-455B.
4839 11/29/85 34 Reactor Coolant Pump Indicator reads upscale.
Recalibrated temperature Seal Injection Inlet indicator.
Temperature Indicator, TI-152.
Indan Ret 3 Nuckar Rume Phnt P.Q Ebx 215 Buchanan, New Stak 10511 914 739.8200
- > NewYorkPbwer g""f=n;?, '
1sf Authonty December 16, 1985 IP-LK-3071 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Atten. ion: Document Control Desk
Dear Sir:
Enclosed you will find twelve copies of the Monthly Operating Report relating to Indian Point 3 Nuclear Power Plant for the month of November, 1985.
Very truly yours, dk $/
I
~
G 11am A Jo e
Resident an ger LK/jm I sures (12 Copies) cc:
Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident inspectors' Office Gecrge Wilverding (SRC), WP0 J. P. Bayne, WP0 J. C. Brons, WP0 S. V. Fuller, NYO W. R. Yario, NYO INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 L_ _
w