OPERATINC DATA REPORT Docket No.
50-286 Date 4-1-86 Completed By L. Kelly Telephone 914-739-8200 CPERATING STATUS 1.
Unit Name:
Indian Point No. 3 Nuclear Power Plant Notes 2.
Reporting Period:
March 1986 3.
Licensed Thermal Power (MWt):
3025 4.
Nameplate Rating (Gross MWe):
1013 5.
Design Electrical Rating (Net MWe):
965 6.
Maximum Dependable Capacity (Gross MWe):
1000 7.
Maximum Dependable Capacity (Net MWe):
965 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report.
Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons for Restrictions, If Any:
This Month Yr. to Date Cumulative 11.
Hours In Reporting Period 744 2,160 84,025 12.
Number of Hours Reactor Was Critical 744 2,145.12 49,412.50 13.
Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line 740.17 2,141.09 47,774.39 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 2,163,376.35 6,399,737.17 127,177,512.3 17.
Gross Electrical Energy Generated (MWH) 713,190 2,121,310 39,685,845 18.
Net Electrical Generated (MWH) 688,595 2,050,500 38,065.139 19.
Unit Service Factor 99.5 99.1 56.9 20.
Unit Availability Factor 99.5 99.1 56.9 21.
Unit Capacity Factor (Using MDC Net) 95.9 98.8 48.96
- 22.
Unit Capacity Factor (Using DER Net) 95.9 98.8 46.9 23.
Unit Forced Outage Rate
.51
.88 19.0 24.
Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
- Weighted Average Steam Generator Inspection Outage April 26, 1986 25.
If Shut Down at End of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8604220219 860331 i
/ /
s AVERACE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 UNIT IP-3 DATE 4-1-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH March 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER.GE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 163 17 969 2
466 18 968 3
947 19 969 4
965 20 968 5
966 21 968 6
966 22 967 7
969 23 965 8
971 24 966 9
971 25 969 10 971 26 970 11 970 27 968 12 970 28 970 13 968 29 969 14 968 30 966 15 972 31 968 16 970 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
IM)CK E1 '80.
'.u-2H6 UNII SilullM)WNS /.ND POWER REI)UCIlONS UNil' N AME ria si an
'>n i n t "" 3 g)A g gi 4-1-86 REPOR I MON 111 March, 1986 COMi*lfiED HY L-MN IEl.EPilONE 9I 4-7 V)-8200
<<.r
.7 tm 4 6*
c rs
.2 E g
fgX Licensee E,
g, Cause & Consective N...
Date 3,
3g g
jy5 Event gy f'l c'
Action to lismes #
iE U
$5 5
j gy, g H
hesent Recorsence d
01 860228 F
3.83 A
3 86-001-00 IC RELAYX A While conducting a turbine independent electrical overspeed protection system (IEOPS) analog test a stuck blocking relay (LTB-1) in the IECPS circuit allowed main turbine generator steam stop and control valves to close on the test signal. This caused steam generator levels to drop below trip set point.
I I
2 3
4 I:. Forced Reamn:
Meshext:
I sinhis i. - Insiinces.uis S: Stheduled A.Eiguipment I ailure ( Enolam) i Manual siin Picpas.us.ni ol D aia H. Maintenance or Test 2-Manual Sesam.
I uny Shecis sin I Acinee C Refueling
- 3. Automatic Sciam.
I: vent Repiu s iI I R 6 l'ile iNilRl'G-D Regulatory Resteicsion 4-Othe IEmplani)
Ultill li Opeutor Tsaisung & IAcow 1:uminaison I; Adnunistiative 5
G Operatiosul Earus (limplain)
I shibia li-Same Somcc 19/77) 11 Othes (Expl.iin)
I
I t
MONTHLY MAINTENANCE CATECORY I REPORT March 1986 MONTH WR#
DATE EQUIPMEh"r MALFUNCTION CORRECTIVE ACTION 7366 03/06/86 Drain Cutoff Valve for Valve broken, does not Replaced with new valve.
31 Component Cooling operate.
Surge Tank Level Column 7902 03/06/86 No. 31 Charging Pump Cracked Pump Block.
Replaced pump block.
i 7909 03/06/86 Plant Vent Particulate Pap does not start.
Loose fuse clip.
i Rad Monitor R-13 Pump 7769 03/07/86 Normal and Emergency Leaking air Fittings.
Tightened and sealed leaking
[
Dampers for Fuel Storage air fittings.
Building Ventilation 7903 03/07/86 Steam Generator Blowdown Limit switch not functioning.
Adjusted limit switch.
Sample Valve PCV-1226 7953 03/14/86 No. 35 Service Water Motor inoperative.
Disassembled and cleaned.
Zurn Strainer 7635 03/21/86 Containment Pressure Increased valve stroke times.
Disassembled and cleaned Relief Valves PCV-1191 valve assemblies, and 1192 t
7942 03/24/86 Steam Jet Air Ejector Dual indication.
Adjusted limit switch.
l Divert Valve PCV-Il69 7943 03/24/86 Steam Jet Air Ejector Dual indication.
Adjusted limit switch.
Divert Valve PCV-1168 7932 03/26/86 Plant Vent Particulate Pump does not work.
Rebuilt pump.
Rad. Monitor R-13 Pump 8069 03/28/86 No. 32 Charging Pump Excessive packing leak.
Repacked pump.
u
.m
I MONTHLY I & C CATEGORY I REPORT March 1986 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5285 3/01/86 Turbine Independent Blocking relay defective.
Replaced relay.
Electrical Overspeed Protection System, Channel "B" Blocking Relay LTB1 5294 3/04/86 Main Steam, No. 34 Spurious signal from Calibrated I/P converter.
Atmospheric Valve controller.
Controller 5289 3/04/86 Turbine Trip ROPI Relay, Open relay coil.
Replaced relay.
(IEOPS) 5288 3/04/86 Reactor Protection, Open relay.
Replaced relay.
Test Relay-1/NC 33A-Y 5286 3/05/86 Turbine Trip Logic Relay, Open relay coil.
Replaced coil.
AST-3X 5211 3/06/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-425 to be replaced.
and calibrated.
I 5212 3/06/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-445 to be replaced.
and calibrated.
3FM-445 5215 3/06/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-436 to be replaced.
and calibrated.
5272 3/06/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-435 to be replaced.
and calibrated.
5273 3/06/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-434 to be replaced.
and calibrated.
5274 3/06/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-426 to be replaced, and calibrated.
5275 3/06/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor. 3FM-426 to be replaced.
and calibrated.
I
MONTHLY I & C CATECORY I REPORT March 1986 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5277 3/06/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-414 to be replaced.
and calibrated.
5219 3/07/86 Auxiliary Feedwater, #31 Controller not opening valve Replaced circuit card DI.
A.B.F.P. Discharger properly due to bad circuit Pressure Cutback Controller card.
5276 3/09/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-416 to be replaced.
and calibrated.
5281 3/09/86 Reactor Coolant Flow Magnetic ampilifer needs Replaced magnetic amplifier Monitor, 3FM-446 to be replaced.
and calibrated.
l I
I 5230 3/13/86 Process Radiation Monitor, Faulty keyboard module Replaced keyboard module.
R-27, Plant Vent 5314 3/15/86 Reactor Coolant Flow Current repeater has no Replaced magnetic amplifier.
Recorder, 3FM-466 output.
5339 3/22/86 Reactor Coolant System Needs calibration.
Calibrated.
Pressurizer High Temperature Controller 3TC-453 5376 3/25/86 Administration Building Gas Failed low.
Replaced detector.
Monitor R-46 e
l l
l Summary of Operating Experience March 1986
[
Indian Point Unit 3 was synchronized to the bus for a torni of 740.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> producing a gross generation of 713,190 for this reporting period.
On March 1st at 0350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> the unit returned to service from a hot shutdown resulting from a unit trip on February 28th at 0855 hours0.0099 days <br />0.238 hours <br />0.00141 weeks <br />3.253275e-4 months <br />.
The unit remained on line for the remainder of the reporting period without any trips or reportable load reductions.
l I
i l
l t
Indi Cucle Plant PO. Bo Buchanan NewWrk 10511 914 739.8200
- > NewYorkPower
& Authority April 15, 1986 IP3-WAJ-024Z IP3-FWG-081H Docket No.
50-286 License No. DPR-64 Director, Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk
Dear Sir:
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of March 1986.
Very truly yours, hh w,_-
_om
. Jo ger Residen Ma ger LK/aa mosures (12 copies) cc:
Dr. Thomas E. Murley, Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), kTO J.C. Brons, kTO S.V. Fuller, NYO W.R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 l
.