| title = Advises That Forthcoming Insp Rept 50-440/86-20 Details Results of NRC Review of Util Responses to Comfirmatory Action Ltr.Responses Complete & Reactor Startup Consistent W/Planned Schedule
| author name = Keppler J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name = Edelman M
| addressee affiliation = CLEVELAND ELECTRIC ILLUMINATING CO.
| docket = 05000440
| license number =
| contact person =
| document report number = CAL, NUDOCS 8608270318
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
See also: [[see also::IR 05000440/1986020]]
 
=Text=
{{#Wiki_filter:. _ _
                                                  AUG 211986
    Docket No. 50-440
    The Cleveland Electric Illuminating        '
      Company
    ATTN: Mr. Murray R. Edelman
            Vice President
            Nuclear Group
    Post Office Box 5000
,
    Cleveland, OH 44101
    Gentlemen:
    This refers to our Confirmatory Action Letter dated June 23, 1986, relating to
    the recovery program for the off gas charcoal fire identified at the Perry
    plant on June 20, 1986.
    Based on our inspection efforts, Region III has concluded you have met all of
    your commitments noted in the above Confirmatory Action Letter and I concur
    with reactor startup consistent with your planned schedule. Our inspection
    results will be sent to you in IE Inspection Report No. 50-440/86020, currently
    under review.
    Thank you for your cooperation with us in this matter.
                                                  Sincerely,
                                                    Original e,leed by
                                                    Je.vc G. Egpter
                                                  James G. Keppler
                                                  Regional Administrator
    cc:  F. R. Stead, Manager, Perry
            Plant Technical Department
          M. D. Ljster, Manager, Perry Plant
            Operations Department
          E. M. Buzzelli, General Supervising
            Engineer, Nuclear Licensing and
            Compliance Section
'        DCS/RSS (RIDS)
          Licensing Fee Management Branch
          Resident Inspector, RIII
          Harold W. Kohn, Ohio EPA
          Terry J. Lodge, Esq.
:        James W. Harris, State of Ohio
          Robert H. Quillin, Ohio
            Department of Health
                    RIII              RI[I                          RIIINs
,
      %V'
  c)O'Dwyer/jk      uV
                    Ring
                                        wen            Rll'I
                                                            .          pra)
l                                      Knop            Hehl          Warnick
    08/21/86        08/Ar/86          08/R/ /86      08/'M/86      08/// /86
l  RIII            RIII              RIII
(      MC            J
!  Paperiello      Davis              Ke    er
l  08/1.1/86        08h//86            0 /4//86
l            8608270318 860821                                                  10 'j y
                                                                                    #{
                  ADOCK 05000440
'
            PDR
[            G                      PDR
}}

Latest revision as of 20:04, 19 December 2021

Advises That Forthcoming Insp Rept 50-440/86-20 Details Results of NRC Review of Util Responses to Comfirmatory Action Ltr.Responses Complete & Reactor Startup Consistent W/Planned Schedule
ML20206P805
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/21/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
CAL, NUDOCS 8608270318
Download: ML20206P805 (1)


See also: IR 05000440/1986020

Text

. _ _

AUG 211986

Docket No. 50-440

The Cleveland Electric Illuminating '

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

,

Cleveland, OH 44101

Gentlemen:

This refers to our Confirmatory Action Letter dated June 23, 1986, relating to

the recovery program for the off gas charcoal fire identified at the Perry

plant on June 20, 1986.

Based on our inspection efforts, Region III has concluded you have met all of

your commitments noted in the above Confirmatory Action Letter and I concur

with reactor startup consistent with your planned schedule. Our inspection

results will be sent to you in IE Inspection Report No. 50-440/86020, currently

under review.

Thank you for your cooperation with us in this matter.

Sincerely,

Original e,leed by

Je.vc G. Egpter

James G. Keppler

Regional Administrator

cc: F. R. Stead, Manager, Perry

Plant Technical Department

M. D. Ljster, Manager, Perry Plant

Operations Department

E. M. Buzzelli, General Supervising

Engineer, Nuclear Licensing and

Compliance Section

' DCS/RSS (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

RIII RI[I RIIINs

,

%V'

c)O'Dwyer/jk uV

Ring

wen Rll'I

. pra)

l Knop Hehl Warnick

08/21/86 08/Ar/86 08/R/ /86 08/'M/86 08/// /86

l RIII RIII RIII

( MC J

! Paperiello Davis Ke er

l 08/1.1/86 08h//86 0 /4//86

l 8608270318 860821 10 'j y

  1. {

ADOCK 05000440

'

PDR

[ G PDR