{{#Wiki_filter:
{{#Wiki_filter:_-_
  .o
      ./
          .
                                            OCT7      1985
            Docket No. 50-440
            The Cleveland Electric Illuminating
              Company
            ATTN: Mr. Murray R. Edelman
                    Vice President
                    Nuclear Group
            Post Office Box 5000
            Cleveland, OH 44101
            Gentlemen:
            This refers to the routine safety inspection conducted by Messrs. J. H. Neisler
            and K. Tani of this office on September 18-20, 1985 of activities at Perry
            Nuclear Power Plant, Unit 1, authorized by NRC Construction Permit No. CPPR-148
            and to the discussion of our findings with Mr. C. Shuster and other members of
            your staff at the conclusion of the inspection.
            The enclosed copy of our inspection report ~ identifies areas examined during
            the inspection. Within these areas, the inspection consisted of a selective
            examination of procedures and representative records', observations, 'and
            interviews with personnel.
            No violations of NRC requirements were identified during the course of this
            inspection.
            In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
            this letter and the enclosed inspection report will be placed in the NRC's
            Public Document Room.
            We will gladly discuss any questions you have concerning this inspection.
                                                    Sincerely,
                                                                          ~
                                                    4 ttn1 S:cnd by J. J.'!hrri=
                                                      ,
                                                    J. J. Harrison, Chief
                                                    Engineering Branch
            Enclosure: Inspection Report
              No. 50-440/85062(DRS)
            See Attached List For Distribution
                                                    ~
                            8510170306 851007
                            PDR  ADOCK 05000440
                            0                PDR
u-                                                                                      Y$0l.
 
  .
    .
      The Cleveland Electric Illuminating    '2        OCT 7 1985
        Company
      Distribution
      cc w/ enclosure:
      -J. J. Waldron, Manager, Perry
        Plant Technical Department
      M. D. Lyster, Manager, Perry Plant
        Operations Department
      L. O. Beck, General Supervising
          Engineer, Nuclear Licensing and
          Fuel Management Section
      DCS/RSB (RIDS)
      Licensing Fee Management Branch
      Resident Inspector, RIII
      Harold W. Kohn, Ohio EPA
      Terry J. Lodge, Esq.
      James W. Harris, State of Ohio
      Robert H. Quillin, Ohio
          Department of Health
                                                l&
      RIII'                RI I          RIII    ( R    p
      N      r/ld              i ms      Knop      Harrison
      10      85            yp                        goh
          ,
,
}}
}}

Latest revision as of 00:42, 30 December 2020

Forwards Safety Insp Rept 50-440/85-62 on 850918-20.No Violations Noted
ML20205E437
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/07/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20205E443 List:
References
NUDOCS 8510170306
Download: ML20205E437 (2)


See also: IR 05000440/1985062

Text

_-_

.o

./

.

OCT7 1985

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. J. H. Neisler

and K. Tani of this office on September 18-20, 1985 of activities at Perry

Nuclear Power Plant, Unit 1, authorized by NRC Construction Permit No. CPPR-148

and to the discussion of our findings with Mr. C. Shuster and other members of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report ~ identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records', observations, 'and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

4 ttn1 S:cnd by J. J.'!hrri=

,

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Report

No. 50-440/85062(DRS)

See Attached List For Distribution

~

8510170306 851007

PDR ADOCK 05000440

0 PDR

u- Y$0l.

.

.

The Cleveland Electric Illuminating '2 OCT 7 1985

Company

Distribution

cc w/ enclosure:

-J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

l&

RIII' RI I RIII ( R p

N r/ld i ms Knop Harrison