ML20195E258: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:- - - - - - - - - - - _ - - - _ _ _ _
                                    \
June 10, 1988 s      o L.
Docket No. 50-155                                DISTRIBUTION (Docket File /      ACRS (10)
Mr. Kenneth W. Berry                            NRC'& Loca~1 PDRs  PD31 Gray File Director, Nuclear Licensing                      GHolahan            EJordan Consumers Power Company                          RIngram
            ~
1945 West Parnall Road                          WScott Jackson, Michigan 49201                          OGC BGrimes
 
==Dear Mr. Berry:==
 
==SUBJECT:==
BIG ROCK POINT OFFSITE DOSE CALCULATION MANUAL (TAC NO. 63138)
You provided an Offsite Dose Calculation Manual (ODCM), dated December 1, 1984, for Big Rock Point Plant (BRP). That document was accepted by us on
-                  August 26, 1985. Subsequently, you submitted Revisions 1 and 2.to the ODCM accompanying Consumers Power Company letters dated February 28, 1986, and August 27, 1987, respectively.
The Revision 2 ODCM for BRP has been reviewed for us in its entirety by our contractor, EG&G Idaho, Inc. Their discussion and comments are contained in their Technical Evaluation Report (TER) EGG-PHY-8079, which is enclosed with this letter. We agree with the contractor that your ODCM uses methods that-are, in general, consistent with staff guidelines and is an acceptable interim reference.
However, the TER lists a number of discrepancies and suggestions, some typo-graphical in nature, and others dealing with technical issues. Since these questions involve refinements of a basically sound document, there is no need for immediate action. Instead, we ask that you address the points raised in the Conclusions section of the TER within 6 months in a new revision of the ODCM.
The request in this letter affects fewer than 10 respondents; therefore OMB clearance is not required under PL 96-511.
Sincerely, original signed by Wayne E. Scott, Jr., Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects
 
==Enclosure:==
 
As stated cc w/ enclosure:
See attached                        "
8806230340 880610 PDR    ADOCK 05000155 P                  PDR OFFICE:    LA/PD31:DRSP        P        RSP      D/PD    DRSP SURNAME:  RINGRAM/G          W                  D$B DATE:      06/10/88            06 10/88            06/e7/88
 
8
  ,(yp2 Klog'o, UNITED STATES y              g            NUCLEAR REGULATORY COMMISSION g            : E                      W/ SHING TON, D. C. 20655 June 10, 1988
              /
Docket No. :      50-155 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
 
==Dear Mr. Berry:==
 
==SUBJECT:==
BIG ROCK POINT OFFSITE DOSE CALCULATION MANUAL (TAC NO. 63138)
You provided an Offsite Dose Calculation Manual (0DCM), dated December 1,1984, for Big Rock Point Plant (BRP). That document was accepted by us on August 26, 1985. Subsequently, you submitted Revisions 1 and 2 to the ODCM accompanying Consumers Power Company letters dated February 28, 1986, and August 27, 1987, respectively.
The Revision 2 ODCM for BRP has been reviewed for us in its entirety by our contractor, EG&G Idaho, Inc. Their discussion and comments are contained in their Technical Evaluation Report (TER) EGG-PHY-8079, which is enclosed with this letter. We agree with the contractor that your ODCM uses methods that are, in general, consistent with staff guidelines and is an acceptable interim reference.
However, the TER lists a number of discrepancies and suggestions, some typo-graphical in nature, and others dealing with technical issues. Since these questions involve refinements of a basically sound document, there is no need for immediate action. Instead, we ask that you address the points raised in the Conclusions section of the TER within 6 months in a new revision of the ODCH.
The request in this letter affects fewer than 10 respondents; therefore OMB clearance is not required under PL 96-511.
Sincerely,
                                                                    /
Wayne E. Scott, Jr., Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects
 
==Enclosure:==
 
As stated cc w/ enclosure:
See attached
 
I a Mr. Kenneth W. Berry Consumers Power Compa 3                  Big Rock Point Plant cc:
Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue l:          Jackson, Michigan 49201 l-l Mr. Thomas W. E1 ward Plant Manager Big Rock Point Plant 10269 U.S. 31 North Charlevoix, Michigan 49720 Mr. Bud Heeres County Commissioner 303 Sheridan Charlevoix, Michigan 49720 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Regional Administrator, Region III U.S. Nuclear Regulatory Commission l          799 Roosevelt Road
!          Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 20035 Lansing, Michigan 48909 U.S. Nuclear Regulatory Commission Resident Inspector Office Big Rock Point Plant 10253 U.S. 31 North Charlevoix, Michigan 49720
                                                      - - - - _ _ - - - - - - - - - - - - - - - - - - - - - -}}

Revision as of 16:38, 16 December 2020

Forwards Eg&G Technical Evaluation Rept EGG-PHY-8079, Tehcnical Evaluation Rept for Evaluation of Updated Offsite Dose Calculation Manual (Updated Through 870827) Big Rock Point Plant. Util Should Respond to Noted Discrepancies
ML20195E258
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/10/1988
From: Scott W
Office of Nuclear Reactor Regulation
To: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20154B621 List:
References
TAC-63138, NUDOCS 8806230340
Download: ML20195E258 (3)


Text

- - - - - - - - - - - _ - - - _ _ _ _

\

June 10, 1988 s o L.

Docket No. 50-155 DISTRIBUTION (Docket File / ACRS (10)

Mr. Kenneth W. Berry NRC'& Loca~1 PDRs PD31 Gray File Director, Nuclear Licensing GHolahan EJordan Consumers Power Company RIngram

~

1945 West Parnall Road WScott Jackson, Michigan 49201 OGC BGrimes

Dear Mr. Berry:

SUBJECT:

BIG ROCK POINT OFFSITE DOSE CALCULATION MANUAL (TAC NO. 63138)

You provided an Offsite Dose Calculation Manual (ODCM), dated December 1, 1984, for Big Rock Point Plant (BRP). That document was accepted by us on

- August 26, 1985. Subsequently, you submitted Revisions 1 and 2.to the ODCM accompanying Consumers Power Company letters dated February 28, 1986, and August 27, 1987, respectively.

The Revision 2 ODCM for BRP has been reviewed for us in its entirety by our contractor, EG&G Idaho, Inc. Their discussion and comments are contained in their Technical Evaluation Report (TER) EGG-PHY-8079, which is enclosed with this letter. We agree with the contractor that your ODCM uses methods that-are, in general, consistent with staff guidelines and is an acceptable interim reference.

However, the TER lists a number of discrepancies and suggestions, some typo-graphical in nature, and others dealing with technical issues. Since these questions involve refinements of a basically sound document, there is no need for immediate action. Instead, we ask that you address the points raised in the Conclusions section of the TER within 6 months in a new revision of the ODCM.

The request in this letter affects fewer than 10 respondents; therefore OMB clearance is not required under PL 96-511.

Sincerely, original signed by Wayne E. Scott, Jr., Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects

Enclosure:

As stated cc w/ enclosure:

See attached "

8806230340 880610 PDR ADOCK 05000155 P PDR OFFICE: LA/PD31:DRSP P RSP D/PD DRSP SURNAME: RINGRAM/G W D$B DATE: 06/10/88 06 10/88 06/e7/88

8

,(yp2 Klog'o, UNITED STATES y g NUCLEAR REGULATORY COMMISSION g  : E W/ SHING TON, D. C. 20655 June 10, 1988

/

Docket No. : 50-155 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201

Dear Mr. Berry:

SUBJECT:

BIG ROCK POINT OFFSITE DOSE CALCULATION MANUAL (TAC NO. 63138)

You provided an Offsite Dose Calculation Manual (0DCM), dated December 1,1984, for Big Rock Point Plant (BRP). That document was accepted by us on August 26, 1985. Subsequently, you submitted Revisions 1 and 2 to the ODCM accompanying Consumers Power Company letters dated February 28, 1986, and August 27, 1987, respectively.

The Revision 2 ODCM for BRP has been reviewed for us in its entirety by our contractor, EG&G Idaho, Inc. Their discussion and comments are contained in their Technical Evaluation Report (TER) EGG-PHY-8079, which is enclosed with this letter. We agree with the contractor that your ODCM uses methods that are, in general, consistent with staff guidelines and is an acceptable interim reference.

However, the TER lists a number of discrepancies and suggestions, some typo-graphical in nature, and others dealing with technical issues. Since these questions involve refinements of a basically sound document, there is no need for immediate action. Instead, we ask that you address the points raised in the Conclusions section of the TER within 6 months in a new revision of the ODCH.

The request in this letter affects fewer than 10 respondents; therefore OMB clearance is not required under PL 96-511.

Sincerely,

/

Wayne E. Scott, Jr., Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects

Enclosure:

As stated cc w/ enclosure:

See attached

I a Mr. Kenneth W. Berry Consumers Power Compa 3 Big Rock Point Plant cc:

Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue l: Jackson, Michigan 49201 l-l Mr. Thomas W. E1 ward Plant Manager Big Rock Point Plant 10269 U.S. 31 North Charlevoix, Michigan 49720 Mr. Bud Heeres County Commissioner 303 Sheridan Charlevoix, Michigan 49720 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Regional Administrator, Region III U.S. Nuclear Regulatory Commission l 799 Roosevelt Road

! Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 20035 Lansing, Michigan 48909 U.S. Nuclear Regulatory Commission Resident Inspector Office Big Rock Point Plant 10253 U.S. 31 North Charlevoix, Michigan 49720

- - - - _ _ - - - - - - - - - - - - - - - - - - - - - -