ML20196A422: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:_ .    .            _  _ _ _          _      _.
,  ,,        ,
      ' In Reply Aefer To:
  '
                                                JUN 2 319E
          Docket: 50-E98/88-17
          Nebraska Public Power District
          ATTN: George A. Trevors
                  Division Manager - Nuclear Support
          P.O. Box 499
          Columbus, NE 68601
          Gentlemen:
          This refers to the inspection conducted by Messrs. C. E. Johnson, A.- Singh, and
          R. V. Azua of this office during the period May 16-17 and 23-27,1988, of
          activities authorized'by NRC Operating License DPR-45 for the Cooper Nuclear
          Station (CNS), and to the discussion of our findings with Mr. G. R. Horn, and
          other members of your staff at the conclusion of the inspection.
          Areas examined during the inspection included the containment integrated leak
          rate test and the operability evaluation of essential piping systems. Within
          these areas, the inspection consisted of selective examination of procedures
          and representative records, interviews with personnel, and observations by the
          NRC inspectors.      The inspection findings are documented in the enclosed
          inspection report.
          During this inspection, it was found that certain of your activities were in
          violation of NRC requirements.      An individual, without direction and of his own
          volition, altered the position of several valves that had been visibly tagged        I
          for the containment integrated leak rate test, thus violating the procedure for
          this test.    The technician took this action thinking-that he was correcting an
          improper valve alignment. His actions had the potential to invalidate the test
          if they had not been identified in time. This is considered to be a serious
          breach of discipline. It puts into question the effectiveness of CNS's
          training program when an individual could jeopardize a test due to his
          seeming lack of understanding of the purpose of equipment and valve tagging.
          You are required to respond to this violation, in writing, in accordance with
          the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2,
          Title 10, Code of Federal Regulations.      Your response should be based on the
          specifics contained in the Notice of Violation enclosed with this letter. In
          your response, please address management's actions to assure a discipline
          exists among plant workers that would prevent the unauthorized manipulation of
          tagged equipment.
          The response directed by this letter and the acco...panying Notice is not subject
          to the clearance procedures of the Office of Management and Budget as required
          by the Paperwork Reduction Act of 1980, PL 96-511.
          *RIV:TPS:DRS *TPS:DRS            *TPS:DRS          *C:TPS:DRS  *D:DRS
          RVAzua;1w        ASingh          CEJohnson          WCSeidle      JLMilhoan
            / /88              / /88          / /88              / /88        / /88
          *DRP/C            D:D      @Y    Reconcur
          EJHoller          LJCallan        WCSeidle
            / /88          l, /$/88        y/j3/88
          *Previously concurred                                                              g
          8806300039 880623
          {DR ADOCK 05000298    DCD
                                                                                          gMD/
                      _
                                                m
 
  .  ..      ..
t  <
          .
            Nebraska Public Power District            -2-
            Should you have any questions concerning this inspection, we will be pleased to
            discuss them with you.
                                                        Sincerely,
"
                                                      Original Signed !Jy
                                                          L J. Callan
                                                        L. J. Callan, Director
                                                        Division of Reactor Projects
            Enclosures:
            1.    Appendix A - Notice of Violation
            2.    Appendix 8 - NRC Inspection Report
                    50-298/88-17
            cc w/ enclosures:
            Cooper Nuclear Station
            ATTH:    Guy Horn, Division Manager
                      of Nuclear Operations                                                l
            P.O. Box 98
            Brownville, Nebraska 68321
            Kansas Radiation Control Program Director
            Nebraska Radiation Control Program Director
            bec to DMB (IE-01)
            bcc distrib. by RIV:                                                            1
            *RRI                                  R. D. Martin, RA
            *Section Chief (DRP/C)                Lisa Shea, RM/ALF                        l
            *RPSB-DRSS                          * MIS System                              l
            *RIV File                            * Project Engineer, DRP/C
            *RSTS Operator                      *W. Long, NRR Project Manager
            *DRS                                *C. E. Johnson
            *DRP                                  G. F. Sanborn, E0
            *A. Singh                            *R. V. Azua
            W. C. Seidle                          P. T. Kuo, NRR/EMEB
            *w/766
}}
}}

Latest revision as of 11:39, 13 November 2020

Forwards Insp Rept 50-298/88-17 on 880516-17 & 23-27 & Notice of Violation
ML20196A422
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/23/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20196A425 List:
References
NUDOCS 8806300039
Download: ML20196A422 (2)


See also: IR 05000298/1988017

Text

_ . . _ _ _ _ _ _.

, ,, ,

' In Reply Aefer To:

'

JUN 2 319E

Docket: 50-E98/88-17

Nebraska Public Power District

ATTN: George A. Trevors

Division Manager - Nuclear Support

P.O. Box 499

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Messrs. C. E. Johnson, A.- Singh, and

R. V. Azua of this office during the period May 16-17 and 23-27,1988, of

activities authorized'by NRC Operating License DPR-45 for the Cooper Nuclear

Station (CNS), and to the discussion of our findings with Mr. G. R. Horn, and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included the containment integrated leak

rate test and the operability evaluation of essential piping systems. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

NRC inspectors. The inspection findings are documented in the enclosed

inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. An individual, without direction and of his own

volition, altered the position of several valves that had been visibly tagged I

for the containment integrated leak rate test, thus violating the procedure for

this test. The technician took this action thinking-that he was correcting an

improper valve alignment. His actions had the potential to invalidate the test

if they had not been identified in time. This is considered to be a serious

breach of discipline. It puts into question the effectiveness of CNS's

training program when an individual could jeopardize a test due to his

seeming lack of understanding of the purpose of equipment and valve tagging.

You are required to respond to this violation, in writing, in accordance with

the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations. Your response should be based on the

specifics contained in the Notice of Violation enclosed with this letter. In

your response, please address management's actions to assure a discipline

exists among plant workers that would prevent the unauthorized manipulation of

tagged equipment.

The response directed by this letter and the acco...panying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

  • RIV:TPS:DRS *TPS:DRS *TPS:DRS *C:TPS:DRS *D:DRS

RVAzua;1w ASingh CEJohnson WCSeidle JLMilhoan

/ /88 / /88 / /88 / /88 / /88

  • DRP/C D:D @Y Reconcur

EJHoller LJCallan WCSeidle

/ /88 l, /$/88 y/j3/88

  • Previously concurred g

8806300039 880623

{DR ADOCK 05000298 DCD

gMD/

_

m

. .. ..

t <

.

Nebraska Public Power District -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

"

Original Signed !Jy

L J. Callan

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix 8 - NRC Inspection Report

50-298/88-17

cc w/ enclosures:

Cooper Nuclear Station

ATTH: Guy Horn, Division Manager

of Nuclear Operations l

P.O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE-01)

bcc distrib. by RIV: 1

  • RRI R. D. Martin, RA
  • Section Chief (DRP/C) Lisa Shea, RM/ALF l
  • RPSB-DRSS * MIS System l
  • RIV File * Project Engineer, DRP/C
  • RSTS Operator *W. Long, NRR Project Manager
  • DRS *C. E. Johnson
  • DRP G. F. Sanborn, E0
  • A. Singh *R. V. Azua

W. C. Seidle P. T. Kuo, NRR/EMEB

  • w/766