ML033500238: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Z.'-  ! -
R5            An Energy East Company ROCHESTERGASANDELECTRIC CORPORA11ON  89EASTAVENUE, ROCHESTER, 14649-0001
* 585546-2700                ww.rge.om December 9, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:      Robert Clark Project Directorate 1-1 Washington, DC 20555
 
==Subject:==
Monthly Report for November 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Clark:==
 
Pursuantto Ginna ImprovedTechnical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November 2003.
Very truly yours, a'da.
A. Widay Plant Manager xc:        U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
 
OPERATING DATA REPORT DOCKET NO.          50 -244 UNIT NAME            Gi nna 1 DATE                    'cember 08, 2003 COMPLETED BY        Jo hn Walden TELEPHONE            ( 35) 771-3588 REPORTING PERIOD:            November 2003
: 1. Design Electrical Rating                              470.00
: 2. Maximum Dependable Capacity (MWe-Net)                480.00 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical            720.00        7,237.32        246,254.22
: 4. Number of Hours Generator On-line                  720.00          7,182.60        243,041.70
: 5. Reserve Shutdown Hours                                0.00            0.00            8.50
: 6. Net Electrical Energy Generated (MWHrs)          357,350.00      3,499,521.00    110,828,430.0 UNIT SHUTDOWNS Type                        Method of F: Forced Duration              Shutting          Cause & Corrective Action No.      Date    S: Scheduled (Hours) Reason 1 Down 2                          Comments 1                                                      2 Reason:                                            Method:
A Equipment Failure (Explain)                      1 Manual B Maintenance or Test                              2 Manual Trip/Scram C Refueling                                        3 Automatic Trip/Scram D Regulatory Restriction                            4 Continuation E Operator Training & License Examination          5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
 
==SUMMARY==
: The unit operated at full power for the entire month of November. Average power for the month was 99.6%.
Page 1 of 1}}

Latest revision as of 06:30, 25 March 2020

November 2003 Monthly Operating Report for R.E. Ginna
ML033500238
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/09/2003
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML033500238 (2)


Text

Z.'-  ! -

R5 An Energy East Company ROCHESTERGASANDELECTRIC CORPORA11ON 89EASTAVENUE, ROCHESTER, 14649-0001

  • 585546-2700 ww.rge.om December 9, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for November 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuantto Ginna ImprovedTechnical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November 2003.

Very truly yours, a'da.

A. Widay Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT DOCKET NO. 50 -244 UNIT NAME Gi nna 1 DATE 'cember 08, 2003 COMPLETED BY Jo hn Walden TELEPHONE ( 35) 771-3588 REPORTING PERIOD: November 2003

1. Design Electrical Rating 470.00
2. Maximum Dependable Capacity (MWe-Net) 480.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 7,237.32 246,254.22
4. Number of Hours Generator On-line 720.00 7,182.60 243,041.70
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical Energy Generated (MWHrs) 357,350.00 3,499,521.00 110,828,430.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The unit operated at full power for the entire month of November. Average power for the month was 99.6%.

Page 1 of 1