{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR: 9403220131 DOC.DATE: 94/03/14 NOTARIZED:
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION"KNORR,J.E.
ACCESSION NBR: 9403220131             DOC. DATE: 94/03/14   NOTARIZED: NO           DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                 C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light               C 05000251 AUTH. NAME           AUTHOR AFFILIATION "KNORR,J.E.           Florida     Power & Light Co.
Florida Power&Light Co.PLUNKETT,J.F.
PLUNKETT,J.F.       Florida     Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Feb 1994 for Turkey Point Units 3&.4.W/940314 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL f SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D A RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DOA R/PCS.OEAB EG FILE 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts           for Feb 1994 for Turkey Point Units           D 3 &. 4.W/940314     ltr.
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 K p~d'0')~J~1~~aa 1 t , e  
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL                 f   SIZE:
..Box 029100, Miami, FL, 33102-9100 MAR 14 Sg<L-94-057 10 CFR 50.36 U.ST Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)
Re: Turkey Point Units 3 and 4 Docket Nos..50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9'.5, and the guidance of NUREG-0020, attached are the February 1994 Operating Status and Summary'f Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Plant TFP/JEK/jk Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9403220131; 940314 PDR ADOCK,',OS000250
NOTES:
';-'R--'--,'.-'.'.P..DR"'," 2 CO~~')fl f;A m an FPL.Group company 4U'Q O~9 gpg' I 4C C V I f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT 3 MARCH 11 1994 J.E.Knorr 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)2/01/94 2/02/94 2/03/94 2/04/94 2/05/94 2/06/94 2/07/94 2/08/94 2/09/94 2/10/94 2/11/94 2/12/94 2/13/94 2/14/94 2/15/94 2/16/94 2/17/94 2/18/94 2/19/94 2/20/94 2/21/94 2/22/94 2/23/94 2/24/94 2/25/94 2/26/94 2/27/94 2/28/94 694 702 706 703 695 689 685 684 683 683 681 681 678 676 691 691 695 699 697 688 14 143 671 678 678 678 682 689 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: March 11 1994 COMPLETED BY: J.E.Knorr TELEPHONE:
A RECIPIENT               COPIES          RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL          D PD2-2 PD                     1    1    CROTEAU,R              1    1 D
305 246-6757 REPORT MONTH FEBRUARY 1994 No.Date Type Duration (Hours)Reason Nethod of Shutting Down 3 Reactor Licensee Event Reports System Code Co ponep.Code Cause 4 Corrective Action to Prevent Recurrence 04 022194 05 022294 31.2 0.0 N/A N/A CC PIPEXX PIPEXX Reduced power to 2%to repair 3D MSR Drain Line Steam Generator Chemistry hold-point at 30i P-Pozced S-Scheduled Reason A-Equipment Failure B-Y~intenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Examination P-Administrative G-Operational Error (Explain)H-Other (Explain)Nethod 1-Ymnual 2-Nanual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Ins ructions for Preparation of Data Entry Sheets Licensee Event Report (LER)Pile (NUREG-0)61)
INTERNAL: AEOD/DOA                       1    1    AEOD/DSP/TPAB          1    1 R/PCS. OEAB             1    1    NRR/DRIL/RPEB          1    1 EG FILE         01          1    1    RGN2                    1    1 EXTERNAL: EG&G BRYCE,J.H                 1     1     NRC PDR                 1   1 NSIC                        1     1 D
Exhibit 1-Same Source r L I g t 0 OPEflATlNG STATUS OPFRAT ING DATA REPORT DOCKET NO 50-250 DATE 3/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3?.RFPOflTING PERIOD: FEBRUARY 1994 3, 1 ICFNSED THERMAL POWER (MWT): 2200 4, NAMEPl.ATE RATING (GROSS MWE): 760 DESIGN FLLCTR ICAl.RATING (NET MWE): 693 6.MAXlMUM DEPFNDABLE CAPAClTY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE f>.HOffRS IN REPORT PERIOD: 1?NffMBER OF ffOURS REACTOR WAS CRITICAL 13.REACTOR RFSERVE.SHUTDOWN HOURS 14.cfOURS GFNERAIOR ON-LINE 15.UNI'1 RESERVf: StfU100WN HOURS 1/.GROSS ELECTRICAL ENERGY GENERATEO (MWH)18.NE1 hf.EC 1'R I CAL FNERGY GENERATEO (MWH)19.UNlT SERVICE FACIOR 20.UNIT AVAILABILI IY FACTOR 21.CAPACITY FACTOR (USING MDC NET)??.CAPAC11Y FACTOR (USING DER NET)?3.UNIT FORCED OUfAGE RATE 24.SffUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 14 REFUELING SCffEDULED FOR 4/94 672 672.0 0.0 640.8 1391 126 454310 432803 95.4 95.4 96.7 92.9 4.6 1416 1416.0 0.0 1368.2 2975327 977835 932010 96.6 96.6 98.8 95.0 3.4 186153.6 122676.2 844.4 120901.5 251 1 15165 8055965 1 76201515 64.9 65.0 62.5 59.1 11.7 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
D D
t~  
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               11   ENCL   11
 
K p
              '0')~
      ~ d J~
1
                ~
            ~
aa 1
t
        , e
 
                                                    .. Box 029100, Miami, FL, 33102-9100 MAR     14 Sg<
L-94-057 10 CFR 50.36 U. ST   Nuclear Regulatory Commission Attn:         Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:       Turkey Point Units 3 and 4 Docket Nos.. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and                   4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the February 1994 Operating Status and Summary'f Operating Experience Reports for Turkey Point Units 3 and 4.
Very     truly       yours, T. F. Plunkett Vice President Turkey Point Plant TFP/JEK/jk Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9403220131; 940314
                '.- '
-'RPDR--'- -,ADOCK,',OS000250
                          . '.P..DR" ',"
                                          ';
gpg'
  ')fl CO~~
2 4U'f; A m O~9 an FPL.Group company
 
I 4C C
V I
f
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT          TURKEY POINT 3 DATE          MARCH 11   1994 COMPLETED BY  J. E. Knorr TELEPHONE      305-246-6757 MONTH FEBRUARY   1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94   694 2/02/94   702 2/03/94   706 2/04/94   703 2/05/94   695 2/06/94   689 2/07/94   685 2/08/94   684 2/09/94   683 2/10/94   683 2/11/94   681 2/12/94   681 2/13/94   678 2/14/94   676 2/15/94   691 2/16/94   691 2/17/94   695 2/18/94   699 2/19/94   697 2/20/94   688 2/21/94     14 2/22/94   143 2/23/94   671 2/24/94   678 2/25/94   678 2/26/94   678 2/27/94   682 2/28/94   689
 
UNIT     SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.               50-250 UNIT NAME:               TURKEY POINT UNIT 3 DATE:                     March 11 1994 COMPLETED BY:             J. E. Knorr TELEPHONE:                 305 246-6757 REPORT MONTH FEBRUARY 1994 No. Date   Type Duration     Reason   Nethod   of Licensee System Co ponep.               Cause   4 Corrective Action to (Hours)                Shutting      Event    Code        Code                        Prevent Recurrence Down 3
Reports Reactor 04   022194     31. 2                                   N/A       CC     PIPEXX       Reduced power   to 2% to repair 3D MSR Drain Line 05    022294      0.0                                    N/A              PIPEXX      Steam Generator Chemistry hold-point at 30i P Pozced                Reason                        Nethod                        Exhibit  G - Ins ructions        Exhibit  -  Same Source S Scheduled             A - Equipment Failure         1  Ymnual                    for Preparation of    Data 1
B Y~intenance or Test       2 - Nanual Scram              Entry Sheets Licensee C - Refueling                 3 - Automatic Scram          Event Report (LER)    Pile D - Regulatory restriction   4 - Continued                (NUREG-0)61)
E - Operator Training 4       5 - Load Reduction License Examination      9 - Other (Explain)
P  Administrative G - Operational Error (Explain)
H - Other (Explain)
 
L r
I g t 0
 
OPFRAT ING DATA REPORT DOCKET NO           50   - 250 DATE                 3/ 7/94 COMPLETED BY   J. E. KNORR TELEPHONE     305/246/6757 OPEflATlNG STATUS
: 1. UNIT NAME: TURKEY POINT         UNIT 3
?. RFPOflTING PERIOD: FEBRUARY 1994 3, 1 ICFNSED   THERMAL POWER (MWT):                     2200 4, NAMEPl.ATE RATING (GROSS MWE):                       760 DESIGN FLLCTR ICAl. RATING (NET MWE):                 693
: 6. MAXlMUM DEPFNDABLE CAPAClTY (GROSS MWE):             699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):               666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH           7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET         MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE f>. HOffRS IN REPORT PERIOD:                             672      1416        186153. 6 1?   NffMBER OF ffOURS REACTOR WAS CRITICAL               672.0    1416. 0      122676. 2
: 13. REACTOR RFSERVE. SHUTDOWN HOURS                           0.0      0.0            844.4
: 14. cfOURS GFNERAIOR ON-LINE                               640.8    1368.2      120901. 5
: 15. UNI'1 RESERVf: StfU100WN HOURS 1391 126  2975327    251  1  15165 1/. GROSS ELECTRICAL ENERGY GENERATEO (MWH)             454310    977835      8055965    1
: 18. NE1 hf.EC 1'R I CAL FNERGY GENERATEO (MWH)         432803    932010      76201515
: 19. UNlT SERVICE FACIOR                                     95.4      96. 6            64.9
: 20. UNIT AVAILABILIIY FACTOR                               95.4      96. 6            65.0
: 21. CAPACITY FACTOR (USING MDC NET)                         96.7      98.8              62.5
??. CAPAC11Y FACTOR (USING DER NET)                         92.9      95.0              59. 1
?3. UNIT FORCED OUfAGE RATE                                   4.6      3.4              11.7
: 24. SffUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 14 REFUELING SCffEDULED FOR 4/94
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD,     ESTIMATED DATE OF STARTUP:
 
t ~


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY'ELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.             50-250 UNIT:                  Turke Point   3 DATE:                  March 11 1994 COMPLETED              J. E. Knorr BY'ELEPHONE:
50-250 Turke Point 3 March 11 1994 J.E.Knorr 305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 3 began the month at essentially 100%and maintained that level until forced to reduce power to approximately 2%to repair the 3D moisture separator reheater drain line on February 21.The unit had a hold at 30%power for steam generator chemistry on February 22 and returned to 100%power that same day.The Unit remained at essentially 100%power for the remainder of the month.
305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 3 began the month at essentially 100% and maintained that level until forced to reduce power to approximately 2% to repair the 3D moisture separator reheater drain line on February 21.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT 4 MARCH ll 1994 J.E.Knorr 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)2/01/94 2/02/94 2/03/94 2/04/94 2/05/94 2/06/94 2/07/94 2/08/94 2/09/94 2/10/94 2/11/94 2/12/94 2/13/94 2/14/94 2/15/94 2/16/94 2/17/94 2/18/94 2/19/94 2/20/94 2/21/94 2/22/94 2/23/94 2/24/94 2/25/94 2/26/94 2/27/94 2/28/94 143 525 701 699 694 690 687 687 686 685 684 684 681 681 691 692 695 699 699 691 682 681 682 682 679 680 686 692 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-251 UNIT NAME: TURKEY POINT UNIT 4 DATE: MARCH 11 1994 COMPLETED BY: J.E.Knorr TELEPHONE:
The unit had a hold at 30% power for steam generator chemistry on February 22 and returned to 100% power that same day.             The Unit remained at essentially 100 power for the remainder of the
305 246-6757 REPORT MONTH FEBRUARY 1994 No.Date Typel Duration (Hours)Reason Yothod of Shutting Down Reactor Licensee Event Reportf Syste4>Code Coupon op Code cause 4 corrective Action to Prevent Recurrence 01 020194 38.5 N/A CH VALVEX REPAIR TO FEEDNATER REG VALVE FCV 4-498 F-Forced S-Scheduled Reason A-Equip"ent Failure 8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 6 License Exanination F-Adninistratlve G-Operational Error (Explain)H-Other (Explain)Yethod 1-Nanual 2-Nanual scran 3-Auto"-atlc Scran 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry sheets Licensee Event Report (LER)File (NUREG-0161)
                                  %
Exhibit 1-Same Source H)a t~I, f w J 4~)II)4'II OPERATING DA'fA REPORT OPERATING STATUS DOCKET NO 50-251 DATE 3/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: FEBRUARY 1994 3.LICENSED 1HERMAL POWER (MWT): 2200 4 NAMEPLATE RATING (GROSS MWE): 760 b.DESIGN ELECfRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLF CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE I.AST REPOR f, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTO-CUMULATIVE 1 1.HOURS IN RFPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LiNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECIRICAL ENERGY GENERATED (MWH)18.NET ELFCTRICAL ENERGY GENERATED (MWH)19.UNlr SERVICE FACTOR 20.UNIf AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)27.CAPACITY FAC'fDR (USING DER NET)23.UNIT FORCED OUTAGF RATE 24.S>>ufDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE 672 672.0 0.0 672.0 1435483 467230 445373 100.0 100.0 99.5 95.6 0.0 1416 1416.0 0.0 1416.0 3068984 1004470 958255 100.0 100.0 101.6 97.7 0.0 179885.0 118696.3 166.6 114741.0 242128939 77358440 73193487 63.8 64.1 62.1 58.7 11.2 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:  
month.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT        TURKEY POINT DATE COMPLETED BY MARCH J. E.
ll 1994 Knorr 4
TELEPHONE    305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94   143 2/02/94   525 2/03/94   701 2/04/94   699 2/05/94   694 2/06/94   690 2/07/94   687 2/08/94   687 2/09/94   686 2/10/94   685 2/11/94   684 2/12/94   684 2/13/94   681 2/14/94   681 2/15/94   691 2/16/94   692 2/17/94   695 2/18/94   699 2/19/94   699 2/20/94   691 2/21/94   682 2/22/94   681 2/23/94   682 2/24/94   682 2/25/94   679 2/26/94   680 2/27/94   686 2/28/94   692
 
UNIT     SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.               50-251 UNIT NAME:               TURKEY POINT UNIT 4 DATE:                   MARCH 11         1994 COMPLETED BY:           J. E. Knorr TELEPHONE:                 305     246-6757 REPORT MONTH FEBRUARY 1994 No. Date   Typel Duration   Reason     Yothod of   Licensee   Syste4>   Coupon op               cause 4 corrective Action to (Hours)                Shutting      Event      Code      Code                        Prevent Recurrence Down      Reportf Reactor 01     020194       38.5                             N/A         CH       VALVEX       REPAIR TO FEEDNATER REG VALVE FCV 4-498 F Forced                  Reason                          Yethod                        Exhibit G - Instructions        Exhibit 1 - Same Source S - Scheduled             A - Equip"ent Failure           1 - Nanual                    for Preparation of Data 8 - Maintenance or Test         2 - Nanual scran               Entry sheets Licensee C - Refueling                  3 Auto"-atlc Scran           Event Report (LER) File D  Regulatory restriction      4 - Continued                 (NUREG-0161)
E - Operator Training 6        5 - Load Reduction Exanination      9 - Other (Explain)
F - License Adninistratlve G Operational Error (Explain)
H  Other (Explain)
 
H
                    )a t ~
I, f
w J           4
    ~ )II)     4 '
II
 
OPERATING DA'fA REPORT DOCKET NO           50 - 251 DATE                 3/ 7/94 COMPLETED BY   J. E. KNORR TELEPHONE       305/246/6757 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT     UNIT 4
: 2. REPORTING PERIOD: FEBRUARY 1994
: 3. LICENSED 1HERMAL POWER (MWT):                     2200 4   NAMEPLATE RATING (GROSS MWE):                     760
: b. DESIGN ELECfRICAL RATING (NET MWE):               693
: 6. MAXIMUM DEPENDABLF CAPACITY (GROSS MWE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH       7)
SINCE I.AST REPOR f, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET     MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTO-     CUMULATIVE 1 1. HOURS IN RFPORT PERIOD:                            672      1416        179885.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL             672.0    1416.0      118696.3
: 13. REACTOR RESERVE SHUTDOWN HOURS                     0.0        0.0          166.6
: 14. HOURS GENERATOR ON-LiNE                           672.0    1416.0      114741. 0
: 15. UNIT RESERVE SHUTDOWN HOURS
: 16. GROSS THERMAL ENERGY GENERATED (MWH)           1435483  3068984      242128939
: 17. GROSS ELECIRICAL ENERGY GENERATED (MWH)         467230  1004470      77358440
: 18. NET ELFCTRICAL ENERGY GENERATED (MWH)           445373    958255      73193487 19 . UNlr SERVICE FACTOR                               100.0      100.0            63.8
: 20. UNIf AVAILABILITYFACTOR                          100. 0    100.0            64.1
: 21. CAPACITY FACTOR (USING MDC NET)                   99.5      101. 6          62.1
: 27. CAPACITY FAC'fDR (USING DER NET)                   95.6      97.7            58.7
: 23. UNIT FORCED OUTAGF RATE                             0.0        0.0            11.2
: 24. S>>ufDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD,   ESTIMATED DATE OF STARTUP:


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT:        Turke Point 4 DATE          March 11 1994 COMPLETE BY:  J. E. Knorr TELEPHONE:    305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 4 began the month of February at reduced power of approximately 40% to repair Feedwater Reg Valve FCV 4-498.
50-251 Turke Point 4 March 11 1994 J.E.Knorr 305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 4 began the month of February at reduced power of approximately 40%to repair Feedwater Reg Valve FCV 4-498.The Unit was returned to essentially 100%power on February 2 and remained at that level through the end of the month.}}
The Unit was returned to essentially 100% power on February   2 and remained at that level through the end of the month.}}

Revision as of 08:37, 22 October 2019

Monthly Operating Repts for Feb 1994 for Turkey Point Units 3 & 4.W/940314 Ltr
ML17352A480
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/14/1994
From: Knorr J, Plunkett J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-057, L-94-57, NUDOCS 9403220131
Download: ML17352A480 (15)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9403220131 DOC. DATE: 94/03/14 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION "KNORR,J.E. Florida Power & Light Co.

PLUNKETT,J.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1994 for Turkey Point Units D 3 &. 4.W/940314 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL f SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 CROTEAU,R 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 R/PCS. OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FILE 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

K p

'0')~

~ d J~

1

~

~

aa 1

t

, e

.. Box 029100, Miami, FL, 33102-9100 MAR 14 Sg<

L-94-057 10 CFR 50.36 U. ST Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the February 1994 Operating Status and Summary'f Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/JEK/jk Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9403220131; 940314

'.- '

-'RPDR--'- -,ADOCK,',OS000250

. '.P..DR" ',"

';

gpg'

')fl CO~~

2 4U'Q f; A m O~9 an FPL.Group company

I 4C C

V I

f

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT 3 DATE MARCH 11 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94 694 2/02/94 702 2/03/94 706 2/04/94 703 2/05/94 695 2/06/94 689 2/07/94 685 2/08/94 684 2/09/94 683 2/10/94 683 2/11/94 681 2/12/94 681 2/13/94 678 2/14/94 676 2/15/94 691 2/16/94 691 2/17/94 695 2/18/94 699 2/19/94 697 2/20/94 688 2/21/94 14 2/22/94 143 2/23/94 671 2/24/94 678 2/25/94 678 2/26/94 678 2/27/94 682 2/28/94 689

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: March 11 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 No. Date Type Duration Reason Nethod of Licensee System Co ponep. Cause 4 Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down 3

Reports Reactor 04 022194 31. 2 N/A CC PIPEXX Reduced power to 2% to repair 3D MSR Drain Line 05 022294 0.0 N/A PIPEXX Steam Generator Chemistry hold-point at 30i P Pozced Reason Nethod Exhibit G - Ins ructions Exhibit - Same Source S Scheduled A - Equipment Failure 1 Ymnual for Preparation of Data 1

B Y~intenance or Test 2 - Nanual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Pile D - Regulatory restriction 4 - Continued (NUREG-0)61)

E - Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)

P Administrative G - Operational Error (Explain)

H - Other (Explain)

L r

I g t 0

OPFRAT ING DATA REPORT DOCKET NO 50 - 250 DATE 3/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPEflATlNG STATUS

1. UNIT NAME: TURKEY POINT UNIT 3

?. RFPOflTING PERIOD: FEBRUARY 1994 3, 1 ICFNSED THERMAL POWER (MWT): 2200 4, NAMEPl.ATE RATING (GROSS MWE): 760 DESIGN FLLCTR ICAl. RATING (NET MWE): 693

6. MAXlMUM DEPFNDABLE CAPAClTY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE f>. HOffRS IN REPORT PERIOD: 672 1416 186153. 6 1? NffMBER OF ffOURS REACTOR WAS CRITICAL 672.0 1416. 0 122676. 2

13. REACTOR RFSERVE. SHUTDOWN HOURS 0.0 0.0 844.4
14. cfOURS GFNERAIOR ON-LINE 640.8 1368.2 120901. 5
15. UNI'1 RESERVf: StfU100WN HOURS 1391 126 2975327 251 1 15165 1/. GROSS ELECTRICAL ENERGY GENERATEO (MWH) 454310 977835 8055965 1
18. NE1 hf.EC 1'R I CAL FNERGY GENERATEO (MWH) 432803 932010 76201515
19. UNlT SERVICE FACIOR 95.4 96. 6 64.9
20. UNIT AVAILABILIIY FACTOR 95.4 96. 6 65.0
21. CAPACITY FACTOR (USING MDC NET) 96.7 98.8 62.5

??. CAPAC11Y FACTOR (USING DER NET) 92.9 95.0 59. 1

?3. UNIT FORCED OUfAGE RATE 4.6 3.4 11.7

24. SffUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 14 REFUELING SCffEDULED FOR 4/94
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

t ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE: March 11 1994 COMPLETED J. E. Knorr BY'ELEPHONE:

305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 3 began the month at essentially 100% and maintained that level until forced to reduce power to approximately 2% to repair the 3D moisture separator reheater drain line on February 21.

The unit had a hold at 30% power for steam generator chemistry on February 22 and returned to 100% power that same day. The Unit remained at essentially 100 power for the remainder of the

%

month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT DATE COMPLETED BY MARCH J. E.

ll 1994 Knorr 4

TELEPHONE 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94 143 2/02/94 525 2/03/94 701 2/04/94 699 2/05/94 694 2/06/94 690 2/07/94 687 2/08/94 687 2/09/94 686 2/10/94 685 2/11/94 684 2/12/94 684 2/13/94 681 2/14/94 681 2/15/94 691 2/16/94 692 2/17/94 695 2/18/94 699 2/19/94 699 2/20/94 691 2/21/94 682 2/22/94 681 2/23/94 682 2/24/94 682 2/25/94 679 2/26/94 680 2/27/94 686 2/28/94 692

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: TURKEY POINT UNIT 4 DATE: MARCH 11 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 No. Date Typel Duration Reason Yothod of Licensee Syste4> Coupon op cause 4 corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Reportf Reactor 01 020194 38.5 N/A CH VALVEX REPAIR TO FEEDNATER REG VALVE FCV 4-498 F Forced Reason Yethod Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equip"ent Failure 1 - Nanual for Preparation of Data 8 - Maintenance or Test 2 - Nanual scran Entry sheets Licensee C - Refueling 3 Auto"-atlc Scran Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 6 5 - Load Reduction Exanination 9 - Other (Explain)

F - License Adninistratlve G Operational Error (Explain)

H Other (Explain)

H

)a t ~

I, f

w J 4

~ )II) 4 '

II

OPERATING DA'fA REPORT DOCKET NO 50 - 251 DATE 3/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: FEBRUARY 1994
3. LICENSED 1HERMAL POWER (MWT): 2200 4 NAMEPLATE RATING (GROSS MWE): 760
b. DESIGN ELECfRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLF CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE I.AST REPOR f, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTO- CUMULATIVE 1 1. HOURS IN RFPORT PERIOD: 672 1416 179885.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1416.0 118696.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LiNE 672.0 1416.0 114741. 0
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1435483 3068984 242128939
17. GROSS ELECIRICAL ENERGY GENERATED (MWH) 467230 1004470 77358440
18. NET ELFCTRICAL ENERGY GENERATED (MWH) 445373 958255 73193487 19 . UNlr SERVICE FACTOR 100.0 100.0 63.8
20. UNIf AVAILABILITYFACTOR 100. 0 100.0 64.1
21. CAPACITY FACTOR (USING MDC NET) 99.5 101. 6 62.1
27. CAPACITY FAC'fDR (USING DER NET) 95.6 97.7 58.7
23. UNIT FORCED OUTAGF RATE 0.0 0.0 11.2
24. S>>ufDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 4 DATE March 11 1994 COMPLETE BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 4 began the month of February at reduced power of approximately 40% to repair Feedwater Reg Valve FCV 4-498.

The Unit was returned to essentially 100% power on February 2 and remained at that level through the end of the month.