ML17352B168: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:P RI C)RIP'Y (ACCELERATLD RIDS PROCESSIi~
{{#Wiki_filter:P   RI C) RIP'Y (ACCELERATLD       RIDS PROCESSIi~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION KNORR,Z.E.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Florida Power&Light Co.PLUNKETT,J.F.
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                               C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                               C 05000251 AUTH. NAME               AUTHOR AFFILIATION KNORR,Z.E.               Florida       Power & Light Co.                                                     P PLUNKETT,J.F.           Florida       Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251 P.R  
RECIP.NAME               RECIPIENT AFFILIATION                                                           .R


==SUBJECT:==
==SUBJECT:==
Monthl rept for Apr 1995 for Turkey Point Units 3&4./950512 l DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DIS P/PI PB RGN2 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R~AXLE CENTRE 01 NRR/DOPS/OECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 U N YOTE TO ALL"RIDS" RECIPIENTS:
Monthl                           rept for Apr       1995     for   Turkey Point Units 3 & 4. /950512         l DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR                                   ENCL     SIZE:
PLEASE HELP US TO REDUCE iVKSTE!COYTACT'I'HE
TITLE: Monthly Operating Report (per Tech Specs)
'DOCL'WfEN'I'ONTROL DESK, ROOb,f PI-37 (EAT.504-083)TO ELDER I NATE YOL'R NAif L P ROif DISTRI 8 UTIOY LIS'I'S I'OR DOC!.'if EN'I'S YOI'ON" I'l I," D!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 MAY 12 1995 L-95-145 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
NOTES:
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the April 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point.'Plant i SQO>=9505i F0385 moe30--PDR ADOCK 05000250 R PDR an FPL Group co'mpany I
RECIPIENT                    COPIES                  RECIPIENT           COPIES ID CODE/NAME                 LTTR ENCL            ID    CODE/NAME      LTTR ENCL PD2-1 PD                           1        1      CROTEAU,R                  1    1 INTERNAL: AEOD/SPD/RRAB                       1        1    ~AXLE      CENTRE    01    1    1 NRR/DIS P/PI PB                   1        1      NRR/DOPS/OECB              1    1 RGN2                               1        1 EXTERNAL: LITCO BRYCE,J H                     1         1       NOAC                       1   1 NRC PDR                            1         1 U
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
ELDER N
REPORT MONTH No.Date Duration (Hours)Reason Method of Shutting Down Reactor'icensee Event Reportt System Code Component Code'ause 4 Corrective Action to Prevent Recurrence 02 950407 40.0 95-004 CRDRVE Replace contzol rod drive mechanism power supply F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory zestriction E-Operator Training 4 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Roport (LER)File (NVREG-0161)
YOTE TO ALL"RIDS" RECIPIENTS:
Exhibit 1-Same Source DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)4/01/95 4/02/95 4/03/95 4/04/95 4/05/95 4/06/95 4/07/95 4/08/95 4/09/95 4/10/95 4/11/95 4/12/95 4/13/95 4/14/95 4/15/95 4/16/95 4/17/95 4/18/95 4/19/95 4/20/95 4/21/95 4/22/95 4/23/95 4/24/95 4/25/95 4/26/95 4/27/95 4/28/95 4/29/9S 4/30/95 675 653 690 697 682 689 596 0 99 671 672 684 684 684 680 682 681 678 671 684 687 679 678 680 673 677 649 649 680 678
PLEASE HELP US TO REDUCE iVKSTE! COYTACT'I'HE 'DOCL'WfEN'I'ONTROL DESK, ROOb,f PI -37 (EAT. 504- 083 ) TO DISTRI 8 UTIOY LIS'I'S I'OR DOC!.'ifEN'I'S YOI 'ON"     I'l I NATE YOL'R NAifL P ROif I," D!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                         10       ENCL     10


OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 5/8/95 CONTACT J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: APRIL 1995 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 6.MAXZMUM DEPENDABLE CAPACITY (GROSS MHL~699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.I 10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE ll.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HO 17.GROSS ELECTRICAL ENERGY GENERATED (MWHj 18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FA 21.CAPACITY FACTOR (USING MD 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED SEPTEMBER 1995 719 683.7 0.0 679.0 0.0 T4 74256 478297 455084 94.4 94.4 95.0 91.3 5.6 2879 2843.7 0.0 2839.0 0.0 ETF6016 2024742 1930785 98.6 98.6 100.7 96.8 1.4 196376.6 131822.1 844.4 129887.7 121.8 Y7U331950 86786206 82125212 66.1 66.2 63.8 60.3 11.1 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
MAY 12 1995 L-95-145 10 CFR 50.36 U. S.      Nuclear Regulatory Commission Attn:        Document Control Desk Washington, D. C. 20555 Gentlemen:
DOCKET NO.UNIT DATE: COMPLETED BY: TELEPHONE:
Re:      Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and    4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the April 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
REPORT MONTH Unit 3 operated at essentially 100%reactor power until April 7.On April 7 the unit was manually shut down to replace a control rod drive power supply.The unit was manually tripped from the intermediate range when the power supply failed.The unit was returned to power on March 9, and remained at essentially 100%power for the remainder of the month.
Very    truly      yours, T. F.      Plunkett Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)4/01/95 4/02/95 4/03/95 4/04/95 4/05/95 4/06/95 4/07/95 4/08/95 4/09/95 4/10/95 4/11/95 4/12/95 4/13/95 4/14/95 4/15/95 4/16/95 4/17/95 4/18/95 4/19/95 4/20/95 4/21/95 4/22/95 4/23/95 4/24/95 4/25/95 4/26/95 4/27/95 4/28/95 4/29/95 4/30/95 679 657 693 696 694 688 686 686 683 677 685'85 684 683 682 683 681 679 679 679 680 679 677 683 672 678 695 682 683 685 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NQ.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
        .'Plant i SQO>=
REPORT MONTH No.Date Type Duration (Hours)Reason Method of Shutting Dawn Reactor Licensee Event Roportf System Code Component code'ause&Corzectivo Action to Pzovont Recurrence N/A P-Porced S-Scheduled Reason A-Equipmont Eailuro B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-othoz (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Xnstructions for Preparation of Data Entry Sheets Licensee Event Report (LER)Pile (NUREG-0161)
9505i F0385 moe30--
Exhibit 1-same Source OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 5/8/95 CONTACT J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: APRIL 1995 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760**RW: 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MRE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9./0.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 1.HOURS IN REPORT PERIOD: 2.NUMBER OF HOURS REACTOR 3.REACTOR RESERVE SHUTDOWN HOURS 4.HOURS GENERATOR ON-LINE 5.UNIT RESERVE SHUTDOWN HO 7.GROSS ELECTRICAL ENERGY GENERATED (MWHj 8.NET ELECTRICAL ENERGY GENERATED (MWH)9.UNIT SERVICE FACTOR 0.UNIT AVAILABILITY FA 1.CAPACITY FACTOR (USING MD ,2.CAPACITY FACTOR (USING DER NET).3.UN1T FORCED OUTAGE RATE.4.SHUTDOWNS SCHEDULED OVER NONE 719 719.0 0.0 719.0 0.0~TE933 514839 491394 100.0 100.0 102.6 98.6 0.0 2879 2757.1 0.0 2748.6 0.0 53%7069 1960091 1868438 95.5 95.5 97.4 93.6 4.5 190108.0 127604.8 166.6 123512.2 577.2 2EUE84778 83408741 78948024 65.0 65.3 63.3 59.9 10.8 5.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
PDR    ADOCK      05000250 R                        PDR an FPL Group co'mpany
DOCKET NO.UNIT'ATE'OMPLETE BY: TELEPHONE:
 
REPORT MONTH Unit 4 operated at essentially 100%reactor power for the entire month.}}
I UNIT SHUTDOWNS AND            POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No.        Date        Duration (Hours)
Reason      Method of Reactor'icensee Shutting Event Reportt System Code          Code'ause Component                4  Corrective Action to Prevent Recurrence Down 02        950407          40.0                                  95-004                  CRDRVE  Replace contzol rod  drive mechanism power supply F  Forced            Reason
                        - Equipment Failure        Method                    Exhibit  G - Instructions Exhibit    -      Source 1 - Manual 1    Same S  Scheduled        A                                                      for Preparation of  Data B  Maintenance or Test      2 - Manual Scram          Entry Sheets Licensee C - Refueling                3 - Automatic Scram      Event Roport (LER) File D  Regulatory zestriction  4 - Continued            (NVREG-0161)
E  Operator Training 4      5 - Load Reduction License Examination    9 - Other (Explain)
                        -
F G - Administrative Operational Error (Explain)
H - Other (Explain)
 
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 4/01/95      675 4/02/95      653 4/03/95      690 4/04/95      697 4/05/95      682 4/06/95      689 4/07/95      596 4/08/95        0 4/09/95        99 4/10/95      671 4/11/95      672 4/12/95      684 4/13/95      684 4/14/95      684 4/15/95      680 4/16/95      682 4/17/95      681 4/18/95      678 4/19/95      671 4/20/95      684 4/21/95      687 4/22/95      679 4/23/95      678 4/24/95      680 4/25/95      673 4/26/95      677 4/27/95      649 4/28/95      649 4/29/9S      680 4/30/95      678
 
OPERATING DATA REPORT DOCKET NO         50 - 250 DATE                 5/ 8/95 CONTACT         J. E. KNORR TELEPHONE     305/246/6757 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT   UNIT 3
: 2. REPORTING PERIOD:     APRIL 1995
: 3. LICENSED THERMAL POWER (MWT):                 2200
: 4. NAMEPLATE RATING (GROSS MWE):                   760
: 6. MAXZMUM DEPENDABLE CAPACITY (GROSS MHL~         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):         666
: 8. ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER       3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9.                                 I
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE ll.
12.
HOURS IN REPORT PERIOD:
NUMBER OF HOURS REACTOR 719 683.7 2879 2843.7 196376.6 131822.1
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0        844.4
: 14. HOURS GENERATOR ON-LINE                       679.0    2839.0      129887.7
: 15. UNIT RESERVE SHUTDOWN HO                         0.0        0.0        121.8 T4 74256    ETF6016    Y7U331950
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWHj       478297    2024742      86786206
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         455084    1930785      82125212
: 19. UNIT SERVICE FACTOR                             94.4      98.6          66.1
: 20. UNIT AVAILABILITYFA                            94.4      98.6          66.2
: 21. CAPACITY FACTOR (USING MD                       95.0      100.7          63.8
: 22. CAPACITY FACTOR (USING DER NET)                 91.3      96.8          60.3
: 23. UNIT FORCED OUTAGE RATE                         5.6        1.4          11.1
: 24. SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED SEPTEMBER 1995
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
DOCKET NO.
UNIT DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH Unit 3 operated at essentially 100% reactor power until April 7.
On April 7 the unit was manually shut down to replace a control rod drive power supply. The unit was manually tripped from the intermediate range when the power supply failed. The unit was returned to power on March 9, and remained at essentially 100%
power for the remainder of the month.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 4/01/95   679 4/02/95   657 4/03/95   693 4/04/95   696 4/05/95   694 4/06/95   688 4/07/95   686 4/08/95   686 4/09/95   683 4/10/95   677 4/11/95   685 4/12/95       '85 4/13/95   684 4/14/95   683 4/15/95   682 4/16/95   683 4/17/95   681 4/18/95   679 4/19/95   679 4/20/95   679 4/21/95   680 4/22/95   679 4/23/95   677 4/24/95   683 4/25/95   672 4/26/95   678 4/27/95   695 4/28/95   682 4/29/95   683 4/30/95   685
 
UNIT   SHUTDOWNS AND POWER REDUCTIONS DOCKET NQ.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No.       Date Type       Duration (Hours)
Reason     Method of Shutting Licensee Event Roportf System Code         code'ause Component              & Corzectivo Action to Pzovont Recurrence Dawn Reactor N/A P Porced              Reason                      Method                    Exhibit  G - Xnstructions Exhibit 1 -  same Source S Scheduled           A - Equipmont Eailuro       1 - Manual                for Preparation of  Data B - Maintenance or Test     2 - Manual Scram          Entry Sheets Licensee C - Refueling               3 - Automatic Scram      Event Report (LER)  Pile D - Regulatory restriction 4  Continued            (NUREG-0161)
E - Operator Training &     5  Load Reduction License Examination     9 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - othoz (Explain)
 
OPERATING DATA REPORT DOCKET NO           50 - 251 DATE                 5/ 8/95 CONTACT         J. E. KNORR TELEPHONE       305/246/6757 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT     UNIT 4
: 2. REPORTING PERIOD:     APRIL 1995
: 3. LICENSED THERMAL POWER (MWT):                   2200
: 4. NAMEPLATE RATING (GROSS MWE):                   760
                                ** RW:
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER         3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9.                                   /
: 0. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY     -YTD-   CUMULATIVE
: 1. HOURS IN REPORT PERIOD:                        719        2879        190108.0
: 2. NUMBER OF HOURS REACTOR                         719.0      2757.1      127604.8
: 3. REACTOR RESERVE SHUTDOWN HOURS                     0.0        0.0        166.6
: 4. HOURS GENERATOR ON-LINE                         719.0      2748.6      123512.2
: 5. UNIT RESERVE SHUTDOWN HO                           0.0        0.0        577.2
                                                ~TE933        53%7069    2EUE84778 83408741
: 7. GROSS ELECTRICAL ENERGY GENERATED (MWHj       514839    1960091
: 8. NET ELECTRICAL ENERGY GENERATED (MWH)         491394    1868438      78948024
: 9. UNIT SERVICE FACTOR                             100.0        95.5          65.0
: 0. UNIT AVAILABILITYFA                            100.0        95.5          65.3
: 1. CAPACITY FACTOR (USING MD                       102.6        97.4          63.3
,2. CAPACITY FACTOR (USING DER NET)                 98.6        93.6          59.9
.3. UN1T FORCED OUTAGE RATE                           0.0       4.5         10.8
.4. SHUTDOWNS SCHEDULED OVER NONE
: 5. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
DOCKET NO.
UNIT'ATE'OMPLETE BY:
TELEPHONE:
REPORT MONTH Unit 4 operated at essentially 100%   reactor power for the entire month.}}

Revision as of 08:29, 22 October 2019

Monthly Operating Rept for Apr 1995 for Turkey Point Units 3 & 4.W/950512 Ltr
ML17352B168
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/30/1995
From: Knorr J, Plunkett J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-145, NUDOCS 9505190385
Download: ML17352B168 (12)


Text

P RI C) RIP'Y (ACCELERATLD RIDS PROCESSIi~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,Z.E. Florida Power & Light Co. P PLUNKETT,J.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION .R

SUBJECT:

Monthl rept for Apr 1995 for Turkey Point Units 3 & 4. /950512 l DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 ~AXLE CENTRE 01 1 1 NRR/DIS P/PI PB 1 1 NRR/DOPS/OECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 U

ELDER N

YOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVKSTE! COYTACT'I'HE 'DOCL'WfEN'I'ONTROL DESK, ROOb,f PI -37 (EAT. 504- 083 ) TO DISTRI 8 UTIOY LIS'I'S I'OR DOC!.'ifEN'I'S YOI 'ON" I'l I NATE YOL'R NAifL P ROif I," D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

MAY 12 1995 L-95-145 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the April 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point

.'Plant i SQO>=

9505i F0385 moe30--

PDR ADOCK 05000250 R PDR an FPL Group co'mpany

I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Duration (Hours)

Reason Method of Reactor'icensee Shutting Event Reportt System Code Code'ause Component 4 Corrective Action to Prevent Recurrence Down 02 950407 40.0 95-004 CRDRVE Replace contzol rod drive mechanism power supply F Forced Reason

- Equipment Failure Method Exhibit G - Instructions Exhibit - Source 1 - Manual 1 Same S Scheduled A for Preparation of Data B Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Roport (LER) File D Regulatory zestriction 4 - Continued (NVREG-0161)

E Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)

-

F G - Administrative Operational Error (Explain)

H - Other (Explain)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 4/01/95 675 4/02/95 653 4/03/95 690 4/04/95 697 4/05/95 682 4/06/95 689 4/07/95 596 4/08/95 0 4/09/95 99 4/10/95 671 4/11/95 672 4/12/95 684 4/13/95 684 4/14/95 684 4/15/95 680 4/16/95 682 4/17/95 681 4/18/95 678 4/19/95 671 4/20/95 684 4/21/95 687 4/22/95 679 4/23/95 678 4/24/95 680 4/25/95 673 4/26/95 677 4/27/95 649 4/28/95 649 4/29/9S 680 4/30/95 678

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 5/ 8/95 CONTACT J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: APRIL 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
6. MAXZMUM DEPENDABLE CAPACITY (GROSS MHL~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE ll.

12.

HOURS IN REPORT PERIOD:

NUMBER OF HOURS REACTOR 719 683.7 2879 2843.7 196376.6 131822.1

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 679.0 2839.0 129887.7
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8 T4 74256 ETF6016 Y7U331950
17. GROSS ELECTRICAL ENERGY GENERATED (MWHj 478297 2024742 86786206
18. NET ELECTRICAL ENERGY GENERATED (MWH) 455084 1930785 82125212
19. UNIT SERVICE FACTOR 94.4 98.6 66.1
20. UNIT AVAILABILITYFA 94.4 98.6 66.2
21. CAPACITY FACTOR (USING MD 95.0 100.7 63.8
22. CAPACITY FACTOR (USING DER NET) 91.3 96.8 60.3
23. UNIT FORCED OUTAGE RATE 5.6 1.4 11.1
24. SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED SEPTEMBER 1995
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 operated at essentially 100% reactor power until April 7.

On April 7 the unit was manually shut down to replace a control rod drive power supply. The unit was manually tripped from the intermediate range when the power supply failed. The unit was returned to power on March 9, and remained at essentially 100%

power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 4/01/95 679 4/02/95 657 4/03/95 693 4/04/95 696 4/05/95 694 4/06/95 688 4/07/95 686 4/08/95 686 4/09/95 683 4/10/95 677 4/11/95 685 4/12/95 '85 4/13/95 684 4/14/95 683 4/15/95 682 4/16/95 683 4/17/95 681 4/18/95 679 4/19/95 679 4/20/95 679 4/21/95 680 4/22/95 679 4/23/95 677 4/24/95 683 4/25/95 672 4/26/95 678 4/27/95 695 4/28/95 682 4/29/95 683 4/30/95 685

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NQ.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Type Duration (Hours)

Reason Method of Shutting Licensee Event Roportf System Code code'ause Component & Corzectivo Action to Pzovont Recurrence Dawn Reactor N/A P Porced Reason Method Exhibit G - Xnstructions Exhibit 1 - same Source S Scheduled A - Equipmont Eailuro 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Pile D - Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training & 5 Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - othoz (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 5/ 8/95 CONTACT J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: APRIL 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
    • RW:
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. /
0. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

1. HOURS IN REPORT PERIOD: 719 2879 190108.0
2. NUMBER OF HOURS REACTOR 719.0 2757.1 127604.8
3. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
4. HOURS GENERATOR ON-LINE 719.0 2748.6 123512.2
5. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2

~TE933 53%7069 2EUE84778 83408741

7. GROSS ELECTRICAL ENERGY GENERATED (MWHj 514839 1960091
8. NET ELECTRICAL ENERGY GENERATED (MWH) 491394 1868438 78948024
9. UNIT SERVICE FACTOR 100.0 95.5 65.0
0. UNIT AVAILABILITYFA 100.0 95.5 65.3
1. CAPACITY FACTOR (USING MD 102.6 97.4 63.3

,2. CAPACITY FACTOR (USING DER NET) 98.6 93.6 59.9

.3. UN1T FORCED OUTAGE RATE 0.0 4.5 10.8

.4. SHUTDOWNS SCHEDULED OVER NONE

5. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT'ATE'OMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100% reactor power for the entire month.