Line 1: Line 1:
{{Adams
{{Adams
| number = ML20195D466
| number = ML20207B705
| issue date = 04/29/1986
| issue date = 07/21/1988
| title = Insp Rept 50-289/86-03 on 860303-27.Major Areas Inspected: Operational Readiness of Emergency Feedwater Sys.Seven Inspector Followup Items & 18 Potential Enforcement Findings Noted
| title = Advises That Enforcement Conference Will Be Scheduled Re Violations Noted in Insp Repts 50-289/86-03,50-289/86-06, 50-289/86-10 & 50-289/87-01.Generic Ltr 88-07 Re Equipment Qualification Requirements Will Also Be Discussed
| author name = Beall J, Callan L, Caphton D, Isom J, Johnson M, Martin T, Mckee P, Saunders A, Smith J, Sullivan D
| author name = Johnston W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name =  
| addressee name = Hukill H
| addressee affiliation =  
| addressee affiliation = GENERAL PUBLIC UTILITIES CORP.
| docket = 05000289
| docket = 05000289
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = 50-289-86-03, 50-289-86-3, IEIN-83-64, NUDOCS 8606040217
| document report number = EA-88-182, GL-88-07, GL-88-7, NUDOCS 8808040051
| package number = ML20195D446
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 2
| page count = 38
}}
}}


Line 19: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:_  _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
.
  .g
' '
il.
 
b
.
21 JUL 1988      -
  .
Docket No. 50-289
: EA 88-182
            ,
GPU Nuclear Corporation i: ATTN: Mr. H. D. Hukill Vice President and Director of THI-1 P. O. Box 480 Middletown, Pennsylvania 17057 Gentlemen:
Subject: Enforcement Conference During the period January 12, 1986 through April 15, 1987 the NRC performed several inspections of your Equipment Qualification Program. As a result of these inspections, rotential violations of 10 CFR 50.49 were identified. The subject inspection reports were sent to you on May 15, 1986 (50-289/86-03);
July 11, 1986 (50-289/86-06); September 5,1986(50-289/86-10) and May 11, 1987/87-01). In addition, violations of 10 CFR 50.49 were identified by you and reported to the NRC in Licensee Event Report LER-86-00 The most significant equipment qualification issues included for discussion are:
1) Qualification of emergency fan cooling cable not established to support use of cable in system. Cable replaced on April 22, 1986. (50-289/86-06; LER 86-009)
2) Qualification of BIW cable by similarity to qualified cable from Continental Wire and Cable Company not established prior to this inspec-tion. (50-289/86-06-07)
The NRC is considering all of these potential violations for appropriate enforcement action. We plan to conduct an enforcement conference with you to discuss the potential violations in the Region I Offices within 30 days of your receipt of this letter. At the enforcement conferences, you shculd be prepared to discuss (1) the safety significance of each violation, as well as the number of deficiencies and the number of systems and components affected in each case, (2) the specific and underlying cause(s) of each violation, and (3) the actions taken or planned to correct the indi"idual violations as well as to ensure yourself that the General Public Utiilty Company is currently in overall compliance with EQ requirement Furthermore, you should be prepared to discuss each violation in light of the Modified Enforcement Policy for EQ requirements which 13 described in the enclosure to Generic Letter 88-07, which items were identified by you and were promptly reported to the NRC? What were your best efforts to comply with the rule within the deadline; and if 0FFICIAL RECORD COPY THIl EC LTR - 0001. \g g8040051 880721  ~  07/14/88 o ADOCK 05000209 PNU l
 
r I- .-
g g-
.
,
c
.
, , .GPU Nuclear Corporation  2
      .
  . appropriate, why you believe that you clearly should not have known of- these
>
  -deficiencies ~ prior to the November 30, 1985 deadline for being in compliance with the rules. We request that at the enforcement conference you provide a
  '
handout that' succinctly describes your position concerning these enforcement considerations.
 
,   
 
Sincerely Or Cin 1"igned By ,
Wi am . cting Director L Division of Reactor Safety cc w/ encl:
T. G. Broughton, Operations and Maintenance Director, TMI-1 C. W. Smyth, Manager, TMI-1 Licensing R. J. McGoey, Manager, PWR Licensing E. L. Blake, Jr., Esquire TMI-Alert (TMIA)
Susquehanna Valley Alliance (SVA)
Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl) DRP Section Chief R. Hernan, PM, NRR K. Abraham, PA0 Robert J. Bores, DRSS U. Potapovs, NRR/DVIB D. Holody, RI
!
:
RI:DRS RI:D S RI:DRS Paolino/rw Anderson Durr 7/lq/88 7/F/88
  / r 7//8/88
,
0FFICIAL RECORD COPY TMll EC LTR - 0002.0.0 l    07/14/88
_
}}
}}

Latest revision as of 17:12, 27 December 2020

Advises That Enforcement Conference Will Be Scheduled Re Violations Noted in Insp Repts 50-289/86-03,50-289/86-06, 50-289/86-10 & 50-289/87-01.Generic Ltr 88-07 Re Equipment Qualification Requirements Will Also Be Discussed
ML20207B705
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/21/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
References
EA-88-182, GL-88-07, GL-88-7, NUDOCS 8808040051
Download: ML20207B705 (2)


Text

_ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _

.

.g

' '

il.

b

.

21 JUL 1988 -

.

Docket No. 50-289

EA 88-182

,

GPU Nuclear Corporation i: ATTN: Mr. H. D. Hukill Vice President and Director of THI-1 P. O. Box 480 Middletown, Pennsylvania 17057 Gentlemen:

Subject: Enforcement Conference During the period January 12, 1986 through April 15, 1987 the NRC performed several inspections of your Equipment Qualification Program. As a result of these inspections, rotential violations of 10 CFR 50.49 were identified. The subject inspection reports were sent to you on May 15, 1986 (50-289/86-03);

July 11, 1986 (50-289/86-06); September 5,1986(50-289/86-10) and May 11, 1987/87-01). In addition, violations of 10 CFR 50.49 were identified by you and reported to the NRC in Licensee Event Report LER-86-00 The most significant equipment qualification issues included for discussion are:

1) Qualification of emergency fan cooling cable not established to support use of cable in system. Cable replaced on April 22, 1986. (50-289/86-06; LER 86-009)

2) Qualification of BIW cable by similarity to qualified cable from Continental Wire and Cable Company not established prior to this inspec-tion. (50-289/86-06-07)

The NRC is considering all of these potential violations for appropriate enforcement action. We plan to conduct an enforcement conference with you to discuss the potential violations in the Region I Offices within 30 days of your receipt of this letter. At the enforcement conferences, you shculd be prepared to discuss (1) the safety significance of each violation, as well as the number of deficiencies and the number of systems and components affected in each case, (2) the specific and underlying cause(s) of each violation, and (3) the actions taken or planned to correct the indi"idual violations as well as to ensure yourself that the General Public Utiilty Company is currently in overall compliance with EQ requirement Furthermore, you should be prepared to discuss each violation in light of the Modified Enforcement Policy for EQ requirements which 13 described in the enclosure to Generic Letter 88-07, which items were identified by you and were promptly reported to the NRC? What were your best efforts to comply with the rule within the deadline; and if 0FFICIAL RECORD COPY THIl EC LTR - 0001. \g g8040051 880721 ~ 07/14/88 o ADOCK 05000209 PNU l

r I- .-

g g-

.

,

c

.

, , .GPU Nuclear Corporation 2

.

. appropriate, why you believe that you clearly should not have known of- these

>

-deficiencies ~ prior to the November 30, 1985 deadline for being in compliance with the rules. We request that at the enforcement conference you provide a

'

handout that' succinctly describes your position concerning these enforcement considerations.

,

Sincerely Or Cin 1"igned By ,

Wi am . cting Director L Division of Reactor Safety cc w/ encl:

T. G. Broughton, Operations and Maintenance Director, TMI-1 C. W. Smyth, Manager, TMI-1 Licensing R. J. McGoey, Manager, PWR Licensing E. L. Blake, Jr., Esquire TMI-Alert (TMIA)

Susquehanna Valley Alliance (SVA)

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl) DRP Section Chief R. Hernan, PM, NRR K. Abraham, PA0 Robert J. Bores, DRSS U. Potapovs, NRR/DVIB D. Holody, RI

!

RI:DRS RI:D S RI:DRS Paolino/rw Anderson Durr 7/lq/88 7/F/88

/ r 7//8/88

,