ML20210G947

From kanterella
Jump to navigation Jump to search
Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl
ML20210G947
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/15/1999
From: Patrick W
CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES
To: Linehan J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20210G951 List:
References
CON-FIN-D-1035, CON-FIN-J-5164, CON-FIN-J-5186, CON-FIN-J-5206, CON-FIN-J-5210, CON-FIN-J-5226, CON-NRC-02-97-009, REF-WM-11 HLWR, NUDOCS 9908030238
Download: ML20210G947 (1)


Text

z. .

ws-Center for Nuclear Waste Regulatory Analyses hfo)$ $ e$.F h522 5 C ntract NRC-02-97-009 Account No. 20-1402-158 U.S. Nuclear Regulatory Commission Attn: Mr. John J. Linehan, Director Office of Nuclear Material Safety and Safeguards Program Management, Policy Development and Analysis Staff Mail Stop 8-A23 Washington, DC 20555

Subject:

CNWRA Program Manager's Periodic Report on Activities of the Center for Nuclear Waste Regulatory Analyses for Period 10-FY1999

Dear Mr. Linehan:

The enclosed " Program Manager's Periodic Report"(PMPR) documents the progress and f mancial status of the Center for Nuclear Waste Regulatory Analyses for the period June 5-July 2,1999. Its contents comply with the requirements of section F.1.5 of the referenced contract. A diskette containing the PMPR in Wordperfect 8 format is also enclosed.

Cost variance analyses are provided for the Division of Waste Management (D1035), Tank Waste Remediation System (J5164), Three Mile Island Unit 2 Independent Spent Fuel Storage Installation (J5186), Dry Transfer System (J5206), Centralized Interim Storage Facility (D1035), Private Fuel Storage Facility (J5226), and Savannah River Site Aluminum-Based Spent Fuel (J5210) Job Codes, as well as for composite spending on this contract. All variances are expressed with regard to the current operations plans.

As indicated in table 2, a nuclear engineerjoined the staff this period.

During period 10, one new intermediate milestone was added and five schedule changes were made as reflected in table 3. Eight deliverables were transmitted is indicated in table 4.

p Please contact me or Mr. Henry Garcia if you have questions regarding this rfport.

Sinc e y your \,Jk o3O('05 /) ,

d(A A A esley C. Patri k President j/

HFG/lg Enclosures cc: B. Meehan J. Greeves S. Shankman C. Paperiello D. DeMarco J. Holonich E. Ten Eyck M. Federline CNWRA Directors / Element Managers h\

B. Stiltenpole (38) M. Weber A. Garza (SwRI Contracts)

E. Brach F. Miraglia g b.I 9900030238 990715 PDR WASTE WM-11 PDR Washington Office