Annual Assessment Letter for Three Mile Island Nuclear Generating Station, Unit 1, EOC-11 (Report 05000289-10-001)
ML110620216
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/04/2011
From: Ronald Bellamy
NRC/RGN-I/DRP/PB6
To: Pacilio M
Exelon Generation Co
BELLAMY, RR
References
IR-10-001
Download: ML110620216 (6)


Text

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR GENEMTTNG STATTON UNrr 1 (REPORT 05000289/2010001)

Dear Mr. Pacilio:

On February 11,2011, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Three Mile lsland Unit 1. The NRC reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actions from January 1, 2010 through December 31,2010. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Three Mile lsland Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile lsland Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:/iwrnnv.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5200 with any questions you have regarding this letter.

Sincerely, n

\\--"!Sil Ronald R. Bellamy, Ph.D., Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-289 License Nos: DPR-50 cc w/encl: Distribution via ListServ Three Mile lsland Inspection/Activity Plan f n accordance with 10 CFR 2390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qovireadins-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Ronald R. Bellamy, Ph.D., Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-289 License Nos: DPR-50 cc dencl: Distribution via ListServ Three Mile lsland Inspection/Activity Plan Distribution Wencl:

W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP R. Bellamy, DRP G. Barber, DRP C. Newport, DRP N. Lafferty, DRP J. Trapp, RIOEDO DRS Branch Chiefs (6)

N. McNamara, Rl, SLO D. Tifft, Rr, sLo D. Screnci, Rl, PAO N. Sheehan, Rl, PAO R. Barkley, Rl, ORA D. Kern, DRP, SRI J. Heinly, DRP, Rl C. LaRegina, DRP, OA RidsNrrPMThreeMilelsland Resource RO PreportsResources@n rc. gov RidsN rrDorlLpl 1 -2Resource RidsN rrDirslpab@nrc. gov DOCUMENT NAME: S:\\ROP-11 EOC Review\\Branch 6\\Three Mile lsland\\TMl ROP11 EOC cover ltr.docx SUNSI Review Complete: RRB (Reviewer's lnitials)

ML110620216 After declaring this document "An OtficialAgency Record" it will be released to the Public'

To rocoivo a coDv of thiE box: "C" wilhout OFFICE mmt RI/DRP RI/DRP RI/DRP NAME DKern/DK SBarber/ SB RBellamv/RRB DATE 02124111 02t24t11 02t28111 OFFICIAL RECORD COPY attachmnugnclosure "N" = No coPy

Page 1 of3 0210912011 08:32:15 Report 22 Three Mile lsland Inspection / ActivitY Plan o1t0112011 - 0613012012 CDBI o1t1412011 lP 7',11'1121 o'v1012011 o'u241201'l 0210712011 03t1412011 08/01/201 1 0812912011 04t11t2011 04t1'1120'11 04t1112011 0411112011 o4t't112011 05109120'11 05/09/201 1 05t231201'l 05t2312011 0512312011 06t2012011 0612012011 0612012011 06120t2011 06t201201'l 06t20t2011 0612012011 o6l20nu1 08/08/201 1 08/08/201 1 01t281201'l o2t1112011 4v18t2011 08/05/201 1 09/09/201 1 0/.l1512011 04i15n011 o4t15t2011 0411512011 0411512011 05113120'11 o511312011 05t27t2011 05127t2011 0512712011 0612412011 06t24t2011 06t24t2011 06124120'11 0612412011 0612412011 06t24t2011 o6t24t2011 08t121201',l 08t1212011 Component Design Bases Inspec{ion TRI FIRE. TRIENNIAL FIRE PROTECTION INSPECTION 7111118. TMI REQUAL INSP w/ P/F RESULTS tP 71't11118 Licensed Operator Requalification Program O9/12EXM. OPERATOR LICENSING INITIAL EXAMS u01829 FY11-THREE MILE ISIAND, INITIAL OL EXAM U01829 FY11-THREE MILE ISLAND, INITIAL OL EXAM EP EX

. EP EXERCISE EVALUATION tP 71111057 tP 71111057 tP 7111401 tP 7111404 tP 7t151-EP01 tP 7'I151-EPO2 tP 71151-EP03 HP-71124 - RAD WASTE & Tl251s/179 tP 2515t179 tP 71124.08 HP.71124.INSTRUMENTS/REMP tP 71',t24.05 tP 71124.06 tP 71124.07 tP 7',1124.0'l tP 71124.02 tP 71't24.03 tP 71124.03 tP 7'1124.04 tP 71124.45 tP 71151-OR01 tP 71151-PR01 tP 7',t124.01 tP 7't124.02 Fire Protection ffriennial]

Fire Protection fl-rienniall Exercise Evaluation Emergency Action Level and Emergency Plan Changes DrilUExercise Performance ERO Drill Participation Alert & Notification System I

'l I

I I

1

1

1 I

I

1

I

1

1 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation HP.7 1124. ACCESS/ALARA/AIR/DOSE/INSTRUMENTS/PI Radiation Monitoring Instrumentation Radioactive Gaseous and Liquid Effluent Treatment Radiological Environmental Monitoring Program Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitigation In-Plant Airborne Radioactivi$ Control and Mitigation Occupational Dose Assessment Radiation Monitoring Instrumentation Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effl uent Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls HP.7 1 124. ACCESS'ALARA/AIR/DOSE'INSTRUMENTS No. of Staff on Site Unit Number

. URI-CLOSEOUT. FLOOD INSPECTION This report shows only on-site and announced inspection procedures.

Page 2 of 3 OAOU2O11 08:32:15 Report 22 Three Mile lsland Inspection / Activity Plan 01to1t2011 - o6t30t2012 No. of Staff on Site

I

1

'l

'l 1t 08/08/201 1 08/08/201 1 08/08/201 1 10t31t2011 10t31t201',!

10t31t20't1 10t31t2011

't0t31t2011 10t31t20't1

't2t05t2011 12t05t20't1 1U05t20't1 12t05t2011 12t05t2011 12t05t2011 o3119t2012 04t16t2012 02t27t2012 03t12t2012 03t26t2012 03t't2t20't2 03t12t2012 03l'12t2012 o3t12t2012 o5lo7t20't2 05107t2012 05l07t20't2 08t12t20't1 08t1212011 08t12t2011

't'U0u201'l rrc4no11 1110412011

't1to4t2011 11t04t2011 1',v't1t20't'l 12t09t2011 1U09t2011 1210912011 12t09t2011 14O9t2011 12t09t2011 03t23t20't2 0/.t20t2012 o3tou20't2 0311612012

$BAt2A12 03t16t2012 0311612012 03116120'12 03t16t2012 o5t11t2012 o1t1'v20't2 o5t1'1t2012 tP 71124.03 tP 71124.04 tP 7't't24.05 HP -7 1 124. ACCESS/ALARA/AIR/DOSE/INSTRUMENTS lP 71124.01 tP 71124.02 tP 71124.03 tP 7',t124.05 tP 7115't-OR01 tP 71151-PR01

/U{6EXAM. TMI INITIAL EXAM u01 847 u01847 tP 71124.01 lP 7',!124.02 tP 71't24.03 In-Plant Airborne Radioactivity Control and Mitigation Occupational Dose Assessment Radiation Monitoring Inshumentation Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitigation Occupational Dose Assessment Radiation Monitoring Instrumentation Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitigation Radiation Monitoring Instrumentation Occupational Exposure Control Effectiveness RETS/ODCM Radiological Efiluent tP 7't124.0',1 tP 71124.02 tP 71124.03 tP 71124.04 lP 71124.05 7111108P.INSERVICE INSPECTION tP 7111108P Inservice lnspection Activities - P\\A/R HP.71124. ACCESS/ALARA/AIRYINSTRUMENTS/PI 7111121 - CDBI lP 7111121 Component Design Bases Inspection lP 7111'121 Component Design Bases Inspection lP 7111121 Component Design Bases Inspection EP PROGR. EP PROGRAM INSPECTION lP 7111402 Alert and Notification System Testing lP 7'111403 Emergency Preparedness Organization Staffing and Augmentation System lP 7111404 Emergency Action Level and Emergency Plan Changes lP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies INSP

. OCC RAD/ALARA/AIRBORNE/DOSE ASSESS FY12.TMI INITIAL OPEMTOR LICENSING EXAM FYl2.TMI INIT'\\L OPEMTOR LICENSING EXAM Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls ln-Plant Airborne Radioactivity Control and Mitigation this report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 OAOgl2O11 08:32:15 Report 22 Three Mile lsland lnspection / ActivitY Plan 01t01t201'l - 0613012012 05to712012 0511112012 05t07t2012 051'1112012 0512112012 05t2112012 tNsP

- occ tP 71124.04 711528 - Pl&R tP 711528 tP 711528 Occupational Dose Assessment ldentification and Resolution of Problems ldentification and Resolution of Problems Ihis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.