ML20211K239
| ML20211K239 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek, Crane |
| Issue date: | 08/23/1999 |
| From: | Joshua Wilson GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 1920-99-20307, 1940-99-10442, 1950-99-20441, NUDOCS 9909070146 | |
| Download: ML20211K239 (11) | |
Text
_
4 l
GPU Nucleer,Inc.
(
One Upper Pond Road NUCLEAR Parsippany, NJ 07054-1095 Tal 973-316-7000 August 23 1999 1920-99-20307 1940-99-10442 1950-99-20441 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station Unit 1 (TMI-1)
DPR-50/ Docket 50-289 Three Mile Island Nuclear Station Unit 2 (TMI-2)
DPR-73/ Docket 50-320 Oyster Creek Nuclear Generating Station (OC)
DPR-16/ Docket,50-219 Fitness For Duty (FFD) Semi-Annual Report January - June 1999 Pursuant to 10 CFR 26.71(d), GPU Nuclear, Inc. (GPUN) hereby submits the FFD Performance Data Reports for TMI, Oyster Creek, and the corporate headquarters located in Parsippany, New Jersey. As required, each separate report provides the following information:
i.
Drugs tested for, and cut-ofTlevels, ii.
Number tested (by Category and Total), and results by population and type of test; iii.
Substance (s) identified; l
iv.
Random testing rate; v.
Summary ofManagement Action (s);
vi.
Workforce population tested (average number with unescorted access); and, vii. List ofevents reported.
Sincerely, S$
l John F. Wilson j
ggD3D Vice President and Director Human & Administrative Services
\\.
4)
/JDL Attachment pU l
9909070146 990823 PDR ADOCK 05000219 R
PDR t
Fitness for Duty (FFD) Semi-Annual Report January-June,1999 Page 2 T. Colburn - TMI-l Project Minager cc:
H. Pastis - Oyster Creek Project Manager
' H. Miller - Administrator Region I-W. Ruland - Region I/DRS W. Schmidt - TMI Senior Resident Inspector
- J. Schoppy - Oyster Creek Resident Inspector C. Smith -TMI Resident Inspector
. J. Stoltz - NRR/DRPM L. Thonus - TMI-2 Project Manager
FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 GPU Nuclear. Inc.
June 30,1999 Company 6 Months Ending Three Mile Island Nuclear Generating Ste+ ion Operating License and Docket Units 1 & 2, Middletown PA DPR-50/ Docket 50-289 (TMI-1)
Location Possession Only License and Docket DPR-73/ Docket 50-320 (TMI-2)
J. Troebliaer (717) 948 - 8188 Contact Name Phone (include Area Code)
CUTOFFS: SCREEN / CONFIRMATION (ng/ml) @ APPENDIX A TO 10CFR26
/
AMPHETAMINES
/
/
I MARlJUANA COCAINE
/
PHENCYCLIDINE
/
/
OPIATES
/
ALCOHOL (% BAC)
/
/
LONG-TERM SHORT-TERM j
CONTRACTOR CONTRACTOR TESTING RESULTS LICENSEE EMPLOYEES PERSONNEL PERSONNEL AVERAGE NUMBER WITH 815 N/A 169*
UNESCORTED ACCESS CATEGORIES 8
8 8
TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE PRE-ACCESS 12 0
0 0
19 0
FOR POST ACCIDENT 0
0 0
0 0
0 CAUSE OBSERVED BEHAVIOR 0
0 0
0 0
0 RANDOM 229 0
0 0
62 0
FOLLOW-UP 3
0 0
0 0
0 OTHER 0
0 0
0 0
0 TOTAL 244 0
0 0
81 0
NOTE:
- Three Mile Island and Oyster Creek Contractors are combined in one (1) pool.
l 0
LA T S S E
0 0
0 0
U T FEO RT L
O H
0 0
0 0
OC LA
-Y E C N S
NI 0
0 0
0 E
E D I
C HL PC NATS SE B
E N 0
0 0
0 U
HI 6
PM 2
S MA R
C AT I
F F
C C
S I
0 E
ET 0
0 0
0 1
P IA O
S P
T R
O T
O C
F E
S E
J 9 T
I 0
0 0
0 N
B9 S
A U9 E
C O
S1 T
C L E E
EN V
NU I
NJ T
AN I
O-S A
S9 O
U 0
0 0
0 J
R9 P
I R
E 92 1
D A
M P
E E
Y G R R M
OA A R
P S
F U F
S R
I AN N)
R O
T T
C AJ C N S
C A
D:N A
E A
R D A F L E
R T
E L
OS Y
T N
O S O
N O
CI I
L O
C NRI N E P
E C
AE WL M
M L
M R
M RTM D
E R
E ORE K E E
E T
S T
-T L
E N
G R
A FOE A
RPR E R E
N O
T EEH R H C
O H
O I
T L
L S
T PRT B(
[:l; l'-
PERFORMANCE DATA FOR PERSONNEL SUBJECT TO 10 CFR 26 REPORT PERIOD: JANUARY 1999 - JUNE 1999
. THREE MILE ISLAND - ATTACHMENT - Page 1 l
TESTING RATE 1.
The annualized random testing rate for TMI Licensee Employees is 28.10E 2.
The a^nualized random testing rate for Oyster Creek and Three Mile Island Contractor Persornelis 74.56%
NOTE:
The Contractor random pools for Oyster Creek and Three Mile Island are combined into one pool.
SUMMARY
OF MANAGEMENT ACTIONS 1.
No positive test results were received during this reporting period for this location (TMI).
LIST OF EVENTS REPORTED 1.
There were no reportable events during this period.
I i
i I
i
FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 GPU Nuclear, Inc.
June 30,1999 Company 6 Months Ending Oyster Creek Nuclear Generating Station Operating License and Docket Forked River, NJ DPR-16/ Docket 50-219 (OC)
Location J. Troebliaer (717) 948 - 8188 Contact Name Phone (include Area Code)
CUTOFFS: SCREEN / CONFIRMATION (ng/ml) @ APPENDIX A TO 10CFR26
/
AMPHETAMINES
/
/
MARlJUANA COCAINE
/
PHENCYCLIDINE
/
/
OPIATES
/
ALCOHOL (% BAC)
/
/
LONG-TERM SHORT-TERM CONTRACTOR CONTRACTOR TESTING RESULTS LICENSEE EMPLOYEES PERSONNEL PERSONNEL AVERAGE NUMBER WITH 793 UNESCORTED ACCESS N/A 169' CATEGORIES 8
TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE PRE-ACCESS 13 0
0 0
14 0
FOR POST ACCIDENT 0
0 0
0 0
0 CAUSE OBSERVED BEHAVIOR 0
0 0
0 0
0 RANDOM 261 0
0 0
64 0
FOLLOW-UP O
O O
O O
O j
OTHER 0
0 0
0 0
0 TOTAL 274 0
0 0
78 0
NOTE:
- Three Mile Island and Oyster Creek Contractors are combined in one (1) pool.
- lllll, l1 l
0 LA T S S U E 0
0 0
O H
0 0
0 0
OC LA
-Y E C N S
NI 0
0 0
0 E
E D l
C HL PC NATS SE B
E U
H N 0
0 0
0 I
PM S
MA 62 C
AT I
R F
F IC S
C E
ET 0
P A
0 0
0 0
1 S
P I
O R
O T
O T
F C
S E
E T
IN J
S A
0 0
0 0
B 9 9
E C
U9 T
O S1 C
E LE V
EN I
NU T
AN I
NJ S
AU 0
0 0
0 O-O J
S9 P
RI R9 D
A M
E9 E
P1 M
R YR R
S O A2 F
S R
I F UE N
R O
ANG O
O T
T C
T AA C
S C
A AJP F)
E R
T E
A R
K D:
E D OE Y
T N
O N
O K
NE C O E L
O C
P NRE WR M
C I
C M
AER O
E M
R MPC D R E
R E
RTR K E E
E T-S T-T L
ORE A T N
G R
A S
E N
O T
FOT E Y I
O H
O C
RPS R O L
L S
T EEY B(
PRO f
l
PERFORMANCE DATA FOR PERSONNEL SUBJECT TO 10 CFR 26 REPORT PERIOD: JANUARY 1999 - JUNE 1999
' OYSTER CREEK - ATTACHMENT-Page 1 i
.4 TESTING RATE i
1.
The annualized random testing rate for Oyster Creek Licensee Employees is 33.0%.
2.
The annualized random testing rate for Oyster Creek and Three Mile Island Contractor Personnelis 74.56%.
NOTE:
The Contractor random pools for Oyster Creek and Three Mile Island are combined into one pool.
SUMMARY
OF MANAGEMENT ACTIONS 1.
No positive test results were received during this reporting period for this location (OC).
I LIST OF EVENTS REPORTED 1
1.
There were no reportable events during this penod.
1
FITNESS FOR DUTY PROGRAM
~
PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 GPU Nuclear. Inc.
June 30,1999 Company 6 Months Ending Operating License and Docket Parsiocanv. NJ (Headauarters)
DPR-50/ Docket 50-289 (TMI-1)
Location DPR-16/ Docket 50-219 (OC)
Possession Only License and Docket DPR-73/ Docket 50-320 (TMI-2)
J. Troebliaer (717) 948 - 8188 Contact Name Phone (include Area Code)
CUTOFFS: SCREEN / CONFIRMATION (ng/ml) @ APPENDIX A TO 10CFR26
/
AMPHETAMINES
/
/
MARIJUANA COCAINE
/
PHENCYCLIDINE
/
/
OPIATES
/
ALCOHOL (% BAC)
/
/
LONG-TERM SHORT-TERM CONTRACTOR CONTRACTOR TESTING RESULTS LICENSEE EMPLOYEES PERSONNEL PERSONNEL AVERAGE NUMBER WITH 95 N/A N/A UNESCORTED ACCESS TESTED POS TlVE TESTED POS TiVE TESTED POS TiVE PP,6-ACCESS 1
0 0
0 0
0 FOR POST ACCIDENT 0
0 0
0 0
0 CAUSE OBSERVED BEHAVIOR 0
0 0
0 0
0 RANDOM 37 0
0 0
0 0
FOLLOW-UP O
O O
O O
O OTHER 0
0 0
0 0
0 TOTAL 38 0
0 0
0 0
~
l 0
LA T S S U E 0
0 0
0 T
FEO RT L
OH 0
0 0
0 OC LA Y E C N S
NI 0
0 0
0 D
E E I C
HL PC NATS SE B
E N 6
U HI 0
0 0
0 2
PM S
MA R
F C
AT I
C F
I 0
C S
1 E
ET 0
0 0
0 O
P A
T S
P I
T R
O C
O E
F J 9 S)
E B9 2 T S N
U9E S R A
I 0
0 0
0 S1G E E C
LEA T T O
R C
ENP E A NU -
V U NJ)
I A
OS TQ N
I R
SD A
S9 E
OA U
0 0
0 0
R9 J
9T PE I
E R
1 R P
D H A
YA EE M
R RU O AQ MT F UD R A R
S I
ANA F
S R
O R
O TAE N P O
T AJH O R T
C D:
C O E
A R
(
S C
A DJ E ON FC E
R T
O-Y T
N CI O
N O
NRY NY L
O C
AEN P
M PA WN M
M C
RTP O A E
M R
P E
R E
ORP D P E
E T
I FOS KI S
T-T L
RPR A S N
G R
A EEA E R E
N O
T PRP R A I
L S
T C
O H
O P
L B(
PERFORMANCE DATA FOR PERSONNEL SUBJECT TO 10 CFR 26 REP &T PERIOD: JANUARY 1999 - JUNE 1999 PARSIPPANY, NJ (HEADQUARTERS) - ATTACHMENT - Page 1 TESTING RATE 1.
The annualized random testing rate for Parsippany Licensee Employees is 38.95%.
SUMMARY
OF MANAGEMENT ACTIONS 1.
No positive test results were received during this reporting period for this lotation (Parsippany Headquarters).
LIST OF EVENTS REPORTED 1.
There were no reportable events during this period.
i l
__