ML20246B049

From kanterella
Jump to navigation Jump to search
Forwards Final SALP Rept 50-289/87-99 for 871101-890115
ML20246B049
Person / Time
Site: Crane 
Issue date: 06/28/1989
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20246B052 List:
References
NUDOCS 8907070183
Download: ML20246B049 (2)


See also: IR 05000289/1987099

Text

n

&

K

3,

.Ja;

.

H y4yg;'

"

4

s a .,

l7

C

h

,

!:

.

JUN 2 81999

i

i

)

Docket No. 50-289-

L

GPU Nuclear Corporation

'

'

-ATTN: Mr. H. Dc Hukill

-

Vice President and Director of TMI-1

1

u

.P 0.. Box 460

i

l

Middletown, Pennsylvania

17057

i^

~ Gentlemen:

L

Subject: . Systematic Assessment of Licensee Performance (SALP) Final Report.

Number 50-289/87-99

l

This ~ 1etter: forwards the ~ final .TMI-1 SALP Report-(Enclosure 1) for. the period

'

'

.

from Noveraber 1,'1987 t'o January 15,1989 : Our overall assessment.is that you

I

E

-and your staff continue;to operate TMI Unit 1 in_a competent.and safe manner.

l

1

Effective. management attention and involvement oriented toward nuclear safety-

I

-

in'all functional areas was noted. As' identified _in the report and discussed

l

with you at the ,SALP meeting, a decline in performance was' noted in the area-of

'

'

Maintenance / Surveillance.

From.your presentations at the meeting, it appears.

.

that you- areL applying appropriate management attention to improve- this area.

l

We reviewed your May~10,.1989 SALP comments (Enclosure 2). Based on a review

l

of your comments, several changes were made to better characterize our evalu-

'

ation of your chemistry program, your safety review process, and to more ac-

- curately summarize your safety. assessment / quality verification activities.

,

'

These' changes have been summarized in an errata sheet that is included as En-

closure 5.

L

-

R

_ This SALP evnluatien was c'iscussed with you in an April 10, 1939 meeting at the

<

j

lTMI-1 site (meeting attendees are listed in Enclosure 3). The initial SALP

4

L

F.eport was_ forwarded ti, you by my April 3,1989 letter (Enclosure 4).

j

No reply to this letter is required. Your cooperation with us in the SALP pre -

k

cets is appreciated.

,

1

i

or

-i

Sincerely,

.j

i.

Orldnn.I Efgned By

E M Mi Y. EUSSELL

1

William T. Russell

Regional Administrator

!

Enclosures: As stated

i

l

.89070701B3 890628

E

PDR

ADOCK 05000289 p

G

PNU

J

OFFICIAL RECORD COPY

DL50-289/87-99 FINAL - 0001.0-0

11/29/80

ik

68

9

,

a

-

_

-

A

-

- -___--.

D. M

.. ,

GPU Nuclear Corporation

2

M 28 g

cc w/encls:

T. G. Broughton, Operations and Maintenance Director, TMI-1

C. W. Smyth, Manager,1MI-1 Licensing

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr., Esquire

TMI-A3ert (TMIA)

Susquehanna Valley Alliance (SVA)

Chairman Zech

Commissioner Roberts

Commissioner Carr

Commissioner Rogers

Commissioner Curtiss

K. Abraham, PAD, RI (22 copies)

i

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encls:

Region I Docket. Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Taylor, DEDNRR, RO&RES

K

,bR

W. Johnston, DRS

W. Kane, DRP

{

5. Collins, DRP

!

l

R Brady, RI

C. Ccwgill, DRP

E. Wenzinger, DRP

{

1

J. Lieberman., OE

i

'W. Oliveira, CRS

D. lloledy, ES

G. Kelly, DRP

E, Ccnner, DRP

l

R. Ferrian, PM, NRR

{

K. Abraham, PAD

!

Robert J. Bores, DRSS

7, ALP Management Meeting Attendees

l

)

il

i

SCeYSf),egM&

//]W

RI DRP

RI:

Pf

RIC4h

RI:DRSS

RI:

R

RA

RI:RA

'

L/

l

JV

C

gill /jm

E

enzi

er

R Yg

Knapp

oger

Ma

in

Russell

l

i

6/12/89

(, lh

in

I

4/ p

6/rf/P7

6/

/89

O

CIAL RECORD COPY

DL50-289/87-99 FINAL - 0002.

0

l

11/29/80

!

L

l

- - - - - - _ - - _ _ _ _ _ . - - - - _ _

.1