MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License ML20196J7651999-06-29029 June 1999 Provides Updated Info Re Loss of Feedwater & Loss of Electric Power Accident Analyses to Support TS Change Request 279 Re Core Protection Safety Limit,As Discussed at 990616 Meeting ML20196J7701999-06-29029 June 1999 Forwards LAR 285 for License DPR-50,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20209C0391999-06-29029 June 1999 Forwards LAR 77 to License DPR-73,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-2 License to Amergen,Radioactive Matl May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20196G2061999-06-23023 June 1999 Requests That NRC Update Current Service Lists to Reflect Listed Personnel Changes That Occurred at TMI 05000289/LER-1999-006, Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements1999-06-23023 June 1999 Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements ML20196D2171999-06-17017 June 1999 Forwards Pmpr 99-9, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990508- 0604.New Summary Personnel Table Was Added to Rept Period.Matl Scientist Joined Staff Period ML20196A0431999-06-15015 June 1999 Providess Notification That Design Verification Activities Related to Calculations Supporting Analytical Values Identified in Gpu Nuclear Ltr to NRC Has Been Completed 05000289/LER-1999-004, Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT1999-06-0909 June 1999 Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT ML20212K2541999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20212K2671999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20195E2751999-06-0404 June 1999 Informs That PCTs & LOCA Lhr Limits Submitted in Util Ltr for LOCA Reanalysis Performed in Support of TMI-1 20% Tube Plugging Amend Request Have Been Revised.Revised PCT & LOCA Lhr Limit Values Are Provided on Encl Table 1 ML20195E3281999-06-0404 June 1999 Forwards Application for Amend to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20195C5721999-06-0202 June 1999 Forwards Description of Gpu Nuclear Plans for Corrective Actions for 1 H Fire Barriers in Fire Zones AB-FZ-3,AB-FZ-5, AB-FZ-7,FH-FZ-2 & Previous Commitments for Fire Zones CB-FA-1 & FH-FZ-6 ML20207E2561999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Change in ECCS Analyses at TMI-1 ML20195B2461999-05-21021 May 1999 Forwards Itemized Response to NRC 990506 RAI for TS Change Request 279 Re Core Protection Safety Limit ML20206R6461999-05-13013 May 1999 Forwards Rev 39 of Modified Amended Physical Security Plan for TMI 05000289/LER-1999-003, Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC1999-05-0707 May 1999 Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC ML20206K6301999-05-0707 May 1999 Provides Addl Info Re TMI-1 LOFW Accident re-analysis Assumptions for 20% Average SG Tube Plugging as Discussed on 990421 ML20206H0781999-04-30030 April 1999 Forwards Rev 0 to 1092, TMI Emergency Plan. Summary of Changes Encl ML20206J4811999-04-30030 April 1999 Provides Summary of Activities at TMI-2 During First Quarter of 1999.TMI-2 RB Was Not Inspected During Quarter.Routine Radiological Surveys of Auxiliary & Fuel Handling Bldgs Did Not Identify Any Significant Adverse Trends ML20206E4121999-04-27027 April 1999 Requests That TS Change Request 257 Be Withdrawn ML20206C5211999-04-23023 April 1999 Requests Mod to Encl Indemnity Agreement Number B-64,on Behalf of Gpu & Affiliates,Meed,Jcpl,Penelec & Amergen Energy Co,Llc.Ltr Supersedes & Withdraws 990405 Request Submitted to NRC ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 1999-09-09
[Table view] |
Text
-
1 I
,e
{ GPU Nuclear,Inc.
( Route 441 south NUCLEAR hy$",$7.,
Tel 717 944 7621 August 12,1999 1920-99-20449 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Ladies and Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit-1 (TMI-1)
Operating License No. DPR-50 Docket .No. 50-289 Pressurizer Supports TMI-l Licensee Event Report (LER) No. 99-006-00, dated June 23,1999, long-term corrective actions include submittal of a license change request to revise the design basis for the TMI-l pressurizer supports as described in the TMI-l Updated Final Safety Analysis Report (UFSAR) to allow use of Regulatory Guide (R.G.) 1.61 damping values together with the existing design basis amplified response spectra.
The detailed analyses supporting this license change request are ongoing and are expected to be submitted for NRC review and approval by September 10,1999. The purpose of this letter is to request NRC concurrence with the ongoing analytical approach, as described in detail herein (Attachment), which is being utilized by GPU Nuclear to support the detailed license change request. This design basis change is being applied only to the analysis of the TMI-I pressurizer supports and it is not GPU Nuclear's intent to extend use of this methodology to other plant components at this time.
The proposed change to the TMI-l pressurizer support design basis requires NRC approval because the use of the higher damping values specified by R.G.1.61 utilizes a methodology that has not previously been reviewed by the NRC for use at TMI-1. As described in LER 99-006-00 referenced above, the existing pressurizer support lug bolts remain operable and capable of performing their design function during a design earthquake event. Thus, GPU Nuclear does not consider resolution of this LER I corrective action to be required for the upcoming outage. This initial NRC concurrence is being [
requested in order to facilitate GPU Nuclear's decision to pursue the analytical design basis change to the pressurizer support which is technicallyjustifiable and maintains adequate design margin, and to obtain concurrence that review of the associated license change request does not need to be resolved for the upcoming outage based on the present operable condition of the supports.
9908240034 990812 '! d hc0 PDR ADOCK 05000289
- P PDR I
l I
E t 1920-99-20449-Page.2 of 2
! GPU Nuclear believes that this change to the seismic design basis for the TMI-l pressurizer supports maintains adequate design margin when compared to current NRC approved seismic design basis criteria, and potential modification of the supports to estore the original design basis is unnecessary and provides ,
no added safety benefit. Modification of the pressurizer support bolts involves significant radiological and financial considerations. Implementation will result in approximately 6-10 man-rem radiation exposure.
l Design and installation cost for the pressurizer support modification will exceed $200K. The modification requires the plant to be shutdown and would most efliciently be implemented during a planned outage.
, GPU Nuclear is available to meet with NRC staff as necessary to support this request. We expect to i have the detailed results of the specific application of this methodology to the pressurizer supports
! available to discuss with NRC staff at a meeting the week of September 6,1999. If any additional information is needed, please contact Mr David J. Distel, Nuclear Licensing and Regulatorf Affairs at (973) 316-7955.
Sincerely,
{
A4 ames W. Langen c Vice President and Director, TMI Attachment cc: Administrator, Region I TMI-l Senior Project Manager TMI-l Senior Resident Inspector File No. 99097 l l 1
i i
l l
t
Attachment 1920-99-20449 Page1of3 ATTACHMENT
- The TMI-l UFSAR speciIles damping values to be used in the design of structures, systems and components in nuclear safety related applications. These damping values are generally lower and thus more conservative than the damping values specified in current regulatory guides and the Standard Review Plan. GPU Nuclear plans to change the TMI-l UFS AR to permit use of the damping values )i specified in the current revision of Regulatory Guide (R.G.) 1.61 for analysis of the TMI-l pressurizer supports. These damping values are based on current knowledge with respect to behavior of structures, systems and components subjected to vibratory motion and have been approved by the USNRC for use at miclear power plants. I GPU Nuclear has determined based on preliminary results that it is acceptable to use R.G.1.61 damping values for the pressurizer support analysis because the loads on the pressurizer supports calculated using R.G.1.61 damping values combined with the existing TMI-l design basis response spectra remain greater than the pressurizer support loads calculated using R.G.1.61 damping values and response spectra generated using criteria currently accepted by the NRC. Therefore, although.this proposed change l reduces some of the margin available in the existing TMI-l design basis criteria for the pressurizer supports, the proposed analysis methodology and criteria described below remains conservative when compared to current NRC approved seismic analysis methods and criteria.
Dr. Robert P. Kennedy of Structural Mechanics Consulting, Inc. was contracted to assist in developing the technicaljustification for using the Regulatory Guide damping values in conjunction with the TMI-l design basis amplified response spectra. Specifically, the damping values to be used in the analysis as specified by R.G.1.61 and as recommended by Dr. Kennedy are as follows:
l Reinforced Concrete: 4% for the OBE case and 7% for the SSE case L )
Pressurizer Support Steel: - 4% for the OBE case and 7% for the SSE case
- (Including Lugs and Lug Bolts) l l Pressurizer: 2% for the OBE case and 4% for the SSE case i The pressurizer supports have been analyzed using the existing TMI-l design basis amplified floor response spectra at the damping values listed above. The preliminary results of this analysis demonstrate that the pressurizer supports are fully compliant with requirements of the TMI-l UFSAR except for the
- use of higher damping values. However, the existing TMI-l design basis amplified floor response spectra were not generated in accordance with the current requirements of the Standard Review Plan and pertinent regulatory guides. Based on input from Dr. Kennedy, the following steps are being followed to 4
provide a technical basis for using the higher damping values:
Attachment I , 1920-99-20449 f Page 2 of3 l
i'
- l. Using the Uniform Hazard Spectra developed by Lawrence Livermore National Labs and presented in LLNL93 and NUREG 1488 as input, develop amplified in-structure response spectra that fully comply with the requirements of the latest revision of the Standard Review Plan using the best estimate soil properties. Based on recommendations of Dr. Kennedy, the 4
LLNL93 median lx10 Uniform Hazard Response Spectrum (UHS), specified as a rock outcrop motion at elevation 277 ft is being used as input to this analysis.
- 2. Using the existing TMI-l SSE design basis ground response spectra as input, develop a
- second set of amplified in-structure response spectra that fully comply with the requirements of the latest revision of the Standard Review Plan using the best estimate soil properties.
- 3. Plot the two sets of spectra generated in Steps 1 and 2 at 4% and 7% damping. If the existing design basis amplified response spectra plotted at 4% and 7% damping envelop the spectra generated in Steps 1 and 2 at all frequencies, then use of the design basis spectra at the higher
'l damping values is justified. That is, the design basis response spectra would be more conservative than spectra calculated in accordance with current criteria.
-4. If the two sets of spectra generated in Steps 1 and 2 are not enveloped l'y the existing design basis amplified response spectra at 4% and 7% damping at every frequency, an analysis of the pressurizer supports will be conducted using the spectra generated in steps 1 and 2 as input. I Prior to this analysis however, two additional sets of amplified n..y .nse spectra are generated using the UHS as input, but with the lower bound and upper bound soil properties respectively. These three sets of response spectra are then broadened and enveloped in accordance with the requirements of the latest revision of the Standard Review Plan.
- 5. The pressurizer supports are then analyzed using an envelope of the spectra generated in step 4 and the spectra generated in Step 2. The spectra generated in Step 2 is broadened but is generated only for the best estimate soil case. This is due to the fact that the spectra generated from the UHS greatly exceed the spectra generated from the design basis ground response spectra at all frequencies ofinterest.
1
- 6. If the forces generated from the analysis of the pressurizer described in Step 5 are less than the forces obtained from the analysis using the 4% and 7% damped existing design basis amplified response spectra, then use of the design basis response spectra at the higher damping values is justified. That is, the use of the design basis response spectra at damping values specified in Regulatory Guide 1.61 produce loads that are more conservative than the loads that result
- from an analysis performed in full compliance with the current Standard Review Plan.
f: l
, , . Attachment
. 1920-99-20449 Page 3 of 3
.. s To ensure that the amplified response spectra are generated in accordance with the latest requirements of the Standard Review Plan, GPU Nuclear has contracted with Dr. Kennedy to direct and oversee all aspects of this effort. EQE International, Inc. has been contracted to generate the amplified response spectra using latest analytical methodologies and using the uniform hazard spectra as input. EQE has also been contracted to perform all spectra comparisons and to develop enveloping spectra for use in I analyzing the pressurizer supports. The response spectra developed from the design basis ground i response were generated previously by EQE for use in resolution of USl A-46. These spectra were developed in accordance with the Standard Review Plan and have been determined by the NRC to be classified as " conservative design in-structure response spectra" (Reference NRC letter to GPU Nuclear j C311-94-3247, dated September 26,1994) per the definition provided in the SQUG Generic 1 Implementation Procedure.
In the first phase of the current work, EQE International has generated the 4% damped amplified l
response spectra at the location of the pressurizer supports using the uniform hazard spectra and the best I estimate soil profile as input. These spectra are enveloped by the 4% damped design basis amplified l response spectra at the fundamental natural frequencies of the pressurizer. However, they are not enveloped by the design basis amplified response spectra at all frequencies. Therefore, as described above per the direction of Dr. Kennedy, EQE is presently in the process of developing additional l
amplified response spectra for the upper bound and lower bound soil profile estimates. These spectra are l being broadened and enveloped and plotted at 4% and 7% damping. The enveloped spectra are then combined with the spectra generated in accordance with the Standard Review Plan using the design basis ground response spectra as input. Since the response spectra generated from the UHS exceed the i
response spectra generated from the design basis response spectra at all frequencies above 6 Hz. and since the first frequency of the presr.urizer is 13 Hz, only the best estimate soil profile case is being used i for the spectra generated from the otsign basis spectra. The resulting enveloped response spectra is then used to determine loads on the pressurizer supports. As stated previously, if these loads are less than the ;
l loads generated from the 4% and 7% SSE damped design basis amplified response spectra, then use of the design basis amplified response spectra in conjunction with the Regulatory Guide 1.61 damping values isjustified. j GPU Nuclear expects to complete development of the 4% and 7% damped amplified response spectra generated from the uniform hazard spectra by the end of August 1999. The spectra will then be j enveloped and used as input to calculate loads on the pressurizer supports. This work is expected to be l complete by the first week in September. If the loads are less than those obtained from the 4% and 7%
SSE damped design basis amplified response spectra, then GPU Nuclear plans to submit a formal license l
change request to revise the TMI-l UFSAR to permit use of the damping values from Regulatory Guide 1.61 with the existing design basis amplified response spectra for analysis of the pressurizer. This analysis will demonstrate that the existing pressurizer supports fully comply with all other requirements of the TMI-l UFSAR if the regulatory guide' damping values are used in the analysis.
l l
1 L_