Forwards Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted.Operator Workaround Program Found to Be Acceptable
ML20199G740
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/12/1999
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20199G743 List:
References
50-289-98-08, 50-289-98-8, NUDOCS 9901250002
Download: ML20199G740 (2)


See also: IR 05000289/1998008

Text

..

..

.

1'

1

!

.

January 12,1999

Mr. J. Langenbach

Vice President and Director

GoU Nuclear, Inc.

Three Mile Island Nuclear Station

P. O. Box 480

Middletown, Pennsylvania 17057-0480

.

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NO. 50-289/98-08

Dear Mr. Langenbach:

On December 26,1998, the NRC completed an inspection at your Three Mile Island Unit 1

reactor facility. The enclosed report preser ts the results of that inspection which the

resident inspectors discussed with you and your staff at the exit meeting on January 7,

1999.

Your staff operated the unit safely over the period. Operators performed routine taskc well

and responded properly to several equipment conditions. Observed maintenance and

surveillance activities were properly conducted. Engineering provided good support to daily

plant issues. We found your operator workaround program acceptable, with a minimal,

non-safety significant, backlog of open items,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

No reply to this letter is necessary. We appreciate your cooperation.

Sincerely,

Original Signed By:

Peter W. Eselgroth, Chief

Projects Branch No. 7

Division of Reactor Projects

Docket No.: 50-289

Enclosure:

NRC Integrated Inspection Report No. 50-289/98-08

\\,

210021.

P=mm ma,

^

lr

PDR

.

r..=

l

.-

i

Mr. J. Langenbach

2

cc w/ encl:

,

M. J. Ross, Director, Operations and Maintenance

'

D. Smith, PDMS Manager

M. Laggart, Manager, Licensing and Vendor Audits

J. Wetmore, Manager, Nuclear Safety and Licensing

E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)

TMI-Alert (TMIA)

l

Commonwealth of Penrisylvania

l

'

Distribution w/ encl:

-

Region i Docket Room (with concurrences)

Nuclear Safety information Center (NSiC)

PUBLIC

NRC Resident inspector

H. Miller, RA/J. Wiggins, DRA

P. Eselgroth, DRP

N. Perry, DRP

C. O'Daniell, DRP

Distribution w/enci (VIA E-MAIL):

G. Shear, OEDO

W. Dean, PD1-2, NRR

T. Colburn, PD1-2, NRR

R. Eaton, PDI-2, NRR

!

R. Correia, NRR

D. Desaulniers, NRR

DOCDESK

i

Inspection Program Branch, NRR (IPAS)

.

DOCUMENT NAME: G:\\ BRANCH 7\\TMi\\TMl980- 1.WPD

T5 teceive a copy of this document, indicate in the box: "C' = Copy without attachmet.t/ enclosure

  • E' = Copy with attachment / enclosure
  • C* = No copy

' OFFICE

Rl/DRP

g Rl/DR)

l6

/

l

_

'

NAME

WSchmidt p/F4 Rgi$dlSeth

DATE

1/n/99

14#99

01/ /99

01/ /99

01/ /99

OFFICIAL RECORD COPY

$