IR 05000289/2013001

From kanterella
Jump to navigation Jump to search
ROP-14 2013 Three Mile Island Nuclear Station Unit 1, Annual Assessment Letter, Report 05000289/2013001, and Inspection Plan
ML14062A095
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/04/2014
From: Michael Scott
Division Reactor Projects I
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
mangan, ka
References
IR-13-001
Download: ML14062A095 (6)


Text

March 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT NO. 1 (REPORT 05000289/2013001)

Dear Mr. Pacilio:

On February 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Three Mile Island Nuclear Station, Unit No. 1. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforce-ment actions from January 1, 2013, through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Three Mile Island, Unit No. 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. Three Mile Island, Unit No. 1, was in the Regulatory Response Column of the NRCs Reactor Oversight Process Action Matrix until the most recent quarter due to a White finding in the Mitigating Systems cornerstone associated with a degraded external flood barrier system that was identified during the fourth quarter of 2012 and described in inspection reports 05000289/2012005 dated February 11, 2013, and 05000289/2013009 dated April 20, 2013 (ML13042A277 and ML13120A040)1. The NRC determined that Three Mile Island, Unit No. 1, returned to the Licensee Response Column in the third quarter of 2013, because a supplemental inspection was successfully completed for the White finding on September 13, 2013, as documented in inspection report 05000289/2013010 dated October 22, 2013 (ML13295A355). Subsequently, Three Mile Island, Unit No. 1, remained in the Licensee Response Column in the fourth quarter of 2013 because all inspection findings had very low (i.e., Green) safety significance and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e.,

Green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections

The NRCs Agencywide Document Access and Management System (ADAMS) accession number for the referenced document(s). The document(s) is (are) publicly available and retrievable through the ADAMS link provided at the end of this letter using this number. conducted in calendar year (CY) 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, and Temporary Instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Kevin Mangan at (610)337-5234 with any questions you have regarding this letter.

Sincerely,

/RA/

Michael L. Scott, Acting Director Division of Reactor Projects Docket Nos.: 50-289 License Nos.: DPR-50 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML14062A095 OFFICE RI/DRP RI/DRP RI/DRP NAME LCline/ AD for KMangan/ AD for MScott/ MLS DATE 02/25/14 02/26/14 03/03/14 Distribution w/encl:

W. Dean, RA D. Lew, DRA M. Scott, DRP E. Benner, DRP R. Lorson, DRS J. Trapp, DRS J. Clifford, DNMS J. Marshall, DNMS Actg K. Mangan, DRP L. Cline, DRP G. Stock, DRP A. Dugandzic, DRP D. Werkheiser, DRP J. Heinly, DRP A. Diaz, DRP D. Screnci, PAO N. Sheehan, PAO D. Schroeder, DRP A. Burritt, DRP G. Dentel, DRP F. Bower, DRP R. McKinley, DRP K. Mangan, DRP R. Powell, DRP A. Dimitriadis, DRS J. Noggle, DRS M. Gray, DRS P. Krohn, DRS J. Rogge, DRS D. Jackson, DRS E. Quinones, RI OEDO C. ODaniell, ORA L. Pinkham, DRP K. Heater, DRS T. Haverkamp, DNMS RidsNrrPMThreeMileIsland Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource RidsNrrDirslpab Resource ROPAssessmentResource

Page 1 of 2 Three Mile Island 02/25/2014 11:00:15 Inspection / Activity Plan Report 22 01/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 4/7EXAM - TMI INITIAL EXAM 4 1 03/10/2014 03/14/2014 U01895 FY14-TMI INITIAL OPERATOR LICENSING EXAM 1 04/07/2014 04/11/2014 U01895 FY14-TMI INITIAL OPERATOR LICENSING EXAM TRI FI - TRIENNIAL FIRE PROTECTION 4 1 01/27/2014 01/31/2014 IP 7111105T Fire Protection [Triennial]

1 02/10/2014 02/14/2014 IP 7111105T Fire Protection [Triennial]

TI-182 - DEGRADED UNDERGROUND PIPING - PHASE 2 1 1 01/27/2014 01/30/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping EP PROG - EP PROGRAM INSPECTION 1 1 02/03/2014 02/07/2014 IP 7111402 Alert and Notification System Testing 1 02/03/2014 02/07/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 02/03/2014 02/07/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71003 - LR COMMITMENT INSP PHASE 2 4 1 02/17/2014 02/21/2014 IP 71003 Post-Approval Site Inspection for License Renewal 1 03/03/2014 03/07/2014 IP 71003 Post-Approval Site Inspection for License Renewal HP - RADIOACTIVITY & OC DOSE ASSESSMENT 1 1 03/24/2014 03/28/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/24/2014 03/28/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 03/24/2014 03/28/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/24/2014 03/28/2014 IP 71124.04 Occupational Dose Assessment 71152B - PI&R BIENNIAL 4 1 05/05/2014 05/09/2014 IP 71152B Problem Identification and Resolution 1 05/19/2014 05/23/2014 IP 71152B Problem Identification and Resolution HP - EXPOSURE CONTROLS AND ALARA INSPECTION 1 1 05/05/2014 05/09/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/05/2014 05/09/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 05/05/2014 05/09/2014 IP 71151-OR01 Occupational Exposure Control Effectiveness 71124 - RAD SAFETY INSPECTIONS 1 1 06/23/2014 06/27/2014 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RAD SAFETY INSPECTIONS 1 1 11/03/2014 11/07/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 11/03/2014 11/07/2014 IP 71151 Performance Indicator Verification 7111121 - CDBI 7 1 01/26/2015 01/30/2015 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Three Mile Island 02/25/2014 11:00:15 Inspection / Activity Plan Report 22 01/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111121 - CDBI 7 1 02/09/2015 02/13/2015 IP 7111121 Component Design Bases Inspection 1 02/23/2015 02/27/2015 IP 7111121 Component Design Bases Inspection 71124 - RAD SAFETY INSPECTION 1 1 03/09/2015 03/13/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/09/2015 03/13/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 03/09/2015 03/13/2015 IP 71124.04 Occupational Dose Assessment 7111111B - TMI REQUAL INSP W/ P/F RESULTS 2 1 03/16/2015 03/20/2015 IP 7111111B Licensed Operator Requalification Program 71124 - RAD SAFETY INSP 1 1 05/11/2015 05/15/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 05/11/2015 05/15/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/11/2015 05/15/2015 IP 71124.04 Occupational Dose Assessment 71124.08 - RADWASTE 1 1 05/11/2015 05/15/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.07 - RAD SAFETY INSPECTION 1 1 06/08/2015 06/12/2015 IP 71124.07 Radiological Environmental Monitoring Program 1 06/08/2015 06/12/2015 IP 71151 Performance Indicator Verification Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.