ML20195K361: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:-                                                                ;
    .
                                                                                                  l .
      '
        .'    .                              DEC - 21988
                                                                                                    ,
        In Reply Refer To:                                                                          i
        Occket:    50-298/88-27                                                                    ,
        Nebraska Public Power District
        ATTN: George ~A. Trevors                                                                    i
                  Division Manager - Nuclear Support                                                !
        P.O. Box 499                                                                              '
                                                                                                    ;
        Columbus, NE 68602-0499
        Gentlemen:
        This refers to the inspection conducted by Mr. n. Wise and Dr. J. B. Nicholas              {
        of this offi e during the period October 24-28, 1988, of activities authorized
        by NRC Operating License DPR-46, for Cooper Nuclear Station, and to the                    .
        discussion of our findings with Mr. R. E. Wilbur and other members of your                !
        staff at the conclusion of the inspection on October 28, 1988.                            !
                                                                                                  l
        Areas examined during the inspection included the chemistry / radiochemistry                (
        program and water chemistry and radiochemistry confirmatory measurements.                  &
        Within these areas, the inspection consisted of selective examination of                  j
        procedures and representative records, interviews with personnel, and                      ,
        observations by the NRC inspectors. The inspection findings are documented in              l
        the enclosed insnectiot: report.                                                          l
                                                                                                  i
        During this inspection, it was found that certain of your activities were in              !
        violation of NRC requirements. Consequently, you are required to respond to                !
        this violation, in wMting, in accordance with the provisions of Section 2.201              !
        of the N4C's "Rules of Practica," Part 2, Title 10, Code of Federal                        I
L      Regulations. Your response should be based on the specifics contained in the              (
        Notice of Violation erclosed with this letter.
l      The response direc n          this letter and the accompanying Notice is not subjtet
;      to the clearance p      mures of the Office of Management and Budget as required
:      by the Paperwork Re.iuction Act of 1980, PL 96-511.
['j    Should you have any questions concerning this inspection, we will be pleased to
                                                                                                  ,
                                                                                                  {
]
        discuss them with you.
                                                                                                    :
1
                                                      Sincerely,                                  (
l'                                                                                                t
1
*
                                                          Original Signed I4                      l
                                                              A. 11, li m h                        j
p                                                                                                  i
                                                      L. J. Callan, Director
.
                                                      Division of Reactor Projects                ,
                                                                                                  t
I                                                                                                  (
        RIV:FR            FRPS:            C:FR  -
                                                        C:R    " C:RPS/C  h D:  ) 0
$      J3 Niche    /c:h RWisd        ~  REBaerb      BMur,ay GLConst    e  LJC lan            r
;      /' /Jo/88          yp/88            n/30/88    v /30 /88 d /r /88    /t/1/88
'
                                                                                                    l
                                                                              b                  }
>
                  k
                  a
                                    '
                                          f                                                  \ \
)
.
                                                                                                ~
 
                                                        _        _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __          - - __.
  .
    .  .
      .                                                                                                                                    ,
              .
      Nebraska Public Power District                -2-
      Enclosures:
      1.  Appendix A - Notice of Violatior.
      2.  Appendix B - NRC Inspection Report
            50-298/88-27
      3.  Attachment 1 - Analytical Measurements                                                                                          ,
      4.  Attachment 2 - Water Chemistry Confirmatory Measurements Results
      5.  Attachment 3 - Criteria for Comparing Water Chemistry Analytical
                            Measurements
      6.  Attachment 4 - Radiological Confirmatory Measurements Results
      7.  Attachment 5 - Criteria for Comparing Radiological Analytical Measurements
      cc w/ enclosures:
      Cooper Nuclear Station
      ATTN: Guy Horn, Division Manager
                of Nuclear Operations
      P.O. Box 98
      Brownville, Nebraska 68321
      Kansas Radiation Control Program Director                                                                                            i
      Nebraska Radiation Control Progra?, Director
      DMB IE06
      bec distrib. by RIV:
      *RRI                                  *R. D. Martin, RA
      *Section Chief (DRP/C)                  Lisa Shea, RM/ALF
      *RPB-DRSS                              * MIS System
      "RIV File                              * Project Engineer, DRP/C
      *RSTS Operator                        *0RP
      *P. O'Connor NRR Project Manager (MS: 13-0-18)
;    *0RS                                  *R. L. Bangart                                                                                ,
      *R. r.. Baer                          *R. Hall
      *B. Nicholas                          *R. Wise
      "B. Murray
I
      *w/766
l
l
                                                                                                                                          ,
l
1
                                                                                                                        - _ - _ .
}}
}}

Latest revision as of 12:54, 13 November 2020

Forwards Insp Rept 50-298/88-27 on 881024-28 & Notice of Violation
ML20195K361
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/02/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20195K364 List:
References
NUDOCS 8812050192
Download: ML20195K361 (2)


See also: IR 05000298/1988027

Text

-  ;

.

l .

'

.' . DEC - 21988

,

In Reply Refer To: i

Occket: 50-298/88-27 ,

Nebraska Public Power District

ATTN: George ~A. Trevors i

Division Manager - Nuclear Support  !

P.O. Box 499 '

Columbus, NE 68602-0499

Gentlemen:

This refers to the inspection conducted by Mr. n. Wise and Dr. J. B. Nicholas {

of this offi e during the period October 24-28, 1988, of activities authorized

by NRC Operating License DPR-46, for Cooper Nuclear Station, and to the .

discussion of our findings with Mr. R. E. Wilbur and other members of your  !

staff at the conclusion of the inspection on October 28, 1988.  !

l

Areas examined during the inspection included the chemistry / radiochemistry (

program and water chemistry and radiochemistry confirmatory measurements. &

Within these areas, the inspection consisted of selective examination of j

procedures and representative records, interviews with personnel, and ,

observations by the NRC inspectors. The inspection findings are documented in l

the enclosed insnectiot: report. l

i

During this inspection, it was found that certain of your activities were in  !

violation of NRC requirements. Consequently, you are required to respond to  !

this violation, in wMting, in accordance with the provisions of Section 2.201  !

of the N4C's "Rules of Practica," Part 2, Title 10, Code of Federal I

L Regulations. Your response should be based on the specifics contained in the (

Notice of Violation erclosed with this letter.

l The response direc n this letter and the accompanying Notice is not subjtet

to the clearance p mures of the Office of Management and Budget as required
by the Paperwork Re.iuction Act of 1980, PL 96-511.

['j Should you have any questions concerning this inspection, we will be pleased to

,

{

]

discuss them with you.

1

Sincerely, (

l' t

1

Original Signed I4 l

A. 11, li m h j

p i

L. J. Callan, Director

.

Division of Reactor Projects ,

t

I (

RIV:FR FRPS: C:FR -

C:R " C:RPS/C h D: ) 0

$ J3 Niche /c:h RWisd ~ REBaerb BMur,ay GLConst e LJC lan r

/' /Jo/88 yp/88 n/30/88 v /30 /88 d /r /88 /t/1/88

'

l

b }

>

k

a

'

f \ \

)

.

~

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ - - __.

.

. .

. ,

.

Nebraska Public Power District -2-

Enclosures:

1. Appendix A - Notice of Violatior.

2. Appendix B - NRC Inspection Report

50-298/88-27

3. Attachment 1 - Analytical Measurements ,

4. Attachment 2 - Water Chemistry Confirmatory Measurements Results

5. Attachment 3 - Criteria for Comparing Water Chemistry Analytical

Measurements

6. Attachment 4 - Radiological Confirmatory Measurements Results

7. Attachment 5 - Criteria for Comparing Radiological Analytical Measurements

cc w/ enclosures:

Cooper Nuclear Station

ATTN: Guy Horn, Division Manager

of Nuclear Operations

P.O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director i

Nebraska Radiation Control Progra?, Director

DMB IE06

bec distrib. by RIV:

  • RRI *R. D. Martin, RA
  • Section Chief (DRP/C) Lisa Shea, RM/ALF
  • RPB-DRSS * MIS System

"RIV File * Project Engineer, DRP/C

  • RSTS Operator *0RP
  • P. O'Connor NRR Project Manager (MS: 13-0-18)
*0RS *R. L. Bangart ,
  • R. r.. Baer *R. Hall
  • B. Nicholas *R. Wise

"B. Murray

I

  • w/766

l

l

,

l

1

- _ - _ .