Text
-
l
.
.
'
.'
DEC - 21988
.
,
In Reply Refer To:
i
Occket:
50-298/88-27
,
Nebraska Public Power District
ATTN: George ~A. Trevors
i
Division Manager - Nuclear Support
!
P.O. Box 499
'
Columbus, NE 68602-0499
Gentlemen:
This refers to the inspection conducted by Mr. n. Wise and Dr. J. B. Nicholas
{
of this offi e during the period October 24-28, 1988, of activities authorized
by NRC Operating License DPR-46, for Cooper Nuclear Station, and to the
.
discussion of our findings with Mr. R. E. Wilbur and other members of your
!
staff at the conclusion of the inspection on October 28, 1988.
!
l
Areas examined during the inspection included the chemistry / radiochemistry
(
program and water chemistry and radiochemistry confirmatory measurements.
&
Within these areas, the inspection consisted of selective examination of
j
procedures and representative records, interviews with personnel, and
,
observations by the NRC inspectors. The inspection findings are documented in
l
the enclosed insnectiot: report.
l
i
During this inspection, it was found that certain of your activities were in
!
violation of NRC requirements. Consequently, you are required to respond to
!
this violation, in wMting, in accordance with the provisions of Section 2.201
!
of the N4C's "Rules of Practica," Part 2, Title 10, Code of Federal
I
L
Regulations.
Your response should be based on the specifics contained in the
(
Notice of Violation erclosed with this letter.
l
The response direc n
this letter and the accompanying Notice is not subjtet
to the clearance p
mures of the Office of Management and Budget as required
by the Paperwork Re.iuction Act of 1980, PL 96-511.
['
,
j
Should you have any questions concerning this inspection, we will be pleased to
{
]
discuss them with you.
1
l'
Sincerely,
(
t
1
Original Signed I4
l
A. 11, li m h
j
i
p
L. J. Callan, Director
.
Division of Reactor Projects
,
t
I
(
C:R
" C:RPS/C
h D: )
0
RIV:FR
FRPS:
C:FR
-
$
J3 Niche
/c:h RWisd
REBaerb
BMur,ay GLConst
e
LJC lan
r
/' /Jo/88
yp/88
n/30/88
v /30 /88 d /r /88
/t/1/88
~
'
b
}
k
f
'
\\ \\
>
a
)
-- ---
--
~
.
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
__
- - __.
.
.
.
.
,
.
Nebraska Public Power District
-2-
Enclosures:
1.
Appendix A - Notice of Violatior.
2.
Appendix B - NRC Inspection Report
50-298/88-27
3.
Attachment 1 - Analytical Measurements
,
4.
Attachment 2 - Water Chemistry Confirmatory Measurements Results
5.
Attachment 3 - Criteria for Comparing Water Chemistry Analytical
Measurements
6.
Attachment 4 - Radiological Confirmatory Measurements Results
7.
Attachment 5 - Criteria for Comparing Radiological Analytical Measurements
cc w/ enclosures:
Cooper Nuclear Station
ATTN: Guy Horn, Division Manager
of Nuclear Operations
P.O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
i
Nebraska Radiation Control Progra?, Director
DMB IE06
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
- Section Chief (DRP/C)
Lisa Shea, RM/ALF
- RPB-DRSS
- MIS System
"RIV File
- Project Engineer, DRP/C
- RSTS Operator
- 0RP
- P. O'Connor NRR Project Manager (MS:
13-0-18)
- 0RS
- R. L. Bangart
,
- R.
r.. Baer
- R. Hall
- B. Nicholas
- R. Wise
"B. Murray
I
- w/766
l
l
,
l
1
. .
.
. .
. .
.
.
- _ - _ .