ML17355A333: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULA'1 Y INFORMATION DISTRXBUTXO 4 SYSTEM (RIDS)ACCESSION NBR:9905190023 DOC.DATE: 99/04/30 NOTARIZED:
{{#Wiki_filter:REGULA'1   Y INFORMATION DISTRXBUTXO 4 SYSTEM (RIDS)
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50'51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME'UTHOR AFFILIATION SHUKLA,G.S.
ACCESSION NBR:9905190023           DOC.DATE:     99/04/30     NOTARIZED: NO             DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                     C 05000250 50'51 Turkey Point Plant, Unit 4, Florida Power and Light                     C 05000251 AUTH. NAME       'UTHOR AFFILIATION SHUKLA,G.S.           Florida   Power & Light Co.
Florida Power&Light Co.HOVEY,R.J.
HOVEY,R.J.           Florida   Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION
RECIP . NAME         RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Apr 1999 for Turkey Point, Units 3&4.With 990511 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL (SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME LPD2-2 PD COPIES LTTR ENCL 1-1 RECIPIENT ID CODE/NAME JABBOUR,K COPXES LTTR ENCL 1 1 0 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 1 1 1 1 RGN2 NOAC CENTER 0 1 1 1 1 1'1 D'E NOTE TO ALL"RIDS" RECIPZENTS:
Monthly operating repts       for   Apr 1999   for Turkey Point, Units 3 & 4.With 990511       ltr.
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 H4Y 11 1S99 L-99-099 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Documerit Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-A ril 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the April, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant/, GSS Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant~p$Q V 9905i90023 990430 PDR ADOCK 05000250 R PDR an FPL Group company I'\t Rig v~1 ,I'r' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: 50-250 99 COMPLETED BY: G.S.Shukla TELEPHQNB:
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         i ENCL   (   SIZE:
L00 6-REPORT MONTH~Aril 1999 DAY 4/1/99 4/2/99 4/3/99 4/4/99 4/5/99 4/6/99 4/7/99 4/8/99 4/9/99 4/10/99 4/11/99 4/12/99 4/13/99 4/14/99 4/1 5/99 4/16/99 4/17/99 4/18/99 4/19/99 4/20/99 4/21/99 4/22/99 4/23/99 4/24/99 4/25/99 4/26/99 4/27/99 4/28/99 4/29/99 4/30/99 AVERAGE DAILY POWER LEVEL (Mwe-Net)722 716 709 709 709 708 708 714 710 708 706 705 707 707 706 707 704 717 728 722 719 713 707 703 700 699 702 703 705 707 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3~Ma 3 1999 G.S.Shukla 305 246-6047 REPORTING PERIOD A~rll'1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)MONTH-YTD-CUMULATIVE 719.0 2879.0 163789.0 719.0 2879.0 161596.6 0.0 0.0 121.8 509977.0 2064823.0 103885682.0  
TITLE: Monthly Operating Report (per Tech Specs)
E NOTES:
RECIPIENT            COPIES              RECIPIENT           COPXES ID  CODE/NAME        LTTR ENCL          ID CODE/NAME         LTTR ENCL                0 LPD2-2   PD               1   -
1       JABBOUR,K                 1     1 INTERNAL: AEOD/SPD/RRAB               1    1              CENTER    0        1      1 OC/DBA/PAD               1    1      RGN2                      1      1 EXTERNAL: LMITCO MARSHALL             1     1       NOAC                     1     '1 NRC PDR                  1     1 D
                                                                                                    'E NOTE TO ALL "RIDS" RECIPZENTS:
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               9   ENCL     9
 
H4Y 11   1S99 L-99-099 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Documerit Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-A ril 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the April, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant
                                                                                              /,
GSS Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
                                                              ~p$ Q V
9905i90023 990430 PDR     ADOCK     05000250 R                     PDR an FPL Group company
 
I'\ t v~
Rig 1
                ,I' r'
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.       50-250 UNIT:
DATE:                     99 COMPLETED BY:   G. S. Shukla TELEPHQNB:       L00     6-REPORT MONTH ~Aril 1999 DAY             AVERAGE DAILYPOWER LEVEL (Mwe-Net) 4/1/99                       722 4/2/99                       716 4/3/99                       709 4/4/99                     709 4/5/99                       709 4/6/99                       708 4/7/99                     708 4/8/99                     714 4/9/99                     710 4/10/99                       708 4/11/99                       706 4/12/99                       705 4/13/99                       707 4/14/99                       707 4/1 5/99                     706 4/16/99                       707 4/17/99                       704 4/18/99                       717 4/19/99                       728 4/20/99                       722 4/21/99                       719 4/22/99                       713 4/23/99                       707 4/24/99                     703 4/25/99                     700 4/26/99                     699 4/27/99                     702 4/28/99                     703 4/29/99                     705 4/30/99                     707
 
OPERATING DATAREPORT DOCKET NO.                     50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            ~Ma   3 1999 COMPLETED BY                    G. S. Shukla TELEPHONE                        305 246-6047 REPORTING PERIOD A~rll '1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)         693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical                 719.0    2879.0    163789.0
: 4. Number of Hours Generator Was On Line                 719.0   2879.0     161596.6
: 5. Unit Reserve Shutdown Hours                            0.0       0.0       121.8
: 6. Net Electrical Energy (MWH)                        509977.0 2064823.0 103885682.0


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250 HM9:~ki IH DATE: M~1999 COMPLETED BY: G.S.Shukla I 9 HHM!: Hkk 6-66 REPORT MONTH~Aril 1999 Unit 3 operated at essentially 100%for the entire month of April, 1999.
OF OPERATING EXPERIENCE DOCKET NO.
UNIT SHUTDOWNS DOCKET NO.50-250 IIMT N¹NB: T 3 P I¹I DATE: M~H3 1999 COMPLETED BY: G.S.Shukla TELEPHONE:
HM9:
LED¹-666 REPORT MONTH April 1999 No.Date Type'uration (Hours)Reason'ethod of Shutting Down Reactor'ause
DATE:
&Corrective Action Coaraents N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:
                                                                        ~ki 50-250 M~1999 IH COMPLETED BY:       G. S. Shukla I   9 HHM!:         Hkk 6-66 REPORT MONTH ~Aril 1999 Unit 3 operated at essentially 100% for the entire month of April, 1999.
50-251¹¹M G.S.Shukla 305 246-6047 RBPORT MONTH~Aril 1999 DAY 4/1/99 4/2/99 4/3/99 4/4/99 4/5/99 4/6/99 4/7/99 4/8/99 4/9/99 4/10/99 4/11/99 4/12/99 4/1 3/99 4/14/99 4/15/99 4/16/99 4/17/99 4/18/99 4/19/99 4/20/99 4/21/99 4/22/99 4/23/99 4/24/99 4/25/99 4/26/99 4/27/99 4/28/99 4/29/99 4/30/99 AVERAGE DAILY POWER LEVEL (MWe-Net)0 0 0 0 0 0 0 183 493 618 702 705 705 710 710 706 705 719 729 725 722 716 709 705 701 700 700 703 704 707 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4~Ma 3 1999 G.S.Shukla REPORTING PERIOD ALII 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical MONTH 573.7-YTD-CUMULATIVE 2325.7 160393.2 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)552.8 0.0 369880 2304.8 0.0 1610026 156041.3 577.2 101283124 UNIT SHUTDOWNS DOCKET NO.50-251 i 2N 22 N4 4N6: 0 4¹4 DATE: M~H3 1999 COMPLETED BY: G.S.Shukla 2'ELEPHONH:
 
6220 246-60 REPORT MONTH~Aril 1999 No.Date Type'uration (Hours)Reason Method of Shutting Down Reactor'ause
UNIT SHUTDOWNS DOCKET NO.             50-250 IIMTN¹NB:             T 3 P I     ¹I DATE:                 M~H3 1999 COMPLETED BY:         G. S. Shukla TELEPHONE:             LED¹-666 REPORT MONTH April 1999 Type'uration         Reason'ethod     of                         Corrective Action No.          Date Reactor'ause (Hours)                Shutting                          Coaraents Down N/A           N/A N/A       N/A         N/A         N/A     N/A F - Forced         Reason                                Method S - Scheduled       A - Equipment Failure               1 - Manual B - Maintenance or Test               2 - Manual Scram C - Refueling                         3 - Automatic Scram D - Regulatory restriction           4 - Continuation E - Operator Training &               5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)
&Corrective Action Corrnrents 1999 0005 3/15/99 166.0 Shut down for refueling.
H - Other (Explain)
F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scrara 4-Continued 5-Other (Explain)
 
~~~$~\
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.         50-251 UNIT:                          ¹¹ DATE:              M COMPLETED BY:      G. S. Shukla TELEPHONE:          305 246-6047 RBPORT MONTH ~Aril 1999 DAY             AVERAGE DAILYPOWER LEVEL (MWe-Net) 4/1/99                     0 4/2/99                     0 4/3/99                     0 4/4/99                     0 4/5/99                     0 4/6/99                     0 4/7/99                     0 4/8/99                     183 4/9/99                     493 4/10/99                     618 4/11/99                     702 4/12/99                     705 4/1 3/99                   705 4/14/99                     710 4/15/99                     710 4/16/99                     706 4/17/99                     705 4/18/99                     719 4/19/99                     729 4/20/99                     725 4/21/99                     722 4/22/99                     716 4/23/99                     709 4/24/99                     705 4/25/99                     701 4/26/99                     700 4/27/99                     700 4/28/99                     703 4/29/99                     704 4/30/99                     707
 
OPERATING DATAREPORT DOCKET NO.                       50-251 UNIT NAME                        TURKEY POINT UNIT 4 DATE                            ~Ma 3 1999 COMPLETED BY                    G. S. Shukla TELEPHONE REPORTING PERIOD         ALII 1999 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)           693 MONTH    -YTD-    CUMULATIVE
: 3. Number of Hours Reactor Was Critical           573.7   2325.7     160393.2
: 4. Number of Hours Generator Was On Line         552.8    2304.8    156041.3
: 5. Unit Reserve Shutdown Hours                     0.0      0.0        577.2
: 6. Net Electrical Energy (MWH)                 369880   1610026   101283124
 
UNIT SHUTDOWNS DOCKET NO.               50-251 i2N 22 N4 4N6:                 0     4 ¹4 DATE:                     M~H3 1999 COMPLETED BY: G. S. Shukla 2'ELEPHONH:               6220   246-60 REPORT MONTH ~Aril 1999 No.           Date   Type'uration           Reason     Method of                                 Corrective Action Reactor'ause (Hours)                  Shutting                                  Corrnrents Down 1999 0005       3/15/99           166.0                                   Shut down   for refueling.
F - Forced               Reason                                Method S - Scheduled           A - Equipment Failure                 1 - Manual B - Maintenance or Test               2 - Manual Scram C - Refueling                         3 - Automatic Scrara D - Regulatory restriction             4  Continued E - Operator Training &               5  - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
~   ~
      ~ $ ~
  \


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.             50-251 UNIT:                      9     1 ¹ DATE:                          1999 COMPLETE BY:            G. S. Shukla TELEPHONE:              ~05 6-6 REPORT MONTH April 1999 Unit 4 was shutdown for a refueling outage which started on March 15, 1999. The unit remained shut down for refueling until April 7, 1999, and was restarted on April 8, 1999.
50-251 9 1¹1999 G.S.Shukla~05 6-6 REPORT MONTH April 1999 Unit 4 was shutdown for a refueling outage which started on March 15, 1999.The unit remained shut down for refueling until April 7, 1999, and was restarted on April 8, 1999.
 
0~0 Jl}}
0 ~ 0 Jl}}

Latest revision as of 21:05, 3 February 2020

Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr
ML17355A333
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/30/1999
From: Hovey R, Shukla G
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-099, L-99-99, NUDOCS 9905190023
Download: ML17355A333 (12)


Text

REGULA'1 Y INFORMATION DISTRXBUTXO 4 SYSTEM (RIDS)

ACCESSION NBR:9905190023 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50'51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME 'UTHOR AFFILIATION SHUKLA,G.S. Florida Power & Light Co.

HOVEY,R.J. Florida Power & Light Co.

RECIP . NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Apr 1999 for Turkey Point, Units 3 & 4.With 990511 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL ( SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 LPD2-2 PD 1 -

1 JABBOUR,K 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CENTER 0 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 '1 NRC PDR 1 1 D

'E NOTE TO ALL "RIDS" RECIPZENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

H4Y 11 1S99 L-99-099 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Documerit Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort-A ril 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the April, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant

/,

GSS Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

~p$ Q V

9905i90023 990430 PDR ADOCK 05000250 R PDR an FPL Group company

I'\ t v~

Rig 1

,I' r'

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-250 UNIT:

DATE: 99 COMPLETED BY: G. S. Shukla TELEPHQNB: L00 6-REPORT MONTH ~Aril 1999 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net) 4/1/99 722 4/2/99 716 4/3/99 709 4/4/99 709 4/5/99 709 4/6/99 708 4/7/99 708 4/8/99 714 4/9/99 710 4/10/99 708 4/11/99 706 4/12/99 705 4/13/99 707 4/14/99 707 4/1 5/99 706 4/16/99 707 4/17/99 704 4/18/99 717 4/19/99 728 4/20/99 722 4/21/99 719 4/22/99 713 4/23/99 707 4/24/99 703 4/25/99 700 4/26/99 699 4/27/99 702 4/28/99 703 4/29/99 705 4/30/99 707

OPERATING DATAREPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE ~Ma 3 1999 COMPLETED BY G. S. Shukla TELEPHONE 305 246-6047 REPORTING PERIOD A~rll '1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 719.0 2879.0 163789.0
4. Number of Hours Generator Was On Line 719.0 2879.0 161596.6
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 509977.0 2064823.0 103885682.0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

HM9:

DATE:

~ki 50-250 M~1999 IH COMPLETED BY: G. S. Shukla I 9 HHM!: Hkk 6-66 REPORT MONTH ~Aril 1999 Unit 3 operated at essentially 100% for the entire month of April, 1999.

UNIT SHUTDOWNS DOCKET NO. 50-250 IIMTN¹NB: T 3 P I ¹I DATE: M~H3 1999 COMPLETED BY: G. S. Shukla TELEPHONE: LED¹-666 REPORT MONTH April 1999 Type'uration Reason'ethod of Corrective Action No. Date Reactor'ause (Hours) Shutting Coaraents Down N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continuation E - Operator Training & 5 - Other (Explain License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-251 UNIT: ¹¹ DATE: M COMPLETED BY: G. S. Shukla TELEPHONE: 305 246-6047 RBPORT MONTH ~Aril 1999 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 4/1/99 0 4/2/99 0 4/3/99 0 4/4/99 0 4/5/99 0 4/6/99 0 4/7/99 0 4/8/99 183 4/9/99 493 4/10/99 618 4/11/99 702 4/12/99 705 4/1 3/99 705 4/14/99 710 4/15/99 710 4/16/99 706 4/17/99 705 4/18/99 719 4/19/99 729 4/20/99 725 4/21/99 722 4/22/99 716 4/23/99 709 4/24/99 705 4/25/99 701 4/26/99 700 4/27/99 700 4/28/99 703 4/29/99 704 4/30/99 707

OPERATING DATAREPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE ~Ma 3 1999 COMPLETED BY G. S. Shukla TELEPHONE REPORTING PERIOD ALII 1999 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 573.7 2325.7 160393.2
4. Number of Hours Generator Was On Line 552.8 2304.8 156041.3
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 369880 1610026 101283124

UNIT SHUTDOWNS DOCKET NO. 50-251 i2N 22 N4 4N6: 0 4 ¹4 DATE: M~H3 1999 COMPLETED BY: G. S. Shukla 2'ELEPHONH: 6220 246-60 REPORT MONTH ~Aril 1999 No. Date Type'uration Reason Method of Corrective Action Reactor'ause (Hours) Shutting Corrnrents Down 1999 0005 3/15/99 166.0 Shut down for refueling.

F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scrara D - Regulatory restriction 4 Continued E - Operator Training & 5 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~ ~

~ $ ~

\

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: 9 1 ¹ DATE: 1999 COMPLETE BY: G. S. Shukla TELEPHONE: ~05 6-6 REPORT MONTH April 1999 Unit 4 was shutdown for a refueling outage which started on March 15, 1999. The unit remained shut down for refueling until April 7, 1999, and was restarted on April 8, 1999.

0 ~ 0 Jl