ML17348B182: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 09/30/1991
| issue date = 09/30/1991
| title = Monthly Operating Repts for Sept 1991 for Turkey Point,Units 3 & 4.W/911014 Ltr
| title = Monthly Operating Repts for Sept 1991 for Turkey Point,Units 3 & 4.W/911014 Ltr
| author name = LEONARD C M, PLUNKETT T F
| author name = Leonard C, Plunkett T
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DI UTION DEMONSTTION SYSTEM 4 1'~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9110210305 DOC.DATE: M~~NOTARIZED:
{{#Wiki_filter:ACCELERATED DI                           UTION DEMONSTTION                   SYSTEM 4
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION LEONARD,C.M.
1'~
Florida Power&Light Co.PLUNKETT,T.F.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION
ACCESSION NBR:9110210305                 DOC.DATE: M~~
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and NOTARIZED: NO Light   C DOCKET 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and                 Light   C 05000251 AUTH. NAME               AUTHOR AFFILIATION LEONARD,C.M.           Florida     Power & Light Co.
PLUNKETT,T.F.           Florida     Power & Light Co.
RECIP.NAME               RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly o'ng repts for Sept.1991 for Turkey Point, Units 3&4-.W 11014 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL!SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES D RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R INTERNAL: AEOD/DOA NRR/D WREB10 RE~E 1 EXTERNAL EG&G BRYCE i J~H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly     o         'ng repts   for Sept. 1991 for Turkey Point, Units 3   & 4-.W   11014     tr.                                                       D DISTRIBUTION CODE: IE24D               COPIES RECEIVED:LTR     I ENCL   !   SIZE:
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14  
TITLE: Monthly Operating Report (per Tech Specs)
~'I P.O.Box 029100, Miami, FL, 33102-9100 POT 14$91 L-91-273 10 CFR 50'6 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
NOTES RECIPIENT               COPIES            RECIPIENT          COPIES ID CODE/NAME             LTTR ENCL      ID  CODE/NAME      LTTR ENCL          D PD2-2 LA                     3    3    PD2-2 PD                1    1 AULUCK,R                     1    1                                                D INTERNAL: AEOD/DOA                         1    1    AEOD/DSP/TPAB          1    1 NRR/D       WREB10           1    1    NRR/DOEA/OEAB          1    1 RE   ~   E         1        1    1    RGN2                    1    1 EXTERNAL     EG&G BRYCE i J ~ H           1     1     NRC PDR                 1     1 NSIC                          1     1 D
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/DRP/CML attachments cc: Stewart D.Ebneter,, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9ii02i0305 910930 PDR ADOCK 05000250 R PDR an FPL Gcoop company>r>q I)
D D
IO r I l E.I' AVERAGE'AILY UNIT POWER LEVEL DOCKET NO.50-250 UNIT Turke Point 3 DATE October 7 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER'LEVEL (MWe-Net)09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91.09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-250 DATE 10/7/91 COMPLETED BY C.M.LEONARD TELEPHONE 305/246/7103 l.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD:SEPTEMBER 1991 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO'HICH RESTRICTED'F ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 60.9 0.0 0.0 0.0 0 0-9020 0.0 0.0 0.0 0.0 0.0 6551 60.9 0.0 0.0 0.0 0 0-17478 0.0 0.0 0.0 0.0 0.0 164984.6 104534.1 844.4 103055.7 121.8 214231642 68615991 64861040 62.5 62.5 60.2 56.7 12.5 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/04/91 Ik  
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 14   ENCL   14
 
~
P.O. Box 029100, Miami, FL, 33102-9100 POT     14     $ 91 L-91-273 10 CFR 50         '6 U. S. Nuclear Regulatory Commission Attn:   Document Control Desk Washington, D. C.             20555 Gentlemen:
RE:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly   yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/CML attachments cc:   Stewart D. Ebneter,, Regional Administrator, Region II,               USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9ii02i0305 910930 PDR   ADOCK   05000250 R                     PDR                                         >r>q an FPL Gcoop company                                               I
                                                                              )
 
IO r
I l
E.
I'
 
AVERAGE'AILY UNIT   POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point     3 DATE October 7 1991 COMPLETED BY   C. M. Leonard TELEPHONE   305   246-7103 MONTH     Se tember   1991 AVERAGE DAILY POWER 'LEVEL (MWe-Net) 09/01/91               0 09/02/91               0 09/03/91               0 09/04/91               0 09/05/91               0 09/06/91               0 09/07/91               0 09/08/91               0 09/09/91               0 09/10/91               0 09/11/91               0 09/12/91               0 09/13/91               0 09/14/91               0 09/15/91               0 09/16/91               0 09/17/91               0 09/18/91               0 09/19/91               0 09/20/91               0 09/21/91.               0 09/22/91               0 09/23/91               0 09/24/91               0 09/25/91               0 09/26/91               0 09/27/91               0 09/28/91               0 09/29/91               0 09/30/91               0
 
OPERATING DATA REPORT DOCKET NO         50 - 250 DATE               10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE     305/246/7103 OPERATING STATUS
: l. UNIT NAME: TURKEY POINT   UNIT 3
: 2. REPORTING PERIOD:SEPTEMBER 1991
: 3. LICENSED THERMAL POWER (MWT):                   2200
: 4. NAMEPLATE RATING (GROSS MWE):                     760
: 5. DESIGN ELECTRICAL RATING (NET MWE):               693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS   NUMBER 3 THROUGH     7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO'HICH RESTRICTED'F     ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD- CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        720      6551        164984.6
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL             60.9        60.9      104534. 1
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0        844.4
: 14. HOURS GENERATOR ON-LINE                           0.0        0.0      103055.7
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0        121. 8
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                 0          0    214231642
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)             0          0    68615991
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)           -9020    -17478      64861040
: 19. UNIT SERVICE FACTOR                               0.0         0.0         62.5
: 20. UNIT AVAILABILITYFACTOR                          0.0         0.0         62.5
: 21. CAPACITY FACTOR (USING MDC NET)                  0.0         0.0         60.2
: 22. CAPACITY FACTOR (USING DER NET)                  0.0         0.0         56.7
: 23. UNIT FORCED OUTAGE RATE                          0.0         0.0         12.5
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:     10/04/91
 
Ik


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250'NIT Turke Point 3 DATE October 7 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 3 was.shutdown on December 12, 1990 for a scheduled Upgrades Outage.
OF OPERATING EXPERIENCE DOCKET NO. 50-250'NIT Turke Point 3 DATE October 7 1991 COMPLETED BY   C. M. Leonard TELEPHONE             305 246-7103 REPORT MONTH   Se tember   1991 Unit 3 was .shutdown on December 12, 1990   for a scheduled Upgrades Outage.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH September 1991 DOCKET NO.UNIT NAME Turkey Point&#xb9;3 DATE October 7, 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 Date Type'uration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Reports System Code4 Component Codes Cause 8 Corrective Actionto PreventRecurrence 22 901212 S 720 H N/A EB Engine Unit 3 was shutdown for scheduled Upgrades Outage.F Forced S Scheduled Reason A-Equipment Failure(Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report (LER)File (NUREG<161)
 
Exhibit 1-Same Source (Ql 0~f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT Turke Point 4 DATE October 7 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER LEVEL (MWe-Net)09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91 09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91 i~i~'):J OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-251 DATE 10/7/91 COMPLETED BY C.M.LEONARD TELEPHONE 305/246/7103 l.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD:SEPTEMBER 1991 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 0.0 0.0 0.0 0.0 0 0-1881 0.0 0.0 0.0 0.0 0.0 655 I 0.0 0.0 0.0 0.0 0 0-9911 0.0 0.0 0.0 0.0 0.0 158716.0 101186.4 166.6 97567.1 32.1 205630060 65612880 62043717 61.5 61.5 59.8 56.4 11.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/04/91  
UNIT SHUTDOWNS AND POWER REDUCTIONS                                 DOCKET NO.
~0  
UNIT NAME       Turkey Point &#xb9;3 DATE October 7, 1991 COMPLETED BY C. M. Leonard REPORT MONTH        September 1991                          TELEPHONE         305 246-7103 Method of Shutting      Licensee                                        Cause 8 Corrective Down          Event      System  Component                      Actionto Date Type'uration (Hours)   Reason~     Reactor       Reports     Code4     Codes                   PreventRecurrence 22 901212       S     720           H                   N/A           EB       Engine       Unit 3 was shutdown for scheduled Upgrades Outage.
F Forced             Reason                                              Method                            Exhibit G- Instructions S Scheduled           A - Equipment Failure(Explain)                       1 - Manual                        for Preparation of Data 8 - Maintenance or Test                             2 - Manual Scram                  Entry Scheets Ucensee C - Refueling                                       3 - Automatic Scram              Event Report (LER) File D - Regulatory Restriction                           4 - Continued                    (NUREG<161)
E - Operator Training 8 Ucense Examination         5 - Load Reduction F - Administrative                                   9 - Other (Explain)
G - Operational Error (Explain)                                                       Exhibit 1-Same Source H - Other (Explain)
 
(Ql 0 ~
f
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point     4 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE   305   246-7103 MONTH     Se tember   1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91 09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91
 
i~ i~
      ' )
:J
 
OPERATING DATA REPORT DOCKET NO         50 - 251 DATE               10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE     305/246/7103 OPERATING STATUS
: l. UNIT NAME: TURKEY POINT   UNIT 4
: 2. REPORTING PERIOD:SEPTEMBER 1991
: 3. LICENSED THERMAL POWER (MWT):                   2200
: 4. NAMEPLATE RATING (GROSS MWE):                   760
: 5. DESIGN ELECTRICAL RATING (NET MWE):             693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH       7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                          720      655 I        158716. 0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL               0.0        0.0      101186. 4
: 13. REACTOR RESERVE SHUTDOWN HOURS                     0.0        0.0        166. 6
: 14. HOURS GENERATOR ON-LINE                           0.0        0.0      97567. 1
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0          32. 1
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                 0          0    205630060
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)               0          0    65612880
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)           -1881      -9911      62043717
: 19. UNIT SERVICE FACTOR                               0.0         0.0           61.5
: 20. UNIT AVAILABILITYFACTOR                            0.0         0.0           61.5 0.0         0.0           59.8
: 22. CAPACITY FACTOR (USING DER NET)                    0.0         0.0           56.4
: 23. UNIT FORCED OUTAGE RATE                            0.0         0.0           11.9
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6   MONTHS
: 25. IF SHUT DOWN AT END OF REPORT PERIOD,   ESTIMATED DATE OF STARTUP:   11/04/91
 
~0


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point 4 DATE October 7 1991 ,COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990.  
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point     4 DATE October 7 1991
~~
                                    ,COMPLETED BY C. M. Leonard TELEPHONE   305   246-7103 REPORT MONTH   Se tember   1991 Unit 4 was shutdown for a scheduled   Upgrades and Refueling Outage on November 24, 1990.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Se tember 1991 DOCKET NO.50 251 Turke Point&#xb9;4 DATE, October 7 1991,~COMPLETED BY C.M.Leonard TELEPHONE (305)246-7103 No.Date Type Duration (Hours)Reason2 Method of Shutting Down Reactor Licensee Event Report&#xb9;System Code4 Component Codes Cause 8 Corrective Action to PravantRecurrence 10 901124 720 C/H N/A C/SE PuelXX Engine Unit 4 shutdown for a scheduled Upgrades and Refueling Outage.F Forced S Scheduled Reason A-Equipment Failure(Explain)
 
B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error(Explain)
~ ~
H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data EntryScheetsLicensee Event Report(LER)
UNIT SHUTDOWNS AND POWER REDUCTIONS                                 DOCKET NO.         50 251 Turke Point &#xb9;4 DATE, October         7 1991, ~
File (NUREG%161)
COMPLETED BY C. M. Leonard REPORT MONTH      Se tember 1991                            TELEPHONE         (305) 246-7103 Method of Shutting    Licensee                                        Cause 8 Corrective Duration                Down        Event      System  Component                        Action to No. Date       Type (Hours)   Reason2     Reactor     Report&#xb9;     Code4     Codes                     PravantRecurrence 10 901124             720           C/H                 N/A           C/SE   PuelXX         Unit 4 shutdown for a scheduled Engine          Upgrades and Refueling Outage.
Exhibit1-Same Source Ii 0~~I b ,1}}
F Forced             Reason                                              Method                            Exhibit G- Instructions S Scheduled         A - Equipment Failure(Explain)                     1 - Manual                        for Preparation of Data B - Maintenance or Test                             2 - Manual Scram                  EntryScheetsLicensee C - Refueling                                       3 - Automatic Scram                Event Report(LER) File 0 - Regulatory Restriction                         4 - Continued                      (NUREG%161)
E - Operator Training & Ucense Examination         5 - Load Reduction F - Administrative                                 9 - Other (Explain)
G - Operational Error(Explain)                                                         Exhibit1-Same Source H - Other (Explain)
 
0
        ~ ~
Ii      I b
,1}}

Latest revision as of 07:57, 22 October 2019

Monthly Operating Repts for Sept 1991 for Turkey Point,Units 3 & 4.W/911014 Ltr
ML17348B182
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1991
From: Leonard C, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-273, NUDOCS 9110210305
Download: ML17348B182 (18)


Text

ACCELERATED DI UTION DEMONSTTION SYSTEM 4

1'~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9110210305 DOC.DATE: M~~

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and NOTARIZED: NO Light C DOCKET 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION LEONARD,C.M. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o 'ng repts for Sept. 1991 for Turkey Point, Units 3 & 4-.W 11014 tr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL  ! SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/D WREB10 1 1 NRR/DOEA/OEAB 1 1 RE ~ E 1 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

~

P.O. Box 029100, Miami, FL, 33102-9100 POT 14 $ 91 L-91-273 10 CFR 50 '6 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/CML attachments cc: Stewart D. Ebneter,, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9ii02i0305 910930 PDR ADOCK 05000250 R PDR >r>q an FPL Gcoop company I

)

IO r

I l

E.

I'

AVERAGE'AILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER 'LEVEL (MWe-Net) 09/01/91 0 09/02/91 0 09/03/91 0 09/04/91 0 09/05/91 0 09/06/91 0 09/07/91 0 09/08/91 0 09/09/91 0 09/10/91 0 09/11/91 0 09/12/91 0 09/13/91 0 09/14/91 0 09/15/91 0 09/16/91 0 09/17/91 0 09/18/91 0 09/19/91 0 09/20/91 0 09/21/91. 0 09/22/91 0 09/23/91 0 09/24/91 0 09/25/91 0 09/26/91 0 09/27/91 0 09/28/91 0 09/29/91 0 09/30/91 0

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE 305/246/7103 OPERATING STATUS

l. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD:SEPTEMBER 1991
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO'HICH RESTRICTED'F ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 6551 164984.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 60.9 60.9 104534. 1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 0.0 0.0 103055.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121. 8
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 214231642
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 68615991
18. NET ELECTRICAL ENERGY GENERATED (MWH) -9020 -17478 64861040
19. UNIT SERVICE FACTOR 0.0 0.0 62.5
20. UNIT AVAILABILITYFACTOR 0.0 0.0 62.5
21. CAPACITY FACTOR (USING MDC NET) 0.0 0.0 60.2
22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.7
23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/04/91

Ik

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250'NIT Turke Point 3 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 3 was .shutdown on December 12, 1990 for a scheduled Upgrades Outage.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turkey Point ¹3 DATE October 7, 1991 COMPLETED BY C. M. Leonard REPORT MONTH September 1991 TELEPHONE 305 246-7103 Method of Shutting Licensee Cause 8 Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes PreventRecurrence 22 901212 S 720 H N/A EB Engine Unit 3 was shutdown for scheduled Upgrades Outage.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG<161)

E - Operator Training 8 Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

(Ql 0 ~

f

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91 09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91

i~ i~

' )

J

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE 305/246/7103 OPERATING STATUS

l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD:SEPTEMBER 1991
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 655 I 158716. 0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 101186. 4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 0.0 0.0 97567. 1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 205630060
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 65612880
18. NET ELECTRICAL ENERGY GENERATED (MWH) -1881 -9911 62043717
19. UNIT SERVICE FACTOR 0.0 0.0 61.5
20. UNIT AVAILABILITYFACTOR 0.0 0.0 61.5 0.0 0.0 59.8
22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 11.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/04/91

~0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE October 7 1991

,COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990.

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 251 Turke Point ¹4 DATE, October 7 1991, ~

COMPLETED BY C. M. Leonard REPORT MONTH Se tember 1991 TELEPHONE (305) 246-7103 Method of Shutting Licensee Cause 8 Corrective Duration Down Event System Component Action to No. Date Type (Hours) Reason2 Reactor Report¹ Code4 Codes PravantRecurrence 10 901124 720 C/H N/A C/SE PuelXX Unit 4 shutdown for a scheduled Engine Upgrades and Refueling Outage.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report(LER) File 0 - Regulatory Restriction 4 - Continued (NUREG%161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error(Explain) Exhibit1-Same Source H - Other (Explain)

0

~ ~

Ii I b

,1