ML17348B182: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/30/1991 | | issue date = 09/30/1991 | ||
| title = Monthly Operating Repts for Sept 1991 for Turkey Point,Units 3 & 4.W/911014 Ltr | | title = Monthly Operating Repts for Sept 1991 for Turkey Point,Units 3 & 4.W/911014 Ltr | ||
| author name = | | author name = Leonard C, Plunkett T | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ACCELERATED DI UTION DEMONSTTION SYSTEM 4 1'~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9110210305 DOC.DATE: M~~ | {{#Wiki_filter:ACCELERATED DI UTION DEMONSTTION SYSTEM 4 | ||
1'~ | |||
Florida Power&Light Co.PLUNKETT,T.F. | REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION | ACCESSION NBR:9110210305 DOC.DATE: M~~ | ||
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and NOTARIZED: NO Light C DOCKET 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION LEONARD,C.M. Florida Power & Light Co. | |||
PLUNKETT,T.F. Florida Power & Light Co. | |||
RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly o'ng repts for Sept.1991 for Turkey Point, Units 3&4-.W 11014 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL!SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES | Monthly o 'ng repts for Sept. 1991 for Turkey Point, Units 3 & 4-.W 11014 tr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL ! SIZE: | ||
TITLE: Monthly Operating Report (per Tech Specs) | |||
~ | NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/D WREB10 1 1 NRR/DOEA/OEAB 1 1 RE ~ E 1 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D | ||
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/DRP/CML attachments cc: Stewart D.Ebneter,, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9ii02i0305 910930 PDR ADOCK 05000250 R PDR an FPL Gcoop company | D D | ||
IO r I l E.I' AVERAGE'AILY UNIT POWER LEVEL DOCKET NO.50-250 UNIT Turke Point 3 DATE October 7 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER'LEVEL (MWe-Net)09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91.09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91 0 | NOTE TO ALL "RIDS" RECIPIENTS: | ||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14 | |||
~ | |||
P.O. Box 029100, Miami, FL, 33102-9100 POT 14 $ 91 L-91-273 10 CFR 50 '6 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen: | |||
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. | |||
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/CML attachments cc: Stewart D. Ebneter,, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9ii02i0305 910930 PDR ADOCK 05000250 R PDR >r>q an FPL Gcoop company I | |||
) | |||
IO r | |||
I l | |||
E. | |||
I' | |||
AVERAGE'AILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER 'LEVEL (MWe-Net) 09/01/91 0 09/02/91 0 09/03/91 0 09/04/91 0 09/05/91 0 09/06/91 0 09/07/91 0 09/08/91 0 09/09/91 0 09/10/91 0 09/11/91 0 09/12/91 0 09/13/91 0 09/14/91 0 09/15/91 0 09/16/91 0 09/17/91 0 09/18/91 0 09/19/91 0 09/20/91 0 09/21/91. 0 09/22/91 0 09/23/91 0 09/24/91 0 09/25/91 0 09/26/91 0 09/27/91 0 09/28/91 0 09/29/91 0 09/30/91 0 | |||
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE 305/246/7103 OPERATING STATUS | |||
: l. UNIT NAME: TURKEY POINT UNIT 3 | |||
: 2. REPORTING PERIOD:SEPTEMBER 1991 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 693 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO'HICH RESTRICTED'F ANY (NET MWE) | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
MONTHLY -YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 720 6551 164984.6 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 60.9 60.9 104534. 1 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 | |||
: 14. HOURS GENERATOR ON-LINE 0.0 0.0 103055.7 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121. 8 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 214231642 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 68615991 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) -9020 -17478 64861040 | |||
: 19. UNIT SERVICE FACTOR 0.0 0.0 62.5 | |||
: 20. UNIT AVAILABILITYFACTOR 0.0 0.0 62.5 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 0.0 0.0 60.2 | |||
: 22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.7 | |||
: 23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.5 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/04/91 | |||
Ik | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO.50-250'NIT Turke Point 3 DATE October 7 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 3 was.shutdown on December 12, 1990 for a scheduled Upgrades Outage. | OF OPERATING EXPERIENCE DOCKET NO. 50-250'NIT Turke Point 3 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 3 was .shutdown on December 12, 1990 for a scheduled Upgrades Outage. | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | |||
~0 | UNIT NAME Turkey Point ¹3 DATE October 7, 1991 COMPLETED BY C. M. Leonard REPORT MONTH September 1991 TELEPHONE 305 246-7103 Method of Shutting Licensee Cause 8 Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes PreventRecurrence 22 901212 S 720 H N/A EB Engine Unit 3 was shutdown for scheduled Upgrades Outage. | ||
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG<161) | |||
E - Operator Training 8 Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) | |||
G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain) | |||
(Ql 0 ~ | |||
f | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91 09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91 | |||
i~ i~ | |||
' ) | |||
:J | |||
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE 305/246/7103 OPERATING STATUS | |||
: l. UNIT NAME: TURKEY POINT UNIT 4 | |||
: 2. REPORTING PERIOD:SEPTEMBER 1991 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 693 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
MONTHLY -YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 720 655 I 158716. 0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 101186. 4 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6 | |||
: 14. HOURS GENERATOR ON-LINE 0.0 0.0 97567. 1 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 205630060 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 65612880 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) -1881 -9911 62043717 | |||
: 19. UNIT SERVICE FACTOR 0.0 0.0 61.5 | |||
: 20. UNIT AVAILABILITYFACTOR 0.0 0.0 61.5 0.0 0.0 59.8 | |||
: 22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.4 | |||
: 23. UNIT FORCED OUTAGE RATE 0.0 0.0 11.9 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/04/91 | |||
~0 | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point 4 DATE October 7 1991 ,COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990. | OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE October 7 1991 | ||
~~ | ,COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990. | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS | |||
B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative | ~ ~ | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 251 Turke Point ¹4 DATE, October 7 1991, ~ | |||
COMPLETED BY C. M. Leonard REPORT MONTH Se tember 1991 TELEPHONE (305) 246-7103 Method of Shutting Licensee Cause 8 Corrective Duration Down Event System Component Action to No. Date Type (Hours) Reason2 Reactor Report¹ Code4 Codes PravantRecurrence 10 901124 720 C/H N/A C/SE PuelXX Unit 4 shutdown for a scheduled Engine Upgrades and Refueling Outage. | |||
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report(LER) File 0 - Regulatory Restriction 4 - Continued (NUREG%161) | |||
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) | |||
G - Operational Error(Explain) Exhibit1-Same Source H - Other (Explain) | |||
0 | |||
~ ~ | |||
Ii I b | |||
,1}} |
Latest revision as of 07:57, 22 October 2019
ML17348B182 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 09/30/1991 |
From: | Leonard C, Plunkett T FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-91-273, NUDOCS 9110210305 | |
Download: ML17348B182 (18) | |
Text
ACCELERATED DI UTION DEMONSTTION SYSTEM 4
1'~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9110210305 DOC.DATE: M~~
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and NOTARIZED: NO Light C DOCKET 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION LEONARD,C.M. Florida Power & Light Co.
PLUNKETT,T.F. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly o 'ng repts for Sept. 1991 for Turkey Point, Units 3 & 4-.W 11014 tr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL ! SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/D WREB10 1 1 NRR/DOEA/OEAB 1 1 RE ~ E 1 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
~
P.O. Box 029100, Miami, FL, 33102-9100 POT 14 $ 91 L-91-273 10 CFR 50 '6 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/CML attachments cc: Stewart D. Ebneter,, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9ii02i0305 910930 PDR ADOCK 05000250 R PDR >r>q an FPL Gcoop company I
)
IO r
I l
E.
I'
AVERAGE'AILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER 'LEVEL (MWe-Net) 09/01/91 0 09/02/91 0 09/03/91 0 09/04/91 0 09/05/91 0 09/06/91 0 09/07/91 0 09/08/91 0 09/09/91 0 09/10/91 0 09/11/91 0 09/12/91 0 09/13/91 0 09/14/91 0 09/15/91 0 09/16/91 0 09/17/91 0 09/18/91 0 09/19/91 0 09/20/91 0 09/21/91. 0 09/22/91 0 09/23/91 0 09/24/91 0 09/25/91 0 09/26/91 0 09/27/91 0 09/28/91 0 09/29/91 0 09/30/91 0
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE 305/246/7103 OPERATING STATUS
- l. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD:SEPTEMBER 1991
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO'HICH RESTRICTED'F ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 720 6551 164984.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 60.9 60.9 104534. 1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 0.0 0.0 103055.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121. 8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 214231642
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 68615991
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) -9020 -17478 64861040
- 19. UNIT SERVICE FACTOR 0.0 0.0 62.5
- 20. UNIT AVAILABILITYFACTOR 0.0 0.0 62.5
- 21. CAPACITY FACTOR (USING MDC NET) 0.0 0.0 60.2
- 22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.7
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/04/91
Ik
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250'NIT Turke Point 3 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 3 was .shutdown on December 12, 1990 for a scheduled Upgrades Outage.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Turkey Point ¹3 DATE October 7, 1991 COMPLETED BY C. M. Leonard REPORT MONTH September 1991 TELEPHONE 305 246-7103 Method of Shutting Licensee Cause 8 Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes PreventRecurrence 22 901212 S 720 H N/A EB Engine Unit 3 was shutdown for scheduled Upgrades Outage.
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG<161)
E - Operator Training 8 Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)
(Ql 0 ~
f
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91 09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91
i~ i~
' )
- J
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE 305/246/7103 OPERATING STATUS
- l. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD:SEPTEMBER 1991
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 720 655 I 158716. 0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 101186. 4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
- 14. HOURS GENERATOR ON-LINE 0.0 0.0 97567. 1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 205630060
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 65612880
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) -1881 -9911 62043717
- 19. UNIT SERVICE FACTOR 0.0 0.0 61.5
- 20. UNIT AVAILABILITYFACTOR 0.0 0.0 61.5 0.0 0.0 59.8
- 22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.4
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 11.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/04/91
~0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE October 7 1991
,COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990.
~ ~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 251 Turke Point ¹4 DATE, October 7 1991, ~
COMPLETED BY C. M. Leonard REPORT MONTH Se tember 1991 TELEPHONE (305) 246-7103 Method of Shutting Licensee Cause 8 Corrective Duration Down Event System Component Action to No. Date Type (Hours) Reason2 Reactor Report¹ Code4 Codes PravantRecurrence 10 901124 720 C/H N/A C/SE PuelXX Unit 4 shutdown for a scheduled Engine Upgrades and Refueling Outage.
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report(LER) File 0 - Regulatory Restriction 4 - Continued (NUREG%161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error(Explain) Exhibit1-Same Source H - Other (Explain)
0
~ ~
Ii I b
,1