| title = Ack Receipt of 780914 Ltr Informing NRC of Steps Taken to Correct Violations Noted in 780816 Ltr
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in
| author name = Keppler J
| author name = Keppler J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7810110228
| document report number = NUDOCS 7810110228
| title reference date = 09-14-1978
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
Line 25: Line 26:
           $, ,                                                                GLEN E LLYN, ILLINotS 60137 '
           $, ,                                                                GLEN E LLYN, ILLINotS 60137 '
OCT 4        1978-Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President-Engineering Post Office Box 5000 Cleveland, OH 44101 Gentlemen:
OCT 4        1978-Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President-Engineering Post Office Box 5000 Cleveland, OH 44101 Gentlemen:
Thank you for your letter dated September 14, 1978, informing us of the steps you have taken to correct the noncompliance identified in our letter dated August 16, 1978. We will examine your corrective action during a future inspect 1on.
Thank you for your {{letter dated|date=September 14, 1978|text=letter dated September 14, 1978}}, informing us of the steps you have taken to correct the noncompliance identified in our {{letter dated|date=August 16, 1978|text=letter dated August 16, 1978}}. We will examine your corrective action during a future inspect 1on.
Your cooperation with us is appreciated.
Your cooperation with us is appreciated.
Sincerely, hf.
Sincerely, hf.

Latest revision as of 04:17, 12 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in
ML20147B938
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/04/1978
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 7810110228
Download: ML20147B938 (1)


Text

_ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

,A

  1. "U UNITED STATES cd 4

% ,k fs pg NUCLEAR REGULATORY COMMISSION j

in

"',jC . REGloN lit 799 ROOSEVELT ROAD

~

$, , GLEN E LLYN, ILLINotS 60137 '

OCT 4 1978-Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President-Engineering Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

Thank you for your letter dated September 14, 1978, informing us of the steps you have taken to correct the noncompliance identified in our letter dated August 16, 1978. We will examine your corrective action during a future inspect 1on.

Your cooperation with us is appreciated.

Sincerely, hf.

James G. Keppler 1-Director Central Files R.eproduction Unit NRC 20b