ML20196J180: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:64790
| stage = Other
}}
}}


Line 31: Line 33:


==References:==
==References:==
(a) August 15, 1985 letter from M. R. Edelman to B. J. Youngblood (b) NUREG-0887, Supplement 10; Perry SSER 10, page 11-1, September 1986 (c) February 10, 1986 letter from M. R. Edelman to W. D. Butler (d) August 14, 1986 letter from M. R. Edelman to J. G. Keppler (e) February 25, 1987 letter from M. R. Edelman to NRC (f) August 26, 1987 letter from H. R. Edelman to NRC With reference (a) you submitted an Offsite Dose Calculation Manual (ODCM),
(a) {{letter dated|date=August 15, 1985|text=August 15, 1985 letter}} from M. R. Edelman to B. J. Youngblood (b) NUREG-0887, Supplement 10; Perry SSER 10, page 11-1, September 1986 (c) {{letter dated|date=February 10, 1986|text=February 10, 1986 letter}} from M. R. Edelman to W. D. Butler (d) {{letter dated|date=August 14, 1986|text=August 14, 1986 letter}} from M. R. Edelman to J. G. Keppler (e) {{letter dated|date=February 25, 1987|text=February 25, 1987 letter}} from M. R. Edelman to NRC (f) {{letter dated|date=August 26, 1987|text=August 26, 1987 letter}} from H. R. Edelman to NRC With reference (a) you submitted an Offsite Dose Calculation Manual (ODCM),
Revision 1, for the Perry Nuclear Power Plant (Perry). Reference (b) docu-mented the staff's general acceptance of this ODCM. With reference (c) you provided a complete Revision 2 to the Perry ODCM, and have periodically updated this revision witn corrected "Temporary Change" pages that accompany references (d), (e), and (f) (TC-003 through TC-006) in accordance with Perry Technical Specification 6.14.
Revision 1, for the Perry Nuclear Power Plant (Perry). Reference (b) docu-mented the staff's general acceptance of this ODCM. With reference (c) you provided a complete Revision 2 to the Perry ODCM, and have periodically updated this revision witn corrected "Temporary Change" pages that accompany references (d), (e), and (f) (TC-003 through TC-006) in accordance with Perry Technical Specification 6.14.
The staff notes that TC-007 and TC-008 to the Perry 0DCM have also been submitted to the staff; however they were not considered in this review effort and will be the subject of further staff review.
The staff notes that TC-007 and TC-008 to the Perry 0DCM have also been submitted to the staff; however they were not considered in this review effort and will be the subject of further staff review.

Latest revision as of 03:40, 9 December 2021

Suggests That Util Incorporate Stated Changes as Well as Currently Applicable Temporary Change Items Into New Rev 3 to Offsite Dose Calculation Manual (ODCM) & That Future Revs Frequently to Keep Changes Manageable.W/O Encl
ML20196J180
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/09/1988
From: Colburn T
Office of Nuclear Reactor Regulation
To: Kaplin A
CLEVELAND ELECTRIC ILLUMINATING CO.
References
TAC-64790, NUDOCS 8803140176
Download: ML20196J180 (3)


Text

- - - . ..

0 ..

March 9, 1988 -

Docket No. 50-440 , Distribution.

tDocketf1_le. ,,

NRC & Local PDRs PDIII-3 r/f KEPerkins GHolahan Mr. Alvin Kaplin, Vice President PKreutzer Nuclear Group .

TColburn The Cleveland Electric Illuminating OGC-WF-1 Company EJordan 10 Center Road JPartlow Perry, Ohio 44081 ACRS (10)

Gray file

Dear Mr. Kaplin:

SUBJECT:

PERRY NUCLEAR POWER PLANT - ACCEPTANCE OF 0FFSITE DOSE CALCULATION MANUAL, REVISION 2, UPDATED THROUGH TC-006 (TAC NO. 64790)

References:

(a) August 15, 1985 letter from M. R. Edelman to B. J. Youngblood (b) NUREG-0887, Supplement 10; Perry SSER 10, page 11-1, September 1986 (c) February 10, 1986 letter from M. R. Edelman to W. D. Butler (d) August 14, 1986 letter from M. R. Edelman to J. G. Keppler (e) February 25, 1987 letter from M. R. Edelman to NRC (f) August 26, 1987 letter from H. R. Edelman to NRC With reference (a) you submitted an Offsite Dose Calculation Manual (ODCM),

Revision 1, for the Perry Nuclear Power Plant (Perry). Reference (b) docu-mented the staff's general acceptance of this ODCM. With reference (c) you provided a complete Revision 2 to the Perry ODCM, and have periodically updated this revision witn corrected "Temporary Change" pages that accompany references (d), (e), and (f) (TC-003 through TC-006) in accordance with Perry Technical Specification 6.14.

The staff notes that TC-007 and TC-008 to the Perry 0DCM have also been submitted to the staff; however they were not considered in this review effort and will be the subject of further staff review.

8803140176 080309 PDR ADOCK 05000440 P PDR

i l

~ . l Mr. Alvin Kaplan Our contractor, EG&G Idaho, Inc., has conducted a review of Revision 2 of the Perry ODCM through TC-005. Their discussion and coments are contained in tneir Technical Evaluation Report (TER), EGG-PHY-7731 (enclosed). We agree with the contractor that this ODCM uses methods that are, in general, consistent with staff guidelines and is an acceptable reference. However, in the TER there are listed a number of discrepancies and suggestions, some typographical in nature, some substantive. Since these issues involve refinements to a basically sound document, there is no need for inrnediate action. however, the staff requests that you address each of the items identified in the Conclusions section of the TER within 6 months of receipt of this letter with a new revision to the ODCM. While not specifically addressed in the TER, the staff has determined that changes submitted as TC-006 in reference (f) provide acceptable documentation for exchange of milk sampling stations.

The staff notes that the omission of Figures 3.0-1, 5.1-1, 5.1-2, and 5.1-3 from the ODCM reviewed in the TER was an error in the DCS distribution system and these four oversized figures are now available to us. However, the complex, illegible Figure 3.0-1 should be replaced with a simplified block diagram fcr the gaseous radwaste system and discharge pathdays similar to the simple diagram for the liquid raawaste system of Figure 2.1-1.

The staff also feels that the system of "Temporary Changes" to the ODCH can be confusing to the user, particularly when snme pages contain as many as four "Temp Change" stamps and as many as seven different change bars, Since you will be making a number of ODCM changes in response to the items in the TER, it is suggested that you incorporate these new changes as well as all of the currently applicable Temporary Change items into a new Revision 3 of the Perry 00CM, and that future revisior,s to the ODCM occur frequently enough to keep the nunter of Temporary Changes to a reasonably manageable number.

This request for information affects fewer than 10 respondents; therefore, OMB clearance is not required under Pub. L.96-511.

Sincerely, OriginM Signed By:

l

'[

Tinothy G. Colburn, Project Manager Project Directorate III-3 Division of Reactor Projects - III, l IV, V & Special Projects Office of Nuclear Reactor Regulation i

Enclosure:

Technical Evaluation Report cc: See next page 0FFICE: PQJII 3 PDI!!-3 h PDl! -3 SURNAME: PVred,2er TColburn/r1MEPerkins DATE:

03/g/88 03/f/88 03/09/88

-4 6

Mr. Alvin Kaplan Perry Nuclear Power Plant The Cleveland Electric Unit 1 Illuminating Company cc:

Shaw, Pittman, Potts & Trowbridge Mr. James W. Harris, Director 2300 N Street, N.W. Division of Power Generation Washington, D.C. 20037 Ohio Department of Industrial Relations David E. Burke P.O. Box 825 The Cleveland Electric Columbus, Ohio 43216 Illuminating Company P.O. Box 5000 The Honorable Lawrence Logan Cleveland, Ohio 44101 Mayor, Village of Perry 4203 Harper Street Resident Inspector's Office Perry, Ohio 44081 U.S. Nuclear Regulator Comission Parmly at Center Road The Honorable Robert V. Orosz Perry, Ohio 44081 Mayor, Village of North Perry North Perry Village Hall Regional Administrator, Region III 4778 Lockwood Road U.S. Nuclear Regulatory Comission North Perry Village, Ohio 44061 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney Gencral Frank P. Weiss, Esq. 30 East Broad Street Assistant Prosecuting Attorney Columbus, unto 43216 105 Main Street Lake County Administration Center Radiological Health Program Painesville, Ohio 44077 Ohio Department of Health 1224 Kinnear Road Ms. Sue Hiatt Columbus, Ohio 43212 OCRE Interim Representative 8275 Munson Ohio Environmental Protection Mentor, Ohio 44060 Agency 361 East Broad Street Terry J. Lodge, Esq. Columbus, Ohio 43266-0558 618 N. Michigan Street Suite 105 Mr. James R. Secor, Chairman Toledo, Ohio 43624 Perry Township Board of Trustees Box 65 John G. Cardinal, Esq. 4171 Main Street Prosecuting Attorney Perry, Ohio 44081 Ashtabula County Courthouse Jefferson, Ohio 44047 State of Ohio Public Utilities Comission Eileen M. Buzzelli 180 East Broad Street The Clevelano Electric Columbus, Ohio 43266-0573 Illuminating Company P. O. Box 97 E-210 Mr. Murray R. Edelman Perry, Ohio 44081 Centerior Energy 6200 Oaktree Blvd.

! Independence, Ohio 44131 l

.