| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:61707
| stage = Approval
}}
}}


Line 31: Line 33:
Generic Letter 83-28, Item 4.5.3, required confirmation.from all licensees and
Generic Letter 83-28, Item 4.5.3, required confirmation.from all licensees and
           -applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.
           -applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.
By letter dated April 6,1984, you submitted a response to Generic Letter 83-28 Item 4.5.3. Therein you indicated your endorsement of the BWR.0wners Group's Report NECD 30844 as being applicable to the Perry Nuclear Power Plant._ The NRC-staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your response and the BWR Owners Group's report. We conclude that the existing intervals for on-line functional testing atLthe Perry Nuclear Power Plant, Ur.it No.1, are consistent with achieving high reactor trip system availability.
By {{letter dated|date=April 6, 1984|text=letter dated April 6,1984}}, you submitted a response to Generic Letter 83-28 Item 4.5.3. Therein you indicated your endorsement of the BWR.0wners Group's Report NECD 30844 as being applicable to the Perry Nuclear Power Plant._ The NRC-staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your response and the BWR Owners Group's report. We conclude that the existing intervals for on-line functional testing atLthe Perry Nuclear Power Plant, Ur.it No.1, are consistent with achieving high reactor trip system availability.
The enclosed safety evaluation with the attsched contractor's report (EGG-NTA 8341) provides the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, Item 4.5.3, to be complete.
The enclosed safety evaluation with the attsched contractor's report (EGG-NTA 8341) provides the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, Item 4.5.3, to be complete.
This completes all staff activities related to TAC No. 61707.
This completes all staff activities related to TAC No. 61707.

Latest revision as of 07:12, 19 March 2021

Forwards Safety Evaluation Accepting Licensee 840406 Response to Generic Ltr 83-28,Item 4.5.3 Re Confirmation That on-line Functional Testing of Reactor Trip Sys Being Performed at Plant
ML20244D619
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/07/1989
From: Colburn T
Office of Nuclear Reactor Regulation
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20244D620 List:
References
GL-83-28, TAC-61707, NUDOCS 8906190167
Download: ML20244D619 (2)


Text

_____ - ___ -_____-__ _ _

... e,

~~ " -June 7, 1989 Docket No. 50-440 DISTRIBUTION:

i $NRC & Local PDRs PDIII-3r/fPNVirgilio.

JHannon PKreutzer

. TColburn 0GC-WFI Mr. Alvin.Kaplan, Vice President EJordan BGrimes Nuclear Group ACRS(10) PDIII-3 Gray Files The Cleveland Electric Illuminating BMozaftri Company 10 Center Road

. Perry, Ohio 44081

Dear Mr. Kaplan:

SUBJECT:

SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR TRIP RELIABILITY - ON-LINE FUNCTIONAL TESTING 0F THE REACTOR TRIP SYSTEM, PERRY NUCLEAR POWER PLANT, UNIT NO. 1 (TAC NO. 61707)

Generic Letter 83-28, Item 4.5.3, required confirmation.from all licensees and

-applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.

By letter dated April 6,1984, you submitted a response to Generic Letter 83-28 Item 4.5.3. Therein you indicated your endorsement of the BWR.0wners Group's Report NECD 30844 as being applicable to the Perry Nuclear Power Plant._ The NRC-staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your response and the BWR Owners Group's report. We conclude that the existing intervals for on-line functional testing atLthe Perry Nuclear Power Plant, Ur.it No.1, are consistent with achieving high reactor trip system availability.

The enclosed safety evaluation with the attsched contractor's report (EGG-NTA 8341) provides the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, Item 4.5.3, to be complete.

This completes all staff activities related to TAC No. 61707.

Sincerely,

/s/

Timothy G. Colburn, Sr. Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enc 1:

See next page Office: LA/fD"II-3 PN/PDIII-3 PD/PblkI-3 Surname: PKrocher TColburn/tg /Hannon

[8 Date: ([/7/89 (p / 7 /89 g/g/89 I l 8906190167 890607 PDR ADOCK 05000440 P PDC _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

s Mr. Alvin Kaplan Perry Nuclear Power Plant The Cleveland Electric Unit 1 1 Illuminating Company cc: Jay E. S11 berg, Esq. Mr. James W. Harris, Director Shaw, Pittman, Potts & Trowbridge Division of Power Generation 2300 N Street, N.W. Ohio Department of Industrial Washington, D.C. 20037 Relations P. C. Box 825 David E. Burke Columbus, Ohio 43216 The Cleveland Electric Illuminating Company The Honorable Lawrence Logan P.O. Box 5000 Mayor, Village of Perry Cleveland. 0hio 44101 4203 Harper Street Re'sident Inspec' tor's Office U.S. Nuclear Regulatory Comission The Honorable Robert V. Orosz Parmly at Center Road Mayor, Village of North Perry Perry, Ohio 44081 North Perry Village Hall 4778 Lockwood Road Regional Administrator, Region III North Perry Village, Ohio 44081 U.S. Nuclear Regulatory Commission 799 Roosevelt Road Attorney General Glen Ellyn, Illinois 60137 Department of Attorney General 30 East Broad Street Frank P. Weiss, Esq. Columbus, Ohio 43216 Assistant Prosecuting Attorney 105 Main' Street Radiological Health Program Lake County Administration Center Ohio Depart- nt of Health Painesville, Ohio 44077 1224 Kinnear Road Columbus, Ohio 43212 Ms. Sue Hiatt OCRE Interim Representative Ohio Environmental Protection 8275 Munson Agency Mentor, Ohio 44060 361 East Broad Street Columbus Ohio 43266-0558 Terry J. Lodge, Esq.

618 N. Michigan Street Mr. Phillip S. Haskell, Chairman Suite 105 Perry Township Board of Trustees Toledo, Ohio 43624 Box 65 4171 Main Street John G. Cardinal, Esq. Perry, Ohio 44081 Prosecuting Attorney Ashtsbula County Courthouse State of Ohio Jefferson, Ohio 44047 Public Utilities Comission 180 East Broad Street Robert A. Newkirk Columbus, Ohio 43266-0573 Cleveland Electric Illuminating Company Michael D. Lyster Perry Nuclear Power Plant Cleveland Electric P. O. Box 97 E-210 Illuminating Company Perry, Ohio 44081 Perry Nuclear Power Plant P. O. Box 97 SB306 Perry, Ohio 44081