                                                        EP 29 W
            In Reply Refer To:
          Docket: 50-458/88-22
          EA 88-249
          Gulf States Utilities
          ATTN: Mr. James C. Deddens
                    Senior Vice President. (RBNG)
                    Nuclear Licensing
          P. O. Box 220
          St. Francisville, LA 70775
          Gentlemen:
          This refers to the inspection conducted by Messrs. E. J. Ford and W. B. Jones
          of this office during the period August 29 through September 15, 1988, of
          activities authorized by NRC Operating License NPF-47 for River Bend Station,
          and to the discussion of our findings with you and other members of your staff
          at the conclusion of the inspection.
          The area examined during the inspection was a followup on your staff's finding
          that both divisions of the fuel building ventilation charcoal filtration system
          was placed in an inoperable condition. This system is required to be operable
          by the River Bend Station Technical Specifications. Within this area, the
          inspection consisted of selective examination of procedures and representative
          records, interviews with personnel, and observations by the NRC inspectors.
          The inspection findings are documented in the enclosed inspection report.
          As a result of this inspection, it was found that certain of your activities
          appear?d to be in violation of NRC requirements. As discussed in the telephcne
          conversation on September 26, 1988, between Messrs. G. L. Constable and L. A.
          England of your staff, an enforcement conference will be scheduled in our
          Region IV office, to discuss your understanding of these apparent violations,
          the reasons for occurrences, and your corrective actions. We will also discuss
          the enforcement policy, if appropriate.
          The NRC staff is particularly concerned with ti:is event because it appears that
          the corrective actions from a similar event 2 yurs earlier were not completed.
          Had these earlier corrective actions been completed, this event could have been
          avoided. In addition, your licensed operators shuuld have identified thet the
          heater switches were misalligned during control board walk downs.
          *RIV: SRI        *PSC            *C: PSC          *0:DRP
          EFord            GLMadsen        GLConstable      LJCallan
          9/ 27/88        9/27/88          9/ 27/88          9/28/88
          *Previously concurred
                                                                                            'I
            f>S10120199 830929
            PDR    ADOCK 05000458
            O                  PDC
 
                                                                                    1
. ,
'
      .      .
    Gulf States Utilities                    -2-
    Should you have any questions concerning this inspe-tion, we will be pleased to
    discuss them with you.
                                              Sincerely.
                                              Onkinal Sigacd By.
                                                A.B.SEACH
                                              L. J. Callan, Director
                                              Division of Reactor Projects
    Enclosures:
    1. Appendix A - NRC Inspection Report
          50-458/88-22
    2. Appendix B - Meeting Agenda
    cc w/ enclosures:
    Gulf States Utilities
    ATTN: Mr. J. E. Booker, Manager-
              River Bend Oversight
    P. 0 Box 2951
    Beaumont, Texas 77704
    Gulf States Utilities
    ATTN: Mr. Les England Director,
              Nuclear Licensing - RBNG
    P. O. Box 220
    St. Francisville, Louisiana 70775
    Louisiana State University,
      Government Documents Department
    Louisiana Radiation Control Program Director
    bec to DMB (IE01)
    bec distrib. by RIV:
    *DRP                                * Resident Inspector
    R. D. Martin, RA                  *SectionChief(DRP/C)
    *Lisa Shea, RH/ALF                  * MIS System
    RPSB-DRSS                          *RSTS Operator
    * Project Engineer DRP/C            *RIV File
    *W. Paulson, NRR Project Manager    *DRS
    A. B. Beach
    *w/766
}}
}}

Latest revision as of 18:48, 17 December 2020

Forwards Insp Rept 50-458/88-22 on 880829-0915.Violations Noted.Enforcement Conference Will Be Scheduled in Region IV Ofc to Discuss Apparent Violations,Per 880926 Telcon W/ GL Constable & La England
ML20155E240
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/29/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20155E244 List:
References
EA-88-249, NUDOCS 8810120199
Download: ML20155E240 (2)


See also: IR 05000458/1988022

Text

E

.. .

' *

.

..

EP 29 W

In Reply Refer To:

Docket: 50-458/88-22

EA 88-249

Gulf States Utilities

ATTN: Mr. James C. Deddens

Senior Vice President. (RBNG)

Nuclear Licensing

P. O. Box 220

St. Francisville, LA 70775

Gentlemen:

This refers to the inspection conducted by Messrs. E. J. Ford and W. B. Jones

of this office during the period August 29 through September 15, 1988, of

activities authorized by NRC Operating License NPF-47 for River Bend Station,

and to the discussion of our findings with you and other members of your staff

at the conclusion of the inspection.

The area examined during the inspection was a followup on your staff's finding

that both divisions of the fuel building ventilation charcoal filtration system

was placed in an inoperable condition. This system is required to be operable

by the River Bend Station Technical Specifications. Within this area, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

As a result of this inspection, it was found that certain of your activities

appear?d to be in violation of NRC requirements. As discussed in the telephcne

conversation on September 26, 1988, between Messrs. G. L. Constable and L. A.

England of your staff, an enforcement conference will be scheduled in our

Region IV office, to discuss your understanding of these apparent violations,

the reasons for occurrences, and your corrective actions. We will also discuss

the enforcement policy, if appropriate.

The NRC staff is particularly concerned with ti:is event because it appears that

the corrective actions from a similar event 2 yurs earlier were not completed.

Had these earlier corrective actions been completed, this event could have been

avoided. In addition, your licensed operators shuuld have identified thet the

heater switches were misalligned during control board walk downs.

EFord GLMadsen GLConstable LJCallan

9/ 27/88 9/27/88 9/ 27/88 9/28/88

  • Previously concurred

'I

f>S10120199 830929

PDR ADOCK 05000458

O PDC

1

. ,

'

. .

Gulf States Utilities -2-

Should you have any questions concerning this inspe-tion, we will be pleased to

discuss them with you.

Sincerely.

Onkinal Sigacd By.

A.B.SEACH

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - NRC Inspection Report

50-458/88-22

2. Appendix B - Meeting Agenda

cc w/ enclosures:

Gulf States Utilities

ATTN: Mr. J. E. Booker, Manager-

River Bend Oversight

P. 0 Box 2951

Beaumont, Texas 77704

Gulf States Utilities

ATTN: Mr. Les England Director,

Nuclear Licensing - RBNG

P. O. Box 220

St. Francisville, Louisiana 70775

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • DRP * Resident Inspector

R. D. Martin, RA *SectionChief(DRP/C)

  • Lisa Shea, RH/ALF * MIS System

RPSB-DRSS *RSTS Operator

  • Project Engineer DRP/C *RIV File
  • W. Paulson, NRR Project Manager *DRS

A. B. Beach

  • w/766