In Reply Refer To:
Docket: 50-458/88-22
EA 88-249
Gulf States Utilities
ATTN: Mr. James C. Deddens
Senior Vice President. (RBNG)
Nuclear Licensing
P. O. Box 220
St. Francisville, LA 70775
Gentlemen:
This refers to the inspection conducted by Messrs. E. J. Ford and W. B. Jones
of this office during the period August 29 through September 15, 1988, of
activities authorized by NRC Operating License NPF-47 for River Bend Station,
and to the discussion of our findings with you and other members of your staff
at the conclusion of the inspection.
The area examined during the inspection was a followup on your staff's finding
that both divisions of the fuel building ventilation charcoal filtration system
was placed in an inoperable condition. This system is required to be operable
by the River Bend Station Technical Specifications. Within this area, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspectors.
The inspection findings are documented in the enclosed inspection report.
As a result of this inspection, it was found that certain of your activities
appear?d to be in violation of NRC requirements. As discussed in the telephcne
conversation on September 26, 1988, between Messrs. G. L. Constable and L. A.
England of your staff, an enforcement conference will be scheduled in our
Region IV office, to discuss your understanding of these apparent violations,
the reasons for occurrences, and your corrective actions. We will also discuss
the enforcement policy, if appropriate.
The NRC staff is particularly concerned with ti:is event because it appears that
the corrective actions from a similar event 2 yurs earlier were not completed.
Had these earlier corrective actions been completed, this event could have been
avoided.
In addition, your licensed operators shuuld have identified thet the
heater switches were misalligned during control board walk downs.
- RIV: SRI
- PSC
- C: PSC
- 0:DRP
EFord
GLMadsen
GLConstable
LJCallan
9/ 27/88
9/27/88
9/ 27/88
9/28/88
- Previously concurred
'I
f>S10120199 830929
ADOCK 05000458
O
1
.
,
'
.
.
Gulf States Utilities
-2-
Should you have any questions concerning this inspe-tion, we will be pleased to
discuss them with you.
Sincerely.
Onkinal Sigacd By.
A.B.SEACH
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - NRC Inspection Report
50-458/88-22
2.
Appendix B - Meeting Agenda
cc w/ enclosures:
Gulf States Utilities
ATTN: Mr. J. E. Booker, Manager-
River Bend Oversight
P. 0 Box 2951
Beaumont, Texas 77704
Gulf States Utilities
ATTN: Mr. Les England Director,
Nuclear Licensing - RBNG
P. O. Box 220
St. Francisville, Louisiana 70775
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- DRP
- Resident Inspector
R. D. Martin, RA
- SectionChief(DRP/C)
- Lisa Shea, RH/ALF
- MIS System
RPSB-DRSS
- RSTS Operator
- Project Engineer DRP/C
- RIV File
- W. Paulson, NRR Project Manager
- DRS
A. B. Beach
- w/766