05000416/LER-1982-105, Forwards Updated LER 82-105/01X-1: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[05000416/LER-1982-105]]
{{Adams
| number = ML20073D362
| issue date = 04/07/1983
| title = Forwards Updated LER 82-105/01X-1
| author name = Mcgaughy J
| author affiliation = MISSISSIPPI POWER & LIGHT CO.
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000416
| license number =
| contact person =
| document report number = AECM-83-0141, AECM-83-141, NUDOCS 8304130452
| package number = ML20073D364
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
}}
{{LER
| Title = Forwards Updated LER 82-105/01X-1
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000416
| LER year = 2082
| LER number = 105
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:.    .
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 1640. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 April 7, 1983 u)
JAMES P. McGAUGHY. JR                                                              y              ,,
vecs passesseer
                                                                                            -o        1.,  g A
Office of Inspection & Enforcement                                            --
                                                                                                      '.{
7 ,,,
U. S. Nuclear Regulatory Commission                                                            J.
Region II                                                                      p                ?
101 Marietta St., N.W.,    Suite 3100                                        m                  ~
Atlanta, Georgia 30303                                                          -
                                                                                                .c.-          ~
Attention:      Mr. J. P. O'Reilly, Regional Administrator                        C
                                                                                                                    ~
 
==Dear Mr. O'Reilly:==
 
==SUBJECT:==
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Update Report - FSAR Accident Analysis Utilization of a Non-Existing P] ant Condition LER 82-105/01 X-1 AECM-83/0141 This letter submits an update to a previous report submitted on November 24, 1982. The event for which the report was submitted occurred on November 10, 1982, after initial review of a design change request it was determined that the present design constituted an event reportable under Technical Specification 6.9.1.12.h.        In the request, the architect engineer requested a design change to allow at least 5 seconds of steam bypass following a turbine trip upon loss of the main circulating water pumps. According to the request, incorporation of the proposed change would satisfy a General Electric assumption in Chapter 15 of the Final Safety Analysis Report that the steam line bypass be open for at least 5 seconds following a turbine trip during loss of condenser vacuum transient.
After a detailed review of the design change request it has been determined that the proposed desdgn change is not necessary. Attached is LER 82-105/01 X-1, which is a final report.
Yours truly, O
JPM: sap Attachment g g,4Q                yg,                            -
cc:      (See Next Page) 8304130452 830407                                                                      -
PDR ADOCK 05000416                                                                    Uk1CIALCU  -
                                                                                                              ~
S                          PDR                                                        #
Member Middle South Utilities System              M                      b
 
  ,  3
[                                                                                                        ,
1 AECM-83/0141 MISSI'21PPI POWER O LI2HT COMPANY                          Paga 2 1
I
            . cc: Mr. N. L. Stampley (w/a) l                  Mr. R. B. McGehee (w/o)
;                  Mr. T. B. Conner (w/o)
Mr. G. B. Taylor (w/o)
Mr. Richard C. DeYoung, Director (w/a)
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington,    D.' C. 20555 Document Control Desk (w/a)
U. S. Nuclear Regulatory Commission Washington, D. C. 20555                                                                                -
4 i
L.
i n
T 4
                                                                                                    ?
s 4
e
          '-          ~                    **        vy u -+-  -, . ..,e,, . y-, , , , , ,      . , , , , . ,,    %
}}
 
{{LER-Nav}}

Latest revision as of 01:05, 18 November 2020

Forwards Updated LER 82-105/01X-1
ML20073D362
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/07/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20073D364 List:
References
AECM-83-0141, AECM-83-141, NUDOCS 8304130452
Download: ML20073D362 (2)


LER-2082-105, Forwards Updated LER 82-105/01X-1
Event date:
Report date:
4162082105R00 - NRC Website

text

. .

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 1640. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 April 7, 1983 u)

JAMES P. McGAUGHY. JR y ,,

vecs passesseer

-o 1., g A

Office of Inspection & Enforcement --

'.{

7 ,,,

U. S. Nuclear Regulatory Commission J.

Region II p  ?

101 Marietta St., N.W., Suite 3100 m ~

Atlanta, Georgia 30303 -

.c.- ~

Attention: Mr. J. P. O'Reilly, Regional Administrator C

~

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Update Report - FSAR Accident Analysis Utilization of a Non-Existing P] ant Condition LER 82-105/01 X-1 AECM-83/0141 This letter submits an update to a previous report submitted on November 24, 1982. The event for which the report was submitted occurred on November 10, 1982, after initial review of a design change request it was determined that the present design constituted an event reportable under Technical Specification 6.9.1.12.h. In the request, the architect engineer requested a design change to allow at least 5 seconds of steam bypass following a turbine trip upon loss of the main circulating water pumps. According to the request, incorporation of the proposed change would satisfy a General Electric assumption in Chapter 15 of the Final Safety Analysis Report that the steam line bypass be open for at least 5 seconds following a turbine trip during loss of condenser vacuum transient.

After a detailed review of the design change request it has been determined that the proposed desdgn change is not necessary. Attached is LER 82-105/01 X-1, which is a final report.

Yours truly, O

JPM: sap Attachment g g,4Q yg, -

cc: (See Next Page) 8304130452 830407 -

PDR ADOCK 05000416 Uk1CIALCU -

~

S PDR #

Member Middle South Utilities System M b

, 3

[ ,

1 AECM-83/0141 MISSI'21PPI POWER O LI2HT COMPANY Paga 2 1

I

. cc: Mr. N. L. Stampley (w/a) l Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.' C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 -

4 i

L.

i n

T 4

?

s 4

e

'- ~ ** vy u -+- -, . ..,e,, . y-, , , , , , . , , , , . ,,  %