05000416/LER-1982-005, Forwards LER 82-005/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-005/01T-0
ML20071K601
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/21/1982
From: Stampley N
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071K605 List:
References
AECM-82-326, NUDOCS 8208020140
Download: ML20071K601 (1)


LER-1982-005, Forwards LER 82-005/01T-0
Event date:
Report date:
4161982005R00 - NRC Website

text

fV b_

e Pb MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi BO 16 4 0, J AC K S O N, MIS SIS SIP PI 3 9 2 05 P. O.g ! gD EulMdhhildd5

'S s 3 d'jl 22 July 21, 1982 NORRIS L. STAMPLEY SENIOR viCE PRESIDENT Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 Refueling Platform Trip Switches Reference: LER 82-005/01 T-0 File 0260/L-835.0 AECM-82/326 On July 9,1982, Grand Gulf Unit 1 experienced the failure of automatic interlocks to stop the refueling platform's approach to the core. Manual stopping was required. This event is reportable based on Grand Gulf Nuclear Station Technical Specification 6.9.1.12e.

Attached is LER 82-005/01 T-0 with supplementary information.

Yourstruly)

/

$l

{l5 6 g

//

l NLS:1m Attachment

/'

cc:

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/a)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Document Control Desk (w/a) l U.S. Nuclear Regulatory Commission l

Washington, D.C.

20555

@208020140 920721

- N*

CN P,DR ADOCK 05000416 6

~ ~ ~ ~ ~

~'

o PDR AEIN7 I E M~'

Member Middle South Utilities System