05000416/LER-1982-029, Forwards LER 82-029/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-029/03L-0
ML20063J143
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/26/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20063J146 List:
References
AECM-82-364, NUDOCS 8209020303
Download: ML20063J143 (1)


LER-2082-029, Forwards LER 82-029/03L-0
Event date:
Report date:
4162082029R00 - NRC Website

text

. ,

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi K IIE IE E 2m P. O. B OX 1640. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 Tsfs$$$cYNs70Ij" August 26, 1982 Office of Inspection & Enforcement g U. S. Nuclear Regulatory Commission ,

Region II ,

101 Marietta St. , N.W., Suite 3100 .

Atlanta, Georgia 30303 3 Attention: Mr. J. P. O'Reilly, Regional Administrator Dear Mr. O'Reilly

SUBJECT:

Grand Gulf Nuclear Station Unit 1 -

Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Radgas Monitoring Pump Repairs

Reference:

LER 82-029/03 L-0 AECM-82/364 On July 29, 1982, a Limiting Condition for Operation was entered based on inoperability of a fuel handling area ventilation radiation monitoring sampling (BI) pump. An erroneous work order resulted in replacement of the wrong pump (B2). Attached is LER 82-029/03 L-0.

Yours truly,

/

JPM:ac J 9 n G a M ris Attachment cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8209020303 820826 DR ADOCK 05000 ,

gp ;

Member Middle South Utilities System g g_ fl.__,