05000416/LER-1982-013, Forwards LER 82-013/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-013/03L-0
ML20058J043
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/04/1982
From: Stampley N
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20058J046 List:
References
AECM-82-450, NUDOCS 8208090147
Download: ML20058J043 (1)


LER-2082-013, Forwards LER 82-013/03L-0
Event date:
Report date:
4162082013R00 - NRC Website

text

- __ _ _ - ________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.- t MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EmihhiMildd5 P. O. B O X 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 August 4, 1982 NORRIS L STAMPLEY 5ENIOR VICE PREstDENT Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission p Region II _. 3 101 Marietta St., N.W., Suite 3100 4 .0 Atlanta, Georgia 30303 -

O

'c '.n A Attention: Mr. J. P. O'Reilly, Regional Administrator ,o h

& 5

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station d ,

Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 ECCS Actuation Instrumentation Channel Failure

Reference:

LER 82-013/03 L-0 AECM-82/450 On July 7, 1982, during a monthly functional test, it was determined that the ECCS actuation instrumentation chat.nel had failed.

Attached is LER 82-013/03 L-0.

Yours truly,A i NLS:Im Attachment cc: Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Document Control Desk (w/a)

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 t UFMCbb Ci2dN,

'~

8208090147 820804 PDR ADOCK 05000416 S PDR g ""') p AEIN7 Member Middle South Utilities System

.___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .