05000416/LER-1982-016, Forwards LER 82-016/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-016/03L-0
ML20062J941
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/06/1982
From: Stampley N
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20062J947 List:
References
AECM-82-456, NUDOCS 8208160506
Download: ML20062J941 (1)


LER-2082-016, Forwards LER 82-016/03L-0
Event date:
Report date:
4162082016R00 - NRC Website

text

9 \

e MISSISSIPPI POWER & LIGHT bOMPANY

  • Helping Build Mississippi P. O. SSIS B O X 16 4 0, J A C K S~O N, M)nc , ,S I P P I 3 9 2 0 5 August 6, 1982 a ve. 02 NoRRIS L. STAMPLEY SE N OH VCE WEseDE NT Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Inadequate Review / Approval of Reportable Occurrences

Reference:

LER 82-016/03 L-0 AECM-82/456 On July 2, 1982, during surveillance testing, an instrument channel was determined to be out of required tolerances. Required reviews and approvals of the surveillance test report were made without recognition by reviewers of the out of tolerance condition. Subsequent notification of the Shift Supervisor of the finding that the channel had failed was not made uutil July 7, 1982. Attached is LER 82-016/03 L-0 with supplementary information.

Yours trul ,

f) l NLS:lm r M)

Attachment cc: Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Document Control Desk (w/a)

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 8208160506 820806 PDR S

ADOCK 05000416 PDR OFFICIALCON AEINI Member Middle South Utilities System