05000416/LER-1982-012, Forwards LER 82-012/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-012/01T-0
ML20058J113
Person / Time
Site: Grand Gulf 
Issue date: 08/04/1982
From: Stampley N
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20058J117 List:
References
AECM-82-449, NUDOCS 8208090169
Download: ML20058J113 (1)


LER-1982-012, Forwards LER 82-012/01T-0
Event date:
Report date:
4161982012R00 - NRC Website

text

~.

e

a:

MISSISSIPPI POWER & LIGHT COMNA'NY Helping Build Mississippi P. O.

B O X 164 0, J AC K S O N. MIS SIS SIP PI 3 9 2 0 5 i:,5 P 2, y August 4, 1982 NoRRIS L. STAMPLEY SE MON VICE $4*f $sDE NT Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W.,

Suite 3100 Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Recording of Radgas Effluent Sampler Flow Rates

Reference:

LER-82-012/01 T-0 AECM-82/449 On July 22, 1982, a procedural inadequacy was discovered in the Daily Operat.ing Log.

Radioactive gaseous effluent sampler flow rates were not being recorded daily as required by Technical Specificat. ions.

Attached is LER 82-012/01 T-0 with supplementary information.

Yours trul f

\\

{

NLS:Im Attachment cc:

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Document Control Desk (w/a)

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 8208090169 820804 PDR ADOCK 05000416 S

,i lilcIAL COPL PDR AEIN4 [5 N Member Middle South Utilities System