05000416/LER-1982-046, Forwards LER 82-046/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-046/03L-0
ML20063M838
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/08/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20063M839 List:
References
AECM-82-393, NUDOCS 8209160176
Download: ML20063M838 (1)


LER-2082-046, Forwards LER 82-046/03L-0
Event date:
Report date:
4162082046R00 - NRC Website

text

-

r -,

- ,f- f^

/ MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 164 0, J AC K S O N, MIS SIS SIP PI 3 9 2 05 September 8, 1982

  1. 5s[UI.,$c?Ms$f Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 (

Atlanta, Georgia 30303 c,a N

Attention: Mr. J. P. O'Reilly, Regional Administrator ~q t .- a

[

co JU

Dear Mr. O'Reilly:

pro

SUBJECT:

Grand Gulf Nuclear Station o ' '73 Unit 1 ---.

[l~)- -

Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 cs 4

<: ^

h, Failure to Perform Fire Door Chcks e

Reference:

LER 82-046/03 L-0 AECM-82/393 .

On August 10, 1982 it was determined that fire door checks required under a Limiting Condition for Operation were not correctly performed.

Attached is LER 82-046/03 L-0 with supplementary information.

Yours truly,

[ p ]

l '-

JPM:ac Attachment

(

cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washinton, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8209160176 820908 gcibl' god PDR ADOCK 05000416 -

S PDR j,,

Member Middle South Utilities System 4g

_ - - - _ _ _ _ --