Forwards Updated LER 82-105/01X-1
ML20073D362
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/07/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20073D364 List:
References
AECM-83-0141, AECM-83-141, NUDOCS 8304130452
Download: ML20073D362 (2)


LER-2082-105, Forwards Updated LER 82-105/01X-1
Event date:
Report date:
4162082105R00 - NRC Website

text

. .

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 1640. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 April 7, 1983 u)

JAMES P. McGAUGHY. JR y ,,

vecs passesseer

-o 1., g A

Office of Inspection & Enforcement --

'.{

7 ,,,

U. S. Nuclear Regulatory Commission J.

Region II p  ?

101 Marietta St., N.W., Suite 3100 m ~

Atlanta, Georgia 30303 -

.c.- ~

Attention: Mr. J. P. O'Reilly, Regional Administrator C

~

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Update Report - FSAR Accident Analysis Utilization of a Non-Existing P] ant Condition LER 82-105/01 X-1 AECM-83/0141 This letter submits an update to a previous report submitted on November 24, 1982. The event for which the report was submitted occurred on November 10, 1982, after initial review of a design change request it was determined that the present design constituted an event reportable under Technical Specification 6.9.1.12.h. In the request, the architect engineer requested a design change to allow at least 5 seconds of steam bypass following a turbine trip upon loss of the main circulating water pumps. According to the request, incorporation of the proposed change would satisfy a General Electric assumption in Chapter 15 of the Final Safety Analysis Report that the steam line bypass be open for at least 5 seconds following a turbine trip during loss of condenser vacuum transient.

After a detailed review of the design change request it has been determined that the proposed desdgn change is not necessary. Attached is LER 82-105/01 X-1, which is a final report.

Yours truly, O

JPM: sap Attachment g g,4Q yg, -

cc: (See Next Page) 8304130452 830407 -

PDR ADOCK 05000416 Uk1CIALCU -

~

S PDR #

Member Middle South Utilities System M b

, 3

[ ,

1 AECM-83/0141 MISSI'21PPI POWER O LI2HT COMPANY Paga 2 1

I

. cc: Mr. N. L. Stampley (w/a) l Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.' C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 -

4 i

L.

i n

T 4

?

s 4

e

'- ~ ** vy u -+- -, . ..,e,, . y-, , , , , , . , , , , . ,,  %