{{#Wiki_filter:y              ,
{{#Wiki_filter:}}
                                                                                                                    ~
7ep;! *
* 9 Pr~'ENTERGY                                                                    E75 ''*"" "" '"''
kena L A N0(C ~                    '
Te4 504 739 6774-R. F. Burski tauxe.
UkJ Yif ?Ob?f wwwa                                :
W3F1-94-0045 A4.05 PR April 13, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 9
 
==Subject:==
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report a
Gentlemen:
* Attached is.the subject monthly report which covers the operating                                  ;;
statistics for the month of March,1994. This report is' submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications-for Facility                              '
Operating License No. NPF-38.                                                                        O t.
Very truly yours,                                                                                      -
R.F. Burski
                  -Director Nuclear Safety                                                                                        ;
RF8/CJT/ssf
                  . Attachment                                                                                            ,
cc:              L.'J.. Callan, (NRC Region IV), R.B. Mc'Gehee,                                      ,
N.S. Reynolds, F. Yost-(Utility Data Institute, Inc;),                              ;
J.T..Wheelock (INP0 Records Center),'NRC Resident:
Inspectors Office                                                            '7'l +1
                '9404150114 940331- --      2                                                          -
p eq DR. ADOCK'0500 quvuyg                                                                                      V          -
        -                      -        .                                ~        _.              .          ,
 
  ;..        r 4
NRC MONTHLY OPERATING REPORT
 
==SUMMARY==
OF OPERATIONS WATERFORD 3 MARCH 1994 The unit operated at an average reactor power of 12.6% and shutdown for Refuel Outage 6 during the period.
L ..    -i_. .
 
      ,;            2.-
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of March 1994, there were no pressurizer safety valve failures or challenges, I
1.
L:
g
 
c., .
                                                                                                                        .y
                                                                                                                        ')
OPERATING DATA REPORT                                              .l
                        .                                                                                              o DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY:      T.S. BECKER TELEPHONE: 504-7394683 OPERATING SIATUS
: 1.      Reporting Period: March,1994 Gross Hours in Reporting Pericc. .Z43_
: 2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104                                                            1
: 3.      Power Level to which Restricted (if any) (Net MWe): N/A                                            C
: 4. Reasons for Restriction (if any): N/A
:l THIS MONTH        YR TO DATE          CUMULATIVE 5,  Number of Hours Reactor was Critical 95.4            1,511.4          62,611.4 3
: 6. Reactor Reserve Shutdown Hours                        -                                    .
: 7. Hours Generator was On-line                        95.3            1,511.3          61,799.5
: 8. Unit Peserve Shutdown Hours                                                                                                                                                                                  .;
: 9. Gross Thermal Energy Generated (MWH)                                  318.321          5,109,327        204.137,804
: 10. Gross Electrical Energy Generated (MWH)                                  104,350          1,672,060        68,092,840
: 11. Not Electrical Energy                                                                                      ,
Generated (MWH) .                                91,760          1,593,593        64,904,038
,          12. Reactor Service Factor                                  12.8'              70.0              83.9          i i
: 13. Reactor Availability Factor                            12.8                70.0              83.9 1
: 14. Unit Service Factor                                    12.8                70.0              82.8'      U
.          15. Unit Availability Factor                              12.8                70.0              82.8 i
: 16. Unit Capacity Factor (using MDC)                      11.5                68.7              80.9
: 17. Unit Capacity Factor (Using DER)                      11.2                66.9              78.7
: 18. Unit Forced Outage Rate                                                                3.4
 
b-4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY:        T.S. BECKER
                                                                                . TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Can't)
: 19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):
: 20. If Shutdown at end of report period, estimated date of startup: April 18,1994
: 21. Unit in Commercial Operation THIS MONTH            YR TO DATE          CUMULATIVE
: 22. Hours in Reporting Period                          743.0                  2159.0          74,664.0
: 23. Unit Forced Outage Hours                              0.0                    00            2,178.7
: 24. Nameplate Rating (Gross MWe): 1200
: 25. If Changes Occur in Capacity Ratings (items Number 2 and 24) Since Last Report, Give Reasons: N/A I
 
i..
    .., ..;?,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: . T.S. BECKER TELEPHONE: 504-739-6683 MONTH JAARCH.1994 DAY AVERAGE DAILY POWER LEVEL                            DAY AVERAGE DAILY POWER LEVEL (MWe-NET)                                              (MWe-NET) 1    1055                                              17    (6) 1 2    1053                                              18    (5) 3    1054                                              19    (5)                                  '
4      980                                              20    (11) 5      (36)                                              21    (9) 6      (21)                                              22    (8) 7      (22)                                              23    (9) l 8      (14)                                              24    (12) 9      (14)                                              25    (12) 10    (12)                                              26    (12) 11    (13)                                              27    (12)                                    -l 12    (13)                                              28    (6) 13    (12)                                              29  _ 8)
(
14 J13)                                                  30    (10) 15    (11)                                              31    (9)                                        l 16      (6)
                                                                                                                        -l INSTRUCTIONS On this format, list the average daily unit power level in MWts-Net fcr each day in the reporting month.
Compute to the nearest whole megawatt.
 
4                                                                                                                                                              g -            'g UNIT SHUTDOWNS AND POWER REDUCTIONS                                                          . .
DOCKET NUMBER- 50-382                  ,
UNIT NAME- WATERFORD 3 DATE OF REPORT: APRIL,1994              -
COMPLETED BY: T.S. BECKER                -
TELEPHONE- 504-739-6683 REPORT FOR MARCH.1994 Type                                      Method of Shutting F = Forced      Duration                  Down the Reactor or-  Cause. Comments and Number        Data          S = Schedufed (Hours)          Reason (1) Reducino Power (2)    Corrective Actions 94-01          940304            S          647.7              C              2              Unit removed from service to begin Refuel Outage 6.
(1) REASON                              .
(2) METHOD A=      Equipment Failure (explain)              1=      Manual B=      Maintenance or Test                      2=      Manual Scram C=      Refueling                                3=      Automatic Scram D=    Regulatory Restriction -                  4=      Continuation from Previous Period E=    Operator Training and                      5=      Power Reduction License Examination                        6=      Other(explain)
F=    Administrative G=    Operational Enor (explain)
H=    Other(explain) l l
_ _ _ _ _ _ _ _ _ _  m __ __ _ _    .m.    ~                .                                          *              .          _                        ___________m~ -    -}}

Revision as of 23:54, 30 March 2020

Monthly Operating Rept for Mar 1994 for Waterford 3.W/940413 Ltr
ML20065H686
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/31/1994
From: Becker T, Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-94-0045, W3F1-94-45, NUDOCS 9404150114
Download: ML20065H686 (7)


Text