ML17349A409: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:WCCZCEa~rzo or~raram.rOx ozrvrOr Wa.xerox s YSrzrvr REGULAT~INFORMATION DISTRIBUTION~STEM (RIDS)ACCESSION NBR:9210190280 DOC.DATE: 92/09/30 NOTARIZED:
{{#Wiki_filter:WCCZCEa~rzo               or~raram.rOx ozrvrOr Wa.xerox s YSrzrvr REGULAT~       INFORMATION DISTRIBUTION~STEM (RIDS)
NO DOCKET FACIL?50-250 Turkey Point Plant", Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION GOLDIE,M.E.
ACCESSION NBR:9210190280             DOC.DATE:   92/09/30   NOTARIZED: NO         DOCKET FACIL?50-250 Turkey Point Plant", Unit 3, Florida Power and             Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and             Light C 05000251 AUTH. NAME           AUTHOR AFFILIATION GOLDIE,M.E.         Florida Power & Light Co.
Florida Power&Light Co.PLUNKETT,T.F.
PLUNKETT,T.F.       Florida Power a Light Co.
Florida Power a Light Co.RECIP.NAME RECIPIENT AFFILIATION
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Sept 1992 for Turkey Point Units 1 a 2.W/921012 ltr.*-*-*---:*.~-*---*-:-r--z*-: TITLE: Monthly Operating Report (per Tech Specs)NOTES:NRR RAGHAVAN,L NRR RAGHAVANiL S 05000250 05000251/RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R INTERNAL: AEOD/DOA Q/DLPQ/LPEB10 REG FI Ol COPIES LTTR ENCL 3.3 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 EXTERNAL: EGSG BRYCEgJ.H NSIC NOTES: 1 1 1 1 1 1 NRC PDR 1 1 NOTE TO ALL'IDS" RECIPIENTS:
Monthly operating repts           for Sept 1992   for Turkey Point Units 1 a   2.W/921012     ltr.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK.ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15  
TITLE: Monthly Operating
                          * . ~   - *- --*- :- r -- z Report (per Tech Specs)
S NOTES:NRR RAGHAVAN,L                                                               05000250 NRR RAGHAVANiL                                                             05000251 /
RECIPIENT            COPIES            RECIPIENT         COPIES ID CODE/NAME            LTTR ENCL        ID CODE/NAME     LTTR ENCL PD2-2 LA                   3. 3    PD2-2 PD              1    1 AULUCK,R                   1    1 INTERNAL: AEOD/DOA                     1    1      AEOD/DSP/TPAB        1    1 Q/DLPQ/LPEB10             1     1     NRR/DOEA/OEAB         1     1 REG  FI        Ol        1     1     RGN2                  1     1 EXTERNAL: EGSG BRYCEgJ.H               1     1     NRC PDR              1     1 NSIC                      1     1 NOTES:                                  1     1 NOTE TO   ALL'IDS"RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               15   ENCL   15


..Box 029100, Miami, FL, 33102-9100 00T 12 1992 L-92-289 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
                                                    .. Box 029100, Miami, FL, 33102-9100 00T 12       1992 L-92-289 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:     Document         Control Desk Washington, D. C.                 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Ross C.Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant-qzQeSQ ADocl pDR" 1Qj9Q28Q OgOOOPgQ pgR an FPL Group company ZEQW b
RE:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE October 5 1992 COMPLETED BY M.E.Goldie TELEPHONE 305 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net)9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92
Very   truly     yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc:   Stewart D. Ebneter, Regional Administrator, Region         II,     USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant
"              qzQeSQ 1Qj9Q28Q OgOOOPgQ ADocl             pDR pgR an FPL Group company                                             ZEQW


OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 10/6/92 COMPLETED BY M.E.GOLDIE TELEPHONE 305/246/6089 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: SEPTEMBER 1992 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED.
b AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke  Point  3 DATE October  5  1992 COMPLETED BY M.E. Goldie TELEPHONE  305  246-6089 MONTH Se  tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92
IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATEO (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 3 REFUELING OUTAGE-STARTED 10/01/92 720 0.0 0.0 0.0 0.0 0 0-2575 0.0 0.0 0.0 0.0 100.0 6575 5298.7 0.0 5281.6 0.0 10152700 3236870 3060583 80.3 80.3 69.9 67.2 17.2 173768.6 112024.0 844.4 110493.'I 121.8 228722766 73255256 69253669 63.6 63.7 60.9 57.5 12.6 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ll/22/92  
 
OPERATING DATA REPORT DOCKET NO           50 250 DATE               10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE       305/246/6089 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT     UNIT 3
: 2. REPORTING PERIOD: SEPTEMBER 1992
: 3. LICENSED THERMAL POWER (MWT):                   2200
: 4. NAMEPLATE RATING (GROSS MWE):                     760
: 5. DESIGN ELECTRICAL RATING (NET MWE):               693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS     NUMBER 3 THROUGH   7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                          720      6575          173768. 6
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                 0.0    5298.7        112024.0
: 13. REACTOR RESERVE SHUTDOWN HOURS                       0.0        0.0          844.4
: 14. HOURS GENERATOR ON-LINE                             0.0    5281. 6      110493.'I
: 15. UNIT RESERVE SHUTDOWN HOURS                         0.0        0.0          121.8
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                   0  10152700      228722766
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)               0  3236870      73255256
: 18. NET ELECTRICAL ENERGY GENERATEO (MWH)             -2575    3060583      69253669
: 19. UNIT SERVICE FACTOR                                 0.0      80.3            63.6
: 20. UNIT AVAILABILITYFACTOR                              0.0      80.3            63.7
: 21. CAPACITY FACTOR (USING MDC NET)                     0.0      69.9            60.9
: 22. CAPACITY FACTOR (USING DER NET)                     0.0      67.2            57.5
: 23. UNIT FORCED OUTAGE RATE                           100.0      17.2            12.6
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6   MONTHS UNIT 3 REFUELING OUTAGE - STARTED 10/01/92
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD,   ESTIMATED DATE OF STARTUP:     ll/22/92


==SUMMARY==
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke Point Unit 3 DATE October 12 1992 COMPLETED BY:M.E.Goldie TELEPHONE:
OP OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke   Point Unit 3 DATE October 12   1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305   246-6089 REPORT MONTH Se tember 1992 Unit 3 did not operate in the month of September due to re-covery operations in the aftermath of Hurricane Andrew.
305 246-6089 REPORT MONTH Se tember 1992 Unit 3 did not operate in the month of September due to re-covery operations in the aftermath of Hurricane Andrew.Unit 3 will commence its Cycle 13 refueling outage on October 1, 1992.
Unit 3 will commence its Cycle 13 refueling outage on October 1, 1992.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-250 DATE October 12 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 No 12 Date 920823 Duration (Hours)720.0 Reason'ethod of shutting Down Reactor'icensee Event Reports NIA System code'z Component codes zzzzz Cause C Corrective Action to Prevent Recurrence Unit Shutdown due to Hurricane Andrew F Forced S-Scheduled Reason A-Equipment Failure B-Naintenance or Test C-Re f u cling D-Regulatory restrlctlon E-Operator Training 6 License Examination P-Administrative G-Operational Error (Explain)H-Other (Explain)Nethod 1-Manual 2-Nanual scram 3-Automatic scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)Pile (NUREG-0161)
Exhibit 1-Sa=e Source


AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE October 5 1992 COMPLETED BY M.E.Goldie TELEPHONE 305-246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net)9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92 OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 10/6/92 COMPLETED BY M.E.GOLDIE TELEPHONE 305/246/6089 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD:SEPTEMBER 1992 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT.GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF AnY: MONTHLY-YTO-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING OER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 37.1 0.0 0.0 0.0 0 0-5103 0.0 0.0 0.0 0.0 100.0 6575 5553.6 0.0 5482.1 0.0 11799592 3779530 3591938 83.4 83.4 82.0 78.8 16.5 167500.0 108166.1 166.6 104385.5 32.1 220113929 70251840 66443700 62.3 62.3 60.6 57.2 12.1 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/01/92  
UNIT SHUTDOWNS AND                      POWER REDUCTIONS DOCKET NO.          50-250 DATE            October 12          1992 COMPLETED BY            M.Goldie TELEPHONE              305 246-6089 REPORT MONTH Se          tember 1992 Duration    Reason'ethod of                  System  Component              Cause  C Corrective No        Date (Hours)                shutting    Event                  codes                      Action to Reactor'icensee Down    Reports      code'z                          Prevent Recurrence 12      920823    720.0                              NIA                zzzzz              Unit Shutdown due to Hurricane Andrew F    Forced            Reason                        Nethod                        Exhibit G  Instructions        Exhibit 1 - Sa=e Source
  -  Scheduled        A  Equipment  Failure        1  Manual                    for Preparation of  Data 2 - Nanual scram S
B  Naintenance or Test                                      Entry Sheets Licensee C      f Re u cling
                          - Regulatory  restrlctlon 3  Automatic scram 4  Continued Event Report (LER)
(NUREG-0161)
Pile D
Operator Training        5  Load Reduction E
License Examination 6
9 - Other (Explain)
P  Administrative G  Operational Error (Explain)
H  Other (Explain)
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke   Point   4 DATE October   5   1992 COMPLETED BY M.E. Goldie TELEPHONE 305 - 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92
 
OPERATING DATA REPORT DOCKET NO           50 - 251 DATE               10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE     305/246/6089 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT     UNIT 4
: 2. REPORTING PERIOD:SEPTEMBER 1992
: 3. LICENSED THERMAL POWER (MWT):                   2200
: 4. NAMEPLATE RATING (GROSS MWE):                   760
: 5. DESIGN ELECTRICAL RATING (NET MWE):             693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS   NUMBER 3 THROUGH     7)
SINCE LAST REPORT. GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS   FOR RESTRICTIONS, IF AnY:
MONTHLY     -YTO-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        720        6575        167500.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL             37. 1    5553.6      108166. 1
: 13. REACTOR RESERVE SHUTDOWN HOURS                     0.0        0.0          166. 6
: 14. HOURS GENERATOR ON-LINE                           0.0    5482.1      104385.5
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0          32. 1
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                 0  11799592    220113929
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)               0  3779530      70251840
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)           -5103    3591938      66443700
: 19. UNIT SERVICE FACTOR                               0.0      83.4            62.3
: 20. UNIT AVAILABILITYFACTOR                            0.0      83.4            62.3
: 21. CAPACITY FACTOR (USING MDC NET)                   0.0      82.0            60.6
: 22. CAPACITY FACTOR (USING OER NET)                   0.0      78.8            57.2
: 23. UNIT FORCED OUTAGE RATE                         100.0       16.5           12. 1
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:     10/01/92


==SUMMARY==
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point Unit 4 DATE October 5 1992 COMPLETED BY:M.E.Goldie TELEPHONE:
OP OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point Unit 4 DATE October 5 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 4 did not operate from September   1 to September 29 due to continued recovery operations in the aftermath of Hurricane Andrew.
305 246-6089 REPORT MONTH Se tember 1992 Unit 4 did not operate from September 1 to September 29 due to continued recovery operations in the aftermath of Hurricane Andrew.Unit 4 did commence startup sequence on September 30 and attain criticality.  
Unit 4 did commence startup sequence on September 30 and attain criticality.
~~
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE REPORT MONTH Se tember 1992 50-251 Turke Point 4 October 6 1992 M.Goldie 305 246-6089 No+10 Date 920823 Duration (Hours)720.0 Reason'ethod of Shutting Down Reac'tor Licensee Event ReportS N/A System Code'z Conponent Codes zzzzz cause s corrective Action to Prevent Recurrence Unit Shutdown due to Hurricane Andrew.F-Forced S-Scheduled Reason A-Equipnent Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training S License Exanination F-Aduinistrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual ScrarL 3-Autonatic Scran 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)
~ ~
Exhibit 1-Sane Source I'I}}
UNIT SHUTDOWNS AND                     POWER REDUCTIONS DOCKET NO.           50-251 UNIT NAME          Turke Point 4 DATE            October 6 1992 COMPLETED BY            M.Goldie TELEPHONE              305 246-6089 REPORT MONTH Se        tember 1992 No+       Date   Duration     Reason'ethod of   Licensee     System   Conponent               cause s corrective (Hours)              Shutting  Event                    Codes                      Action to Down  ReportS      Code'z                          Prevent Recurrence Reac'tor 10      920823  720.0                            N/A                  zzzzz            Unit Shutdown due   to Hurricane Andrew.
F - Forced           Reason
                          - Equipnent Failure Method
                                                    -                            Exhibit G  Instructions        Exhibit 1  Sane Source S - Scheduled         A                           1
                                                    - Manual                    for Preparation of Entry Sheets Licensee Data B Maintenance or Test     2    Manual ScrarL C - Refueling               3  Autonatic Scran            Event Report (LER)  File D Regulatory restriction 4  Continued                  (NUREG-0161)
E - Operator Training       5  Load Reduction License Exanination S
9 - Other  (Explain)
F - Aduinistrative G - Operational Error (Explain)
H   Other (Explain)
 
I
'I}}

Latest revision as of 21:41, 3 February 2020

Monthly Operating Repts for Sept 1992 for Turkey Point Units 1 & 2.W/921012 Ltr
ML17349A409
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1992
From: Goldie M, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-289, NUDOCS 9210190280
Download: ML17349A409 (17)


Text

WCCZCEa~rzo or~raram.rOx ozrvrOr Wa.xerox s YSrzrvr REGULAT~ INFORMATION DISTRIBUTION~STEM (RIDS)

ACCESSION NBR:9210190280 DOC.DATE: 92/09/30 NOTARIZED: NO DOCKET FACIL?50-250 Turkey Point Plant", Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION GOLDIE,M.E. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1992 for Turkey Point Units 1 a 2.W/921012 ltr.

TITLE: Monthly Operating

  • . ~ - *- --*- :- r -- z Report (per Tech Specs)

S NOTES:NRR RAGHAVAN,L 05000250 NRR RAGHAVANiL 05000251 /

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3. 3 PD2-2 PD 1 1 AULUCK,R 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 Q/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG FI Ol 1 1 RGN2 1 1 EXTERNAL: EGSG BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 NOTE TO ALL'IDS"RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15

.. Box 029100, Miami, FL, 33102-9100 00T 12 1992 L-92-289 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant

" qzQeSQ 1Qj9Q28Q OgOOOPgQ ADocl pDR pgR an FPL Group company ZEQW

b AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE October 5 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92

OPERATING DATA REPORT DOCKET NO 50 250 DATE 10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: SEPTEMBER 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 6575 173768. 6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 5298.7 112024.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 0.0 5281. 6 110493.'I
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 10152700 228722766
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 3236870 73255256
18. NET ELECTRICAL ENERGY GENERATEO (MWH) -2575 3060583 69253669
19. UNIT SERVICE FACTOR 0.0 80.3 63.6
20. UNIT AVAILABILITYFACTOR 0.0 80.3 63.7
21. CAPACITY FACTOR (USING MDC NET) 0.0 69.9 60.9
22. CAPACITY FACTOR (USING DER NET) 0.0 67.2 57.5
23. UNIT FORCED OUTAGE RATE 100.0 17.2 12.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 3 REFUELING OUTAGE - STARTED 10/01/92
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ll/22/92

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke Point Unit 3 DATE October 12 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 3 did not operate in the month of September due to re-covery operations in the aftermath of Hurricane Andrew.

Unit 3 will commence its Cycle 13 refueling outage on October 1, 1992.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 DATE October 12 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 Duration Reason'ethod of System Component Cause C Corrective No Date (Hours) shutting Event codes Action to Reactor'icensee Down Reports code'z Prevent Recurrence 12 920823 720.0 NIA zzzzz Unit Shutdown due to Hurricane Andrew F Forced Reason Nethod Exhibit G Instructions Exhibit 1 - Sa=e Source

- Scheduled A Equipment Failure 1 Manual for Preparation of Data 2 - Nanual scram S

B Naintenance or Test Entry Sheets Licensee C f Re u cling

- Regulatory restrlctlon 3 Automatic scram 4 Continued Event Report (LER)

(NUREG-0161)

Pile D

Operator Training 5 Load Reduction E

License Examination 6

9 - Other (Explain)

P Administrative G Operational Error (Explain)

H Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE October 5 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 - 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD:SEPTEMBER 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF AnY:

MONTHLY -YTO- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 6575 167500.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 37. 1 5553.6 108166. 1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 0.0 5482.1 104385.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 11799592 220113929
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 3779530 70251840
18. NET ELECTRICAL ENERGY GENERATED (MWH) -5103 3591938 66443700
19. UNIT SERVICE FACTOR 0.0 83.4 62.3
20. UNIT AVAILABILITYFACTOR 0.0 83.4 62.3
21. CAPACITY FACTOR (USING MDC NET) 0.0 82.0 60.6
22. CAPACITY FACTOR (USING OER NET) 0.0 78.8 57.2
23. UNIT FORCED OUTAGE RATE 100.0 16.5 12. 1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/01/92

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point Unit 4 DATE October 5 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 4 did not operate from September 1 to September 29 due to continued recovery operations in the aftermath of Hurricane Andrew.

Unit 4 did commence startup sequence on September 30 and attain criticality.

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turke Point 4 DATE October 6 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 No+ Date Duration Reason'ethod of Licensee System Conponent cause s corrective (Hours) Shutting Event Codes Action to Down ReportS Code'z Prevent Recurrence Reac'tor 10 920823 720.0 N/A zzzzz Unit Shutdown due to Hurricane Andrew.

F - Forced Reason

- Equipnent Failure Method

- Exhibit G Instructions Exhibit 1 Sane Source S - Scheduled A 1

- Manual for Preparation of Entry Sheets Licensee Data B Maintenance or Test 2 Manual ScrarL C - Refueling 3 Autonatic Scran Event Report (LER) File D Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training 5 Load Reduction License Exanination S

9 - Other (Explain)

F - Aduinistrative G - Operational Error (Explain)

H Other (Explain)

I

'I