Monthly Operating Repts for Sept 1992 for Turkey Point Units 1 & 2.W/921012 Ltr
ML17349A409
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1992
From: Goldie M, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-289, NUDOCS 9210190280
Download: ML17349A409 (17)


Text

WCCZCEa~rzo or~raram.rOx ozrvrOr Wa.xerox s YSrzrvr REGULAT~ INFORMATION DISTRIBUTION~STEM (RIDS)

ACCESSION NBR:9210190280 DOC.DATE: 92/09/30 NOTARIZED: NO DOCKET FACIL?50-250 Turkey Point Plant", Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION GOLDIE,M.E. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1992 for Turkey Point Units 1 a 2.W/921012 ltr.

TITLE: Monthly Operating

  • . ~ - *- --*- :- r -- z Report (per Tech Specs)

S NOTES:NRR RAGHAVAN,L 05000250 NRR RAGHAVANiL 05000251 /

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3. 3 PD2-2 PD 1 1 AULUCK,R 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 Q/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG FI Ol 1 1 RGN2 1 1 EXTERNAL: EGSG BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 NOTE TO ALL'IDS"RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15

.. Box 029100, Miami, FL, 33102-9100 00T 12 1992 L-92-289 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant

" qzQeSQ 1Qj9Q28Q OgOOOPgQ ADocl pDR pgR an FPL Group company ZEQW

b AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE October 5 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92

OPERATING DATA REPORT DOCKET NO 50 250 DATE 10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: SEPTEMBER 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 6575 173768. 6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 5298.7 112024.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 0.0 5281. 6 110493.'I
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 10152700 228722766
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 3236870 73255256
18. NET ELECTRICAL ENERGY GENERATEO (MWH) -2575 3060583 69253669
19. UNIT SERVICE FACTOR 0.0 80.3 63.6
20. UNIT AVAILABILITYFACTOR 0.0 80.3 63.7
21. CAPACITY FACTOR (USING MDC NET) 0.0 69.9 60.9
22. CAPACITY FACTOR (USING DER NET) 0.0 67.2 57.5
23. UNIT FORCED OUTAGE RATE 100.0 17.2 12.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 3 REFUELING OUTAGE - STARTED 10/01/92
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ll/22/92

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke Point Unit 3 DATE October 12 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 3 did not operate in the month of September due to re-covery operations in the aftermath of Hurricane Andrew.

Unit 3 will commence its Cycle 13 refueling outage on October 1, 1992.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 DATE October 12 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 Duration Reason'ethod of System Component Cause C Corrective No Date (Hours) shutting Event codes Action to Reactor'icensee Down Reports code'z Prevent Recurrence 12 920823 720.0 NIA zzzzz Unit Shutdown due to Hurricane Andrew F Forced Reason Nethod Exhibit G Instructions Exhibit 1 - Sa=e Source

- Scheduled A Equipment Failure 1 Manual for Preparation of Data 2 - Nanual scram S

B Naintenance or Test Entry Sheets Licensee C f Re u cling

- Regulatory restrlctlon 3 Automatic scram 4 Continued Event Report (LER)

(NUREG-0161)

Pile D

Operator Training 5 Load Reduction E

License Examination 6

9 - Other (Explain)

P Administrative G Operational Error (Explain)

H Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE October 5 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 - 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD:SEPTEMBER 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF AnY:

MONTHLY -YTO- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 6575 167500.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 37. 1 5553.6 108166. 1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 0.0 5482.1 104385.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 11799592 220113929
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 3779530 70251840
18. NET ELECTRICAL ENERGY GENERATED (MWH) -5103 3591938 66443700
19. UNIT SERVICE FACTOR 0.0 83.4 62.3
20. UNIT AVAILABILITYFACTOR 0.0 83.4 62.3
21. CAPACITY FACTOR (USING MDC NET) 0.0 82.0 60.6
22. CAPACITY FACTOR (USING OER NET) 0.0 78.8 57.2
23. UNIT FORCED OUTAGE RATE 100.0 16.5 12. 1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/01/92

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point Unit 4 DATE October 5 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 4 did not operate from September 1 to September 29 due to continued recovery operations in the aftermath of Hurricane Andrew.

Unit 4 did commence startup sequence on September 30 and attain criticality.

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turke Point 4 DATE October 6 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 No+ Date Duration Reason'ethod of Licensee System Conponent cause s corrective (Hours) Shutting Event Codes Action to Down ReportS Code'z Prevent Recurrence Reac'tor 10 920823 720.0 N/A zzzzz Unit Shutdown due to Hurricane Andrew.

F - Forced Reason

- Equipnent Failure Method

- Exhibit G Instructions Exhibit 1 Sane Source S - Scheduled A 1

- Manual for Preparation of Entry Sheets Licensee Data B Maintenance or Test 2 Manual ScrarL C - Refueling 3 Autonatic Scran Event Report (LER) File D Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training 5 Load Reduction License Exanination S

9 - Other (Explain)

F - Aduinistrative G - Operational Error (Explain)

H Other (Explain)

I

'I