ML17349A409: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/30/1992 | | issue date = 09/30/1992 | ||
| title = Monthly Operating Repts for Sept 1992 for Turkey Point Units 1 & 2.W/921012 Ltr | | title = Monthly Operating Repts for Sept 1992 for Turkey Point Units 1 & 2.W/921012 Ltr | ||
| author name = | | author name = Goldie M, Plunkett T | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:WCCZCEa~rzo or~raram.rOx ozrvrOr Wa.xerox s YSrzrvr REGULAT~INFORMATION DISTRIBUTION~STEM (RIDS)ACCESSION NBR:9210190280 DOC.DATE: 92/09/30 NOTARIZED: | {{#Wiki_filter:WCCZCEa~rzo or~raram.rOx ozrvrOr Wa.xerox s YSrzrvr REGULAT~ INFORMATION DISTRIBUTION~STEM (RIDS) | ||
NO DOCKET FACIL?50-250 Turkey Point Plant", Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION GOLDIE,M.E. | ACCESSION NBR:9210190280 DOC.DATE: 92/09/30 NOTARIZED: NO DOCKET FACIL?50-250 Turkey Point Plant", Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION GOLDIE,M.E. Florida Power & Light Co. | ||
Florida Power&Light Co.PLUNKETT,T.F. | PLUNKETT,T.F. Florida Power a Light Co. | ||
Florida Power a Light Co.RECIP.NAME RECIPIENT AFFILIATION | RECIP.NAME RECIPIENT AFFILIATION | ||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating repts for Sept 1992 for Turkey Point Units 1 a 2.W/921012 ltr. | Monthly operating repts for Sept 1992 for Turkey Point Units 1 a 2.W/921012 ltr. | ||
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK.ROOM Pl-37 (EXT.504-2065)TO | TITLE: Monthly Operating | ||
* . ~ - *- --*- :- r -- z Report (per Tech Specs) | |||
S NOTES:NRR RAGHAVAN,L 05000250 NRR RAGHAVANiL 05000251 / | |||
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3. 3 PD2-2 PD 1 1 AULUCK,R 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 Q/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG FI Ol 1 1 RGN2 1 1 EXTERNAL: EGSG BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 NOTE TO ALL'IDS"RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK. | |||
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15 | |||
..Box 029100, Miami, FL, 33102-9100 00T 12 1992 L-92-289 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen: | .. Box 029100, Miami, FL, 33102-9100 00T 12 1992 L-92-289 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen: | ||
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Ross C.Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant | RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. | ||
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant | |||
" qzQeSQ 1Qj9Q28Q OgOOOPgQ ADocl pDR pgR an FPL Group company ZEQW | |||
b AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE October 5 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92 | |||
IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATEO (MWH)19.UNIT SERVICE FACTOR 20.UNIT | |||
OPERATING DATA REPORT DOCKET NO 50 250 DATE 10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS | |||
: 1. UNIT NAME: TURKEY POINT UNIT 3 | |||
: 2. REPORTING PERIOD: SEPTEMBER 1992 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 693 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE) | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
MONTHLY -YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 720 6575 173768. 6 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 5298.7 112024.0 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 | |||
: 14. HOURS GENERATOR ON-LINE 0.0 5281. 6 110493.'I | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 10152700 228722766 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 3236870 73255256 | |||
: 18. NET ELECTRICAL ENERGY GENERATEO (MWH) -2575 3060583 69253669 | |||
: 19. UNIT SERVICE FACTOR 0.0 80.3 63.6 | |||
: 20. UNIT AVAILABILITYFACTOR 0.0 80.3 63.7 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 0.0 69.9 60.9 | |||
: 22. CAPACITY FACTOR (USING DER NET) 0.0 67.2 57.5 | |||
: 23. UNIT FORCED OUTAGE RATE 100.0 17.2 12.6 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 3 REFUELING OUTAGE - STARTED 10/01/92 | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ll/22/92 | |||
==SUMMARY== | ==SUMMARY== | ||
OP OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke Point Unit 3 DATE October 12 1992 COMPLETED BY:M.E.Goldie TELEPHONE: | OP OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke Point Unit 3 DATE October 12 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 3 did not operate in the month of September due to re-covery operations in the aftermath of Hurricane Andrew. | ||
305 246-6089 REPORT MONTH Se tember 1992 Unit 3 did not operate in the month of September due to re-covery operations in the aftermath of Hurricane Andrew.Unit 3 will commence its Cycle 13 refueling outage on October 1, 1992. | Unit 3 will commence its Cycle 13 refueling outage on October 1, 1992. | ||
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE October 5 1992 COMPLETED BY M.E.Goldie TELEPHONE 305-246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net)9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92 | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 DATE October 12 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 Duration Reason'ethod of System Component Cause C Corrective No Date (Hours) shutting Event codes Action to Reactor'icensee Down Reports code'z Prevent Recurrence 12 920823 720.0 NIA zzzzz Unit Shutdown due to Hurricane Andrew F Forced Reason Nethod Exhibit G Instructions Exhibit 1 - Sa=e Source | ||
- Scheduled A Equipment Failure 1 Manual for Preparation of Data 2 - Nanual scram S | |||
B Naintenance or Test Entry Sheets Licensee C f Re u cling | |||
- Regulatory restrlctlon 3 Automatic scram 4 Continued Event Report (LER) | |||
(NUREG-0161) | |||
Pile D | |||
Operator Training 5 Load Reduction E | |||
License Examination 6 | |||
9 - Other (Explain) | |||
P Administrative G Operational Error (Explain) | |||
H Other (Explain) | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE October 5 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 - 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92 | |||
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS | |||
: 1. UNIT NAME: TURKEY POINT UNIT 4 | |||
: 2. REPORTING PERIOD:SEPTEMBER 1992 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 693 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT. GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) | |||
: 10. REASONS FOR RESTRICTIONS, IF AnY: | |||
MONTHLY -YTO- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 720 6575 167500.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 37. 1 5553.6 108166. 1 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6 | |||
: 14. HOURS GENERATOR ON-LINE 0.0 5482.1 104385.5 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 11799592 220113929 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 3779530 70251840 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) -5103 3591938 66443700 | |||
: 19. UNIT SERVICE FACTOR 0.0 83.4 62.3 | |||
: 20. UNIT AVAILABILITYFACTOR 0.0 83.4 62.3 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 0.0 82.0 60.6 | |||
: 22. CAPACITY FACTOR (USING OER NET) 0.0 78.8 57.2 | |||
: 23. UNIT FORCED OUTAGE RATE 100.0 16.5 12. 1 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/01/92 | |||
==SUMMARY== | ==SUMMARY== | ||
OP OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point Unit 4 DATE October 5 1992 COMPLETED BY:M.E.Goldie TELEPHONE: | OP OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point Unit 4 DATE October 5 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 4 did not operate from September 1 to September 29 due to continued recovery operations in the aftermath of Hurricane Andrew. | ||
305 246-6089 REPORT MONTH Se tember 1992 Unit 4 did not operate from September 1 to September 29 due to continued recovery operations in the aftermath of Hurricane Andrew.Unit 4 did commence startup sequence on September 30 and attain criticality. | Unit 4 did commence startup sequence on September 30 and attain criticality. | ||
~~ | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ~ ~ | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turke Point 4 DATE October 6 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 No+ Date Duration Reason'ethod of Licensee System Conponent cause s corrective (Hours) Shutting Event Codes Action to Down ReportS Code'z Prevent Recurrence Reac'tor 10 920823 720.0 N/A zzzzz Unit Shutdown due to Hurricane Andrew. | |||
F - Forced Reason | |||
- Equipnent Failure Method | |||
- Exhibit G Instructions Exhibit 1 Sane Source S - Scheduled A 1 | |||
- Manual for Preparation of Entry Sheets Licensee Data B Maintenance or Test 2 Manual ScrarL C - Refueling 3 Autonatic Scran Event Report (LER) File D Regulatory restriction 4 Continued (NUREG-0161) | |||
E - Operator Training 5 Load Reduction License Exanination S | |||
9 - Other (Explain) | |||
F - Aduinistrative G - Operational Error (Explain) | |||
H Other (Explain) | |||
I | |||
'I}} |
Latest revision as of 21:41, 3 February 2020
ML17349A409 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 09/30/1992 |
From: | Goldie M, Plunkett T FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-92-289, NUDOCS 9210190280 | |
Download: ML17349A409 (17) | |
Text
WCCZCEa~rzo or~raram.rOx ozrvrOr Wa.xerox s YSrzrvr REGULAT~ INFORMATION DISTRIBUTION~STEM (RIDS)
ACCESSION NBR:9210190280 DOC.DATE: 92/09/30 NOTARIZED: NO DOCKET FACIL?50-250 Turkey Point Plant", Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION GOLDIE,M.E. Florida Power & Light Co.
PLUNKETT,T.F. Florida Power a Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Sept 1992 for Turkey Point Units 1 a 2.W/921012 ltr.
TITLE: Monthly Operating
- . ~ - *- --*- :- r -- z Report (per Tech Specs)
S NOTES:NRR RAGHAVAN,L 05000250 NRR RAGHAVANiL 05000251 /
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3. 3 PD2-2 PD 1 1 AULUCK,R 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 Q/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG FI Ol 1 1 RGN2 1 1 EXTERNAL: EGSG BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 NOTE TO ALL'IDS"RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15
.. Box 029100, Miami, FL, 33102-9100 00T 12 1992 L-92-289 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant
" qzQeSQ 1Qj9Q28Q OgOOOPgQ ADocl pDR pgR an FPL Group company ZEQW
b AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE October 5 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92
OPERATING DATA REPORT DOCKET NO 50 250 DATE 10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: SEPTEMBER 1992
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 720 6575 173768. 6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 5298.7 112024.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 0.0 5281. 6 110493.'I
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 10152700 228722766
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 3236870 73255256
- 18. NET ELECTRICAL ENERGY GENERATEO (MWH) -2575 3060583 69253669
- 19. UNIT SERVICE FACTOR 0.0 80.3 63.6
- 20. UNIT AVAILABILITYFACTOR 0.0 80.3 63.7
- 21. CAPACITY FACTOR (USING MDC NET) 0.0 69.9 60.9
- 22. CAPACITY FACTOR (USING DER NET) 0.0 67.2 57.5
- 23. UNIT FORCED OUTAGE RATE 100.0 17.2 12.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 3 REFUELING OUTAGE - STARTED 10/01/92
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ll/22/92
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke Point Unit 3 DATE October 12 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 3 did not operate in the month of September due to re-covery operations in the aftermath of Hurricane Andrew.
Unit 3 will commence its Cycle 13 refueling outage on October 1, 1992.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 DATE October 12 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 Duration Reason'ethod of System Component Cause C Corrective No Date (Hours) shutting Event codes Action to Reactor'icensee Down Reports code'z Prevent Recurrence 12 920823 720.0 NIA zzzzz Unit Shutdown due to Hurricane Andrew F Forced Reason Nethod Exhibit G Instructions Exhibit 1 - Sa=e Source
- Scheduled A Equipment Failure 1 Manual for Preparation of Data 2 - Nanual scram S
B Naintenance or Test Entry Sheets Licensee C f Re u cling
- Regulatory restrlctlon 3 Automatic scram 4 Continued Event Report (LER)
Pile D
Operator Training 5 Load Reduction E
License Examination 6
9 - Other (Explain)
P Administrative G Operational Error (Explain)
H Other (Explain)
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE October 5 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 - 246-6089 MONTH Se tember 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/92 9/02/92 9/03/92 9/04/92 9/05/92 9/06/92 9/07/92 9/08/92 9/09/92 9/10/92 9/11/92 9/12/92 9/13/92 9/14/92 9/15/92 9/16/92 9/17/92 9/18/92 9/19/92 9/20/92 9/21/92 9/22/92 9/23/92 9/24/92 9/25/92 9/26/92 9/27/92 9/28/92 9/29/92 9/30/92
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 6/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD:SEPTEMBER 1992
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF AnY:
MONTHLY -YTO- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 720 6575 167500.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 37. 1 5553.6 108166. 1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
- 14. HOURS GENERATOR ON-LINE 0.0 5482.1 104385.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 11799592 220113929
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 3779530 70251840
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) -5103 3591938 66443700
- 19. UNIT SERVICE FACTOR 0.0 83.4 62.3
- 20. UNIT AVAILABILITYFACTOR 0.0 83.4 62.3
- 21. CAPACITY FACTOR (USING MDC NET) 0.0 82.0 60.6
- 22. CAPACITY FACTOR (USING OER NET) 0.0 78.8 57.2
- 23. UNIT FORCED OUTAGE RATE 100.0 16.5 12. 1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/01/92
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point Unit 4 DATE October 5 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH Se tember 1992 Unit 4 did not operate from September 1 to September 29 due to continued recovery operations in the aftermath of Hurricane Andrew.
Unit 4 did commence startup sequence on September 30 and attain criticality.
~ ~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turke Point 4 DATE October 6 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH Se tember 1992 No+ Date Duration Reason'ethod of Licensee System Conponent cause s corrective (Hours) Shutting Event Codes Action to Down ReportS Code'z Prevent Recurrence Reac'tor 10 920823 720.0 N/A zzzzz Unit Shutdown due to Hurricane Andrew.
F - Forced Reason
- Equipnent Failure Method
- Exhibit G Instructions Exhibit 1 Sane Source S - Scheduled A 1
- Manual for Preparation of Entry Sheets Licensee Data B Maintenance or Test 2 Manual ScrarL C - Refueling 3 Autonatic Scran Event Report (LER) File D Regulatory restriction 4 Continued (NUREG-0161)
E - Operator Training 5 Load Reduction License Exanination S
9 - Other (Explain)
F - Aduinistrative G - Operational Error (Explain)
H Other (Explain)
I
'I