Re: Turkey Point Units 3 and 4 Docket Nos.. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the February 1994 Operating Status and Summary'f Operating Experience Reports for Turkey Point Units 3 and 4. | Re: Turkey Point Units 3 and 4 Docket Nos.. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the February 1994 Operating Status and Summary'f Operating Experience Reports for Turkey Point Units 3 and 4. | ||
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/JEK/jk Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9403220131; 940314 | Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/JEK/jk Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9403220131; 940314 | ||
-'RPDR--'- -,ADOCK,',OS000250 | -'RPDR--'- -,ADOCK,',OS000250 | ||
. '.P..DR" '," | . '.P..DR" '," | ||
Line 98: | Line 97: | ||
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE: March 11 1994 COMPLETED J. E. Knorr BY'ELEPHONE: | OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE: March 11 1994 COMPLETED J. E. Knorr BY'ELEPHONE: | ||
305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 3 began the month at essentially 100% and maintained that level until forced to reduce power to approximately 2% to repair the 3D moisture separator reheater drain line on February 21. | 305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 3 began the month at essentially 100% and maintained that level until forced to reduce power to approximately 2% to repair the 3D moisture separator reheater drain line on February 21. | ||
The unit had a hold at 30% power for steam generator chemistry on February 22 and returned to 100% power that same day. The Unit remained at essentially 100 power for the remainder of the | The unit had a hold at 30% power for steam generator chemistry on February 22 and returned to 100% power that same day. The Unit remained at essentially 100 power for the remainder of the month. | ||
month. | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT DATE COMPLETED BY MARCH J. E. | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT DATE COMPLETED BY MARCH J. E. |
Revision as of 22:34, 3 February 2020
ML17352A480 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 03/14/1994 |
From: | Knorr J, Plunkett J FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-94-057, L-94-57, NUDOCS 9403220131 | |
Download: ML17352A480 (15) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9403220131 DOC. DATE: 94/03/14 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION "KNORR,J.E. Florida Power & Light Co.
PLUNKETT,J.F. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Feb 1994 for Turkey Point Units D 3 &. 4.W/940314 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL f SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 CROTEAU,R 1 1 D
INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 R/PCS. OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FILE 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11
K p
'0')~
~ d J~
1
~
~
aa 1
t
, e
.. Box 029100, Miami, FL, 33102-9100 MAR 14 Sg<
L-94-057 10 CFR 50.36 U. ST Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket Nos.. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the February 1994 Operating Status and Summary'f Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/JEK/jk Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9403220131; 940314
-'RPDR--'- -,ADOCK,',OS000250
. '.P..DR" ',"
';
gpg'
')fl CO~~
2 4U'Q f; A m O~9 an FPL.Group company
I 4C C
V I
f
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT 3 DATE MARCH 11 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94 694 2/02/94 702 2/03/94 706 2/04/94 703 2/05/94 695 2/06/94 689 2/07/94 685 2/08/94 684 2/09/94 683 2/10/94 683 2/11/94 681 2/12/94 681 2/13/94 678 2/14/94 676 2/15/94 691 2/16/94 691 2/17/94 695 2/18/94 699 2/19/94 697 2/20/94 688 2/21/94 14 2/22/94 143 2/23/94 671 2/24/94 678 2/25/94 678 2/26/94 678 2/27/94 682 2/28/94 689
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: March 11 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 No. Date Type Duration Reason Nethod of Licensee System Co ponep. Cause 4 Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down 3
Reports Reactor 04 022194 31. 2 N/A CC PIPEXX Reduced power to 2% to repair 3D MSR Drain Line 05 022294 0.0 N/A PIPEXX Steam Generator Chemistry hold-point at 30i P Pozced Reason Nethod Exhibit G - Ins ructions Exhibit - Same Source S Scheduled A - Equipment Failure 1 Ymnual for Preparation of Data 1
B Y~intenance or Test 2 - Nanual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Pile D - Regulatory restriction 4 - Continued (NUREG-0)61)
E - Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)
P Administrative G - Operational Error (Explain)
H - Other (Explain)
L r
I g t 0
OPFRAT ING DATA REPORT DOCKET NO 50 - 250 DATE 3/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPEflATlNG STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
?. RFPOflTING PERIOD: FEBRUARY 1994 3, 1 ICFNSED THERMAL POWER (MWT): 2200 4, NAMEPl.ATE RATING (GROSS MWE): 760 DESIGN FLLCTR ICAl. RATING (NET MWE): 693
- 6. MAXlMUM DEPFNDABLE CAPAClTY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE f>. HOffRS IN REPORT PERIOD: 672 1416 186153. 6 1? NffMBER OF ffOURS REACTOR WAS CRITICAL 672.0 1416. 0 122676. 2
- 13. REACTOR RFSERVE. SHUTDOWN HOURS 0.0 0.0 844.4
- 14. cfOURS GFNERAIOR ON-LINE 640.8 1368.2 120901. 5
- 15. UNI'1 RESERVf: StfU100WN HOURS 1391 126 2975327 251 1 15165 1/. GROSS ELECTRICAL ENERGY GENERATEO (MWH) 454310 977835 8055965 1
- 18. NE1 hf.EC 1'R I CAL FNERGY GENERATEO (MWH) 432803 932010 76201515
- 19. UNlT SERVICE FACIOR 95.4 96. 6 64.9
- 20. UNIT AVAILABILIIY FACTOR 95.4 96. 6 65.0
- 21. CAPACITY FACTOR (USING MDC NET) 96.7 98.8 62.5
??. CAPAC11Y FACTOR (USING DER NET) 92.9 95.0 59. 1
?3. UNIT FORCED OUfAGE RATE 4.6 3.4 11.7
- 24. SffUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 14 REFUELING SCffEDULED FOR 4/94
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
t ~
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE: March 11 1994 COMPLETED J. E. Knorr BY'ELEPHONE:
305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 3 began the month at essentially 100% and maintained that level until forced to reduce power to approximately 2% to repair the 3D moisture separator reheater drain line on February 21.
The unit had a hold at 30% power for steam generator chemistry on February 22 and returned to 100% power that same day. The Unit remained at essentially 100 power for the remainder of the month.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT DATE COMPLETED BY MARCH J. E.
ll 1994 Knorr 4
TELEPHONE 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94 143 2/02/94 525 2/03/94 701 2/04/94 699 2/05/94 694 2/06/94 690 2/07/94 687 2/08/94 687 2/09/94 686 2/10/94 685 2/11/94 684 2/12/94 684 2/13/94 681 2/14/94 681 2/15/94 691 2/16/94 692 2/17/94 695 2/18/94 699 2/19/94 699 2/20/94 691 2/21/94 682 2/22/94 681 2/23/94 682 2/24/94 682 2/25/94 679 2/26/94 680 2/27/94 686 2/28/94 692
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: TURKEY POINT UNIT 4 DATE: MARCH 11 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 No. Date Typel Duration Reason Yothod of Licensee Syste4> Coupon op cause 4 corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Reportf Reactor 01 020194 38.5 N/A CH VALVEX REPAIR TO FEEDNATER REG VALVE FCV 4-498 F Forced Reason Yethod Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equip"ent Failure 1 - Nanual for Preparation of Data 8 - Maintenance or Test 2 - Nanual scran Entry sheets Licensee C - Refueling 3 Auto"-atlc Scran Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)
E - Operator Training 6 5 - Load Reduction Exanination 9 - Other (Explain)
F - License Adninistratlve G Operational Error (Explain)
H Other (Explain)
H
)a t ~
I, f
w J 4
~ )II) 4 '
II
OPERATING DA'fA REPORT DOCKET NO 50 - 251 DATE 3/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: FEBRUARY 1994
- 3. LICENSED 1HERMAL POWER (MWT): 2200 4 NAMEPLATE RATING (GROSS MWE): 760
- b. DESIGN ELECfRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLF CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE I.AST REPOR f, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTO- CUMULATIVE 1 1. HOURS IN RFPORT PERIOD: 672 1416 179885.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1416.0 118696.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LiNE 672.0 1416.0 114741. 0
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1435483 3068984 242128939
- 17. GROSS ELECIRICAL ENERGY GENERATED (MWH) 467230 1004470 77358440
- 18. NET ELFCTRICAL ENERGY GENERATED (MWH) 445373 958255 73193487 19 . UNlr SERVICE FACTOR 100.0 100.0 63.8
- 20. UNIf AVAILABILITYFACTOR 100. 0 100.0 64.1
- 21. CAPACITY FACTOR (USING MDC NET) 99.5 101. 6 62.1
- 27. CAPACITY FAC'fDR (USING DER NET) 95.6 97.7 58.7
- 23. UNIT FORCED OUTAGF RATE 0.0 0.0 11.2
- 24. S>>ufDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 4 DATE March 11 1994 COMPLETE BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 4 began the month of February at reduced power of approximately 40% to repair Feedwater Reg Valve FCV 4-498.
The Unit was returned to essentially 100% power on February 2 and remained at that level through the end of the month.