W3P89-1575, Monthly Operating Rept for Aug 1989 for Waterford 3
| ML20247P459 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/31/1989 |
| From: | Burski R, Centolanzi P LOUISIANA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3P89-1575, NUDOCS 8909270173 | |
| Download: ML20247P459 (7) | |
Text
. _. _ _ _.
' i.
t
['
LO UISI AN A /- 317 BARONNE STREET P. O. BOX 60340 (504)595 3100 POWER & LIGHT NEW ORLEANS, LOUISIANA 70160
+
t UTTONivsE W3P89-1575 A4.05 QA September 15, 1989 U.S. Kuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Gentlemen:
Enclosed is the subject monthly report which covers the operating statistics for the month of August, 1989. This report is submitted per Section.6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours,
.f C
R.F. Burski Manager Nuclear Safety & Regulatory Affairs RFB/LWL/0PP/pi Euclosure cc:
R.D. ?!artin, NRC 5egion IV NRC Realdent inspectm a Office F.3. Mebdon NP!J -NBR s
INPO Records Center Q.1 Uheelock)
E.L, Blake W.M. Stevenson
' \\
jpy2;gJjg((,8%{,fgg2 R
"AN EQUAL OPPORTUNITY EMPLOYER"
.i i
r NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 AUGUST 1989 The unit operated at an average reactor power of 89.2% and experienced one (1)
. shutdown during the period.
W310204B
..y, PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of August 1989, there were no pressurizer safety valve failures or challenges.
l
-W310204B
,=
OPERATING DATA REPORT UNIT NAME: VATERFORD 3 CITY / STATE: KILLONA/LA DATE: September 1989 OPERATING STATUS
- 1. Docket: 50-382 Notes
- 2. Reporting Period: AUGUST 1989
- 3. Utility
Contact:
PATRICK CENT 0LANZI Phone Number:
(504) 464-3360
- 4. Licensed Thermal Power (MWt): 3390
- 5. Nameplate Rating (Gross Mwe): 1200
- 6. Design Electrical Rating (Net MWe): 1104
- 7. Maximum Dependable Capacity (Gross MWe): 1120
- 8. Maximum Dependable Capacity (Net MWe): 1075 9.'If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
10.
Power Level To Which Restricted, if Any (Net MWe):
NONE 11.
Reasons For Restrictions, Ii Any: N/A This Month Yr.-to-Date Cumulative i
12.
Fours In Reporting Period 744.0 5831.0 _
34512.D 13.
Number Of Hours Reactor Was Critical 683.8 5660.9 28390.0 14.
Reactor Reserve Shutdown Hours l-15 Hours Generator On-Line 674.5 5641.8 27929.0 l
16.
Unit Reserve Shutdown Hours l j.
W330204B Io_ _ _
e r
OPERATING DATA REPORT (Continued)
This Month Yr.-to-Date Cumulative
, 17.
Gross Thermal Energy 2,249,799 18,815,241 90,838,837 Generated (MWH) 18.
Gross Electrical Energy 746,760 6,347,760 30,617,710 Generated (MWH)
- 19. Net Electrical Energy 709,456 6,072,140 29,132,994 Generated (MWH).
20.
Unit Service Factor 90.7 96.8 80.9
- 21. ' Unit Availability Factor 90.7 96.8 80.9
- 22. Unit Capacity-Factor-88.7 96.9 78.5-(Using MDC Net)
- 23. Unit Capacity Factor 86.4 94.3 76.5
'(Using DER Net)
- 24. Unit Forced Outage Rate 9.3 3.2 5.8
- 25.. Unit Forced Outage Hours 69.5 189.3 1716.0
~26.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage #3, 9/22/89, 60 Days
- 27.
If Shut Down At End of Report Period, Estimated Eate of Startup:
- 28. Urdts In Test Status (Prior to Commercial Operation):
Forecast Achieved 1
INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85 W310204B lL_____-__-_____-_-_______-
ti :
l-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE SEPTEMBER 1939 COMPLETED BY PATRICK CENT 0LANZI TELEPHONE 504-464-3360 MONTH AUGUST 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1080 17 1068 2
1072 18 1071 3
1074 19 571 4
1075 20
-46 5
1074 21
-47 6
1072 22 239 7
1067 23 1049 8
i074 24 1070 9
1070 25 1070 10 1070 26 1068 11 1072 27 1069 12 1071 28 1071 13 1073 29 1068 14 1074 30 1066 l
15 1074 31 1061 16 1074 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each l
l day in the reportirg month.
Compute to the nearest whole megawatt.
l W310204B I
!i];1 if A
V o T' s
j l n eo cat o y
e*
t8 nisu nt a1 ogt cdd e nx I
tii eeeiti e Z
e e
gA ssprt sl d
N v
c nEd oS anugn A
i n
iC nt p riacnI y
9 L
t e
t on het rii 8
0 c
r s, ped cwitft e 9
T 0
eor ersmoeon fl p 3
1 N 6 rt u t e e e r T pi e i u a E
3 r
c wrv nd sh D R C 3
one Ao oe,ahi eS p R E C oR Epomh n cd sr i
O B K
4 i
C t
t odi oa l r 2
F M C 6
&tt d
d i ehI wl at 3
8 R E I
4 cn ged rotrw/
oi 4
8 3
E T R eAe nceat ai nhrx) 8 9
T P T 4
s v
i ul w i unoctAI 9
1
. 0 A E A 0
u e
rdit evqonin S
1 5WSP5 a
r ueauaeeiehonA A
C P
Drf odd rtXwca(
5 3
0 0
8 8
Y B
t n
d d
t NM EN ne S
S A
TO od TN EH po V
E E
E LP mC I
E E
KTEPE o
R E
E CITML C
D 4I5I ONAOE DUDCT me4 r.
t e a
n r
o S
sd N
yo A
mcni O
SC A
aS ot I
r i c
- T cct u C
Si ad U
t ue D9 e
ll anR E8 et aami r
R9 snt 7
d uuotd e 1
ner 1
onnt nah R
evo 0
h aauoot ET cEp tMMACLO WS i
e 9
e-0U L
R 8
3M1 23459 FGU DA NAR 3
O r
SF f
o N
)
)
TP htR 3
n n
UE t u i
i HR ehn a
a S~
MS w l
l o
p n
p T
D x
o x
I E
i E
N
( t t&n
(
U s
c o
ee i gi r
2 rT rnt o
N u
ti a r)
O l r snnern S
i o eiivEi A
A a
Rami a
E Fe ratll R
c yT x a a p t.
ngr Ernx ranor t oE enit oesi(
n mel at sit pt el annar o) i S ninuureir e tR ouif gecmeh aU 5
s q a e e pi d pt aEMRROLAOO rO uH 9
e - - - - -
D(
6 2RABCDE FGH l ep F
y T
9 d
1 e
e 8
l t
0 d u a
9 ed D
8 ce rh B
oc 4
5 FS 0
0 2
0 o
9 1
N 8
I F5 3W l
- l l
-