W3P89-1538, Monthly Operating Rept for Jul 1989 for Waterford 3

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1989 for Waterford 3
ML20246B187
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/31/1989
From: Burski R, Centolanzi P
LOUISIANA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3P89-1538, NUDOCS 8908230276
Download: ML20246B187 (7)


Text

_ . . . .

j . . .

e

,

  • d

.- e I

e P. O. BOX 60340 l OUISI&AN POWER A/

LIGHT 317 BARONNE NEW STREET ORLEANS, LOUISIANA 70160 *

(504) 595-3100 INfu?OlvsE W3P89-1538 i A4.05 QA J

August 15, 1989 U.S.-Nuclear Regulatory Commission ATTN: Document Control Desk q Washington, D.C. 20555  ;

.)'

Subject:

Waterford 3 SES Docket No. 50-382 License No NPF-38 MONTHLY OPERATING REPORT Gentlemen:

Enclosed is the subject monthly report which covers the operating statistics for the month of July, 1989. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, L

R.F. Burski Manager Nuclear Safety & Regulatory Affairs l l

RFB/LWL/0PP/pi )

Enclosure cc: R.D. Martin, NRC Region IV NRC Resident Inspectors Office i F.J. Hebdon, NRC-NRR INPO Records Center (J.T. Wheelock) ,

E.L. Blake j W.M. Stevenson ]

1 h l l h ) i

)

1 8908230276 890731 -

{DR ADOCK 05000382 PDC i

"AN EQUAL OPPORTUNITY EMPLOYER"  !

p. , - -

.v, 3 .

1 h

NRC MONTHLY OIERATING-REPORT

SUMMARY

OF OPERATIONS-

'WATERFORD 3 JULY 1989 The unit operated _at an average reactor power of 90.9%.and experienced one (1) shutdown during the period.

I W310204B

7 ;-

!.l:. ,,. c. s .

f ;. .,-

. PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of. July 1989, there were no pressurizer safety valve failures or challenges.

4

. W310204B-l w u __ - ____ - _ .

r q ,. im-OPERATING DATA REPORT l 9. --

UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: August 1989

-OPERATING STATUS

-1. Docket: 50-382 Notes

2. Reporting Period: _ JULY 1989
3. Utility

Contact:

PATRICK CENT 0LANZI.

Phone Number: (504) 464-3360

4. Licensed Thermal Power (MWt): 3390

.5. Nameplate Rating (Gross Hwe): 1200

' 6. Design Electrical Rating'(Net MWe): 1104

7. Maximum Dependable Capacity (Gross MWe): 1120
8. Maximum Dependable Capacity (Net MWe): 1075
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give~ Reasons:
10. Power Level To Which Restricted, if Any (Net MWe): NONE
11. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative i 1

'l

12. Hours In Reporting Period 744.0 5087.0 33768.0

'13. Number Of Hours Reactor Was Critical 692.8 4977.1 27706.2 ,

14. Reactor Reserve Shutdown Bours __

15 Hours Generator On-Line 686.7 4967.3 27254.5

'16. Unit Reserve Shutdown Hours W310204B-

1  :

OPERATING DATA REPORT

'(Continued)

Thin Month Yr.-to-Date Cumulative 1'

~17. Gross Thermal Energy' 2,292,538 16,565,442 88,589,038-Generated (MWH)

18. Gross Electrical' Energy 764,050 5,601,000 29,870,950 Generated (MWH)
19. Net Electrical Energy 727,264 5,362,684 '28,423,538 Generated (MWH)
20. Unit Service Factor 92.3 97.6 80.7-21.. Unit Availability Factor 92.3 97.6 80.7'
22. Unit Capacity Factor 90.9 98.1 78.3 (Using MDC Net)

' 23 '. Unit Capacity Factor 88.5 95.5 76.2 (Using DER Net)

24. Unit Forced Outage Rate 7.7 2.4 5.7
25. Unit Forced Outage Hours 57.4 119.8 1646.5
26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage #3, 9/22/89, 60 Days

27. If Shut Down At End of Report Period, Estimated Date of Startup:
28. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85 W310204B

  1. i. %
  • }~, s
  • L AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE AUGUST 1989 COMPLETED BY PATRICK CENT 0LANZI TELEPHONE 504-464-3360 MONTH JULY 1989 DA'l - AVERAGE DAIJJ POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1- 1085 17 60 2' 1082- 18 1041

'3 1083- 19 1080 4 1083 20 1078 5 1082 21 1079

'6. 1083 22 1079 7 1081 23 1082 8 1081 24 1073 9 1078 25 1068 10 1067 26 1070 11 1077 27 1072 12 1008 28 1075 13 997 29 1074 14 1075 30 1076 15 305 31 1074 16 -46

- INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

~W310204B

39N6 rt u t oel awn 8E3 r c C sFr e D9C3 one f . u eth R1 O K4

- C oR i

ora rnnw eC eea 2FTC6 &tt et tGld 3 8RSI 4 cn rama P e 4 8 3EUR - eAe uwewm p . 8 9

- TGT4 s v ldtd a pl 9 1 0AUA0_ u e i esee .il 1 -

5WAP5_ C a

P r a e yet 1 re - A FFSFS#TF 5 3 0 0 8 8

.' Y .

B t . .

n d d OE DE eS t t NM EN ne S S

~ A TO od TN EH po E E E LP mC E E KTEPE o C E E CI TML C L 4I 5I ONAOE DUDCT -

m .

e4 m t e a n S sd .r o N yo J mcni O SC S aS ot I -

r i c T cct u C Si ad U t ue D e # ll anR E9 et a ami r R8 s nt 3 d uuotd e 9 ner 1 onnt nah R1 evo 0 h a auoot E cEp - tMMACLO WY i e 9 e - - - - - -

OL L R 8 3M1 23459 PU J

D NR AO 3 r

F S f o NT ogt WR nc OO di a DP ot e ) )

TE htR 2 n n UR t u i i H eh n a a S MS w l l o p n p T D x o x I E i E N ( t t&n (

U s c o ee i gi r 2 rT rnt o N u ti a r)

O l r snnern S io eiivEi A A a R a mi a E Fe r atll R c yT x a a p t ngr E rnx na nor t oE enit oesi(