Category:INSPECTION REPORT
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:UTILITY
MONTHYEARIR 05000338/19900231990-10-0909 October 1990 Insp Repts 50-338/90-23 & 50-339/90-23 on 900819-0915. Violation Noted But Not Cited.Major Areas Inspected: Operations,Maint,Surveillances,Operational Event Followup, LER Followup & Evaluation of Licensee self-assessment IR 05000338/19900191990-09-14014 September 1990 Insp Repts 50-338/90-19 & 50-339/90-19 on 900820-24. Violations Noted But Not Cited.Major Areas Inspected: Licensee Radiation Protection Program Consisting of Review in Areas of External & Internal Exposure Control IR 05000338/19900181990-09-11011 September 1990 Insp Repts 50-338/90-18 & 50-339/90-18 on 900718-0818. Violations Noted.Major Areas Inspected:Operations,Maint, Surveillances,Operational Event Followup,Mods,Self Assessment Capabilities & LER Followup IR 05000338/19900201990-09-0606 September 1990 Insp Repts 50-338/90-20 & 50-339/90-20 on 900906.No Violations or Deviations Noted.Major Areas Inspected: Annual Emergency Preparedness Exercise IR 05000338/19900171990-07-27027 July 1990 Partially Withheld Insp Repts 50-338/90-17 & 50-339/90-17 on 900709-13 (Ref 10CFR2.790).No Violations or Deviations.Major Areas Inspected:Physical Security Program for Power Reactors & Security Plan & Implementing Procedures IR 05000338/19900131990-06-27027 June 1990 Insp Repts 50-338/90-13 & 50-339/90-13 on 900514-18 & 29. Noncited Violations Noted.Major Areas Inspected:Radiation Monitoring Sys,Water Chemistry & QC IR 05000338/19900141990-06-22022 June 1990 Insp Repts 50-338/90-14 & 50-339/90-14 on 900604-08.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Unresolved Item Identified During App R Triennial Insp on 880718-22 IR 05000338/19890261989-09-21021 September 1989 Insp Repts 50-338/89-26 & 50-339/89-26 on 890715-0822. Violation Noted.Major Areas Inspected:Plant Status,Maint, Surveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890221989-08-24024 August 1989 Insp Repts 50-338/89-22 & 50-339/89-22 on 890601-0714.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Maint,Surveillance,Esf Walkdown,Operational Safety Verification,Generic Ltr 88-17 & Plant Startup IR 05000338/19890271989-08-22022 August 1989 Insp Repts 50-338/89-27 & 50-339/89-27 on 890731-0804.No Violations or Deviations Noted.Major Areas Inspected: Followup on Licensee Action Re Previous Insp Findings. Weaknesses Noted Re Labeling of Instruments & App R Sys IR 05000338/19892001989-08-0808 August 1989 Safety Sys Outage Mod & Maint Team Insp Repts 50-338/89-200 & 50-339/89-201 on 890508-12 & 22-26.No Violations Noted. Major Areas Inspected:Implementation of Matl & Work Control Sys to Ensure Mod Conformed to Installation Requirements IR 05000338/19890241989-08-0707 August 1989 Insp Repts 50-338/89-24 & 50-339/89-24 on 890710-14.No Violations Noted.Major Areas Inspected:Functional Areas of Emergency Preparedness Program,Including Training,Audit Repts,Distribution of Changes to EPIPs & Staff Augmentation IR 05000338/19890211989-07-27027 July 1989 Insp Repts 50-338/89-21 & 50-339/89-21 on 890613-14.No Violations or Deviations Noted.Major Areas Inspected: Physical Security Program for Power Reactors,Specifically pre-employment Screening & Clearances ML20247D5441989-07-0707 July 1989 Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26. Violation Noted.Major Areas Inspected:Witnessing Containment Integrated Leak Rate Test,Reviewing Test Procedures & Evaluating Test Results IR 05000338/19890121989-07-0707 July 1989 Corrected Pages 1 & 2 to Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26.Violation Noted.Major Areas Inspected:Containment Integrated Leak Rate Test,Test Procedures,Evaluation of Test Results & Previous Items IR 05000338/19890191989-06-30030 June 1989 Insp Repts 50-338/89-19 & 50-339/89-19 on 890605-08.Major Areas Inspected:Solid Wastes,Transportation of Radioactive Matls & Radwaste & Followup on previously-identified Insp Findings IR 05000338/19890201989-06-28028 June 1989 Insp Repts 50-338/89-20 & 50-339/89-20 on 890605-09 & 12-13. No Violations or Deviations Noted.Major Areas Inspected: Results of 10-yr Ultrasonic Exam of Unit 1 Reactor Pressure Vessel & Observation of Inservice Activities ML20246J9231989-06-27027 June 1989 Insp Repts 50-338/89-14 & 50-339/89-14 on 890418-0531. Violation Noted.Major Areas Inspected:Plant Status, Maint,Surveillance,Esf Walkdown,Operational Safety Verification,Operating Reactor Events & LER follow-up IR 05000338/19890091989-06-0909 June 1989 Insp Repts 50-338/89-09 & 50-339/89-09 on 890522-24.No Violations or Deviations Noted.Major Areas Inspected:Primary & Secondary Chemistry,Radwaste Processing,Radioactive Effluents & Environ Monitoring IR 05000339/19892001989-06-0707 June 1989 Insp Rept 50-339/89-200 on 890213-17 & 0227-0303.Potential Enforcement Items Noted.Major Areas Inspected:Evaluation of Planned Design Changes & Mods Against Regulatory Requirements & Licensee Commitments ML20245D5481989-06-0707 June 1989 Insp Repts 50-338/89-11 & 50-339/89-11 on 890403-07. Violations,Deviations & Unresolved Items Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97, Instrumentation for Light Water Cooled Nuclear Power.. IR 05000338/19890171989-06-0606 June 1989 Partially Withheld Insp Repts 50-338/89-17 & 50-339/89-17 on 890501-05 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Core Insp Program. Noncited Violation Re Improper Badging Noted ML20244E5611989-06-0606 June 1989 Insp Repts 50-338/89-18 & 50-339/89-18 on 890515-19. Violations Noted.Major Areas Inspected:Areas of Inservice Insp - Observation of Work & Work Activities IR 05000338/19890131989-06-0202 June 1989 Insp Repts 50-338/89-13 & 50-339/89-13 on 890418-20. Violations Noted.No Deviations Identified.Major Areas Inspected:Areas of Welding safety-related Components & Review of Reactor Vessel 10-yr Ultrasonic Exam Program ML20245D3511989-06-0202 June 1989 Insp Repts 50-338/89-15 & 50-339/89-15 on 890501-05. Violation Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Areas of External & Internal Exposure Control & Program to Maintain Doses ALARA ML20244B8151989-05-17017 May 1989 Insp Repts 50-338/89-08 & 50-339/89-08 on 890321-0417 & 0425-0503.Violations Noted.Major Areas Inspected:Plant Status,Maint,Surveillance,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890041989-04-26026 April 1989 Insp Repts 50-338/89-04 & 50-339/89-04 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Seismic Analyses for as-built safety-related Piping Sys Per IE Bulletin 79-14 IR 05000338/19890101989-04-17017 April 1989 Insp Repts 50-338/89-10 & 50-339/89-10 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Safety Sys Outage Mod Insp Followup ML20245C0071989-04-13013 April 1989 Insp Repts 50-338/89-05 & 50-339/89-05 on 890320-24. Violations Noted.Major Areas Inspected:Radiation Protection Program in Areas of Organization & Mgt Controls,Training & Qualifications & Internal Exposure Control IR 05000338/19890051989-04-13013 April 1989 Insp Repts 50-338/89-05 & 50-339/89-05 on 890320-24. Violations Noted.Major Areas Inspected:Radiation Protection Program in Areas of Organization & Mgt Controls,Training & Qualifications & Internal Exposure Control IR 05000338/19890031989-04-12012 April 1989 Insp Repts 50-338/89-03 & 50-339/89-03 on 890203-0320. Violations Noted.Major Areas Inspected:Plant Status,Maint, Surveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890071989-04-11011 April 1989 Insp Repts 50-338/89-07 & 50-339/89-07 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Work Observation,Inserice Insp Data Review & Licensee Recovery Efforts from 890225 Hot Leg Plug Failure ML20247F0791989-03-23023 March 1989 Insp Repts 50-338/89-02 & 50-339/89-02 on 890221-23.No Violations Noted.Major Areas Inspected:Licensee Response to Emergency Response Facility Appraisal Open Items & Emergency Preparedness Program Enhancement Items IR 05000338/19880361989-03-21021 March 1989 Insp Repts 50-338/88-36 & 50-339/88-36 on 881231-890202. Violations Noted Re Failure to Take Prompt Corrective Action Re Inadequate Instrument Air Quality.Major Areas Inspected: Plant Status,Maint,Surveillance & LERs IR 05000338/19890061989-03-20020 March 1989 Insp Repts 50-338/89-06 & 50-339/89-06 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Steam Generator Tubing & Reviews of NDE Procedures IR 05000338/19880261989-02-16016 February 1989 Suppl to Insp Repts 50-338/88-26 & 50-339/88-26.Results of Analysis & Evaluation of Health Physics Counting Room Indicate Considerable Improvement Between Licensee & NRC Data for Radionuclides IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000338/19880271988-10-24024 October 1988 Insp Repts 50-338/88-27 & 50-339/88-27 on 880820-0916.No Violations Noted.Major Areas Inspected:Plant Status,Maint, Surveillance & Operational Safety Verification,Including Reviews of Backshift Operations IR 05000338/19880291988-10-19019 October 1988 Insp Repts 50-338/88-29 & 50-339/88-29 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected: IE Bulletin 79-14 IR 05000338/19880301988-10-0707 October 1988 Insp Repts 50-338/88-30 & 50-339/88-30 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected: Requested Actions on NRC Bulletins,Temporary Instruction 2500/26 & Licensee Action on Previous Insp Followup Items ML20155C2181988-09-26026 September 1988 Insp Repts 50-338/88-24 & 50-339/88-24 on 880815-19. Violations Noted.Major Areas Inspected:Emergency Preparedness,Including Emergency Plan & Implementing Procedures & Emergency Facilities Equipment ML20154R3651988-09-20020 September 1988 Insp Repts 50-338/88-26 & 50-339/88-26 on 880815-19.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Measurements & Counting Room QA for in-plant Radiochemical Analyses ML20155A1911988-09-15015 September 1988 Insp Repts 50-338/88-22 & 50-339/88-22 on 880716-0819. Violations Noted.Major Areas Inspected:Plant Status,Maint, Sueveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19880131988-09-13013 September 1988 Insp Repts 50-338/88-13 & 50-339/88-13 on 880718-22. Violation Noted.Major Areas Inspected:Triennial post-fire Safe Shutdown Capability Reverification & Assessment, Including App R Compliance & post-fire Shutdown Capability IR 05000338/19880251988-09-0707 September 1988 Insp Repts 50-338/88-25 & 50-339/88-25 on 880808-12.No Violations,Deviations or Program Weaknesses Noted.Major Areas Inspected:Plant Chemistry,Chemical Corrosion & Pipe Wall Thinning IR 05000338/19880141988-08-18018 August 1988 Insp Repts 50-338/88-14 & 50-339/88-14 on 880627-30.No Violations or Deviations Noted.Major Areas Inspected: Emergency Response Facility & Equipment,Interviews W/Util Personnel & Equipment for Emergency Response Organization IR 05000338/19880211988-08-12012 August 1988 Insp Repts 50-338/88-21 & 50-339/88-21 on 880611-0715.No Violations or Deviations Noted.Major Areas Inspected: Plant Status,Ler,Review of Inspector Followup Items,Monthly Maint Observation & Operator Safety Verification ML20151W7621988-08-0909 August 1988 Insp Repts 50-338/88-18 & 50-339/88-18 on 880606-10. Violations Noted.Major Areas Inspected:External Exposure Control & Assessment,Control of Radioactive Matls, Contamination,Surveys & Monitoring & Solid Waste IR 05000338/19880171988-07-0808 July 1988 Insp Repts 50-338/88-17 & 50-339/88-17 on 880606-10.No Violations or Deviations Noted.Major Areas Inspected:Review & Evaluation of Inservice Insp Data from Unit 2,1987 Refueling Outage & Maint Records Review of Coolant Pump IR 05000338/19880121988-07-0606 July 1988 Insp Repts 50-338/88-12 & 50-339/88-12 on 880420-22.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program & Followup on Licensee Action on Previous Insp Findings 1990-09-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4081998-11-0505 November 1998 Notice of Violation from Insp on 980713-31 & 0921-25. Violation Noted:As of 980712,AFW Pipe Supports Were Not Constructed IAW Details Shown on Design Drawings as Listed ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance ML20155B0671998-10-0202 October 1998 NRC Operator Licensing Exam Repts 50-338/98-301 & 50-339/98-301 (Including Completed & Graded Tests) for Tests Administered on 980817-21 & 31-0903 IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20148B6541997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Operators Failed to Verify That Unit 1 & 2 RCPs 1 Seal Leakoffs & Unit 2 Nr 46 Nuclear Power Range Chart Recorders Were Operational IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7411997-03-21021 March 1997 Notice of Violation from Insp on 970112-0222.Violation Noted:As of 970213,radiation Monitors Installed in Fuel Handling & Storage Locations,Did Not Provide Full Coverage for Area Used for New Fuel Receipt ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970991997-02-21021 February 1997 SALP Repts 50-338/97-99 & 50-339/97-99 for 941225-970111 IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20133G8881997-01-0606 January 1997 Notice of Violation from Insp on 961103-1207.Violation Noted:Licensee Failed to Ensure That Safeguards Area Walls Met Design Basis for Containing Pump Seal Leakage Described in Updated Final Safety Analysis Rept Section 15.4.1.8 ML20133C9491996-12-27027 December 1996 EN-96-098:order Prohibiting Involvement in NRC Licensed Activities Will Be Issued on or About 970102 to Unlicensed Individual Formerly Employed as Contract Millwright.State of VA Will Be Notified ML20149M5831996-12-0202 December 1996 Notice of Violation from Insp on 960922-1102.Violation Noted:Rce Had Not Been Completed for Several Pump 1-CH-P-1A Seal Failures Which Occurred Between 960211 & 0718 IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support PNO-II-96-081, on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed1996-11-13013 November 1996 PNO-II-96-081:on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed ML20134G7971996-10-21021 October 1996 Notice of Violation from Insp on 960811-0921.Violation Noted:Procedure for Irradiated Fuel Damage While Refueling, 0-AP-30 Inadequate ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr ML20134C6401996-09-0909 September 1996 Notice of Violation from Insp on 960810.Violation Noted: on 940802,inadequate Maint Procedure Was Used to Control Maint Activities Affecting Quality IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059L0511994-01-0404 January 1994 EN-94-001:on 940107,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $15,000 Will Be Issued.Action Based on Two Previous Similar Severity Level IV Violations Issued on 901207 & 920515 ML20059B2521993-12-14014 December 1993 Corrected NOV from Insp on 931017-1120,including Response Instruction ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation ML20059B2751993-12-14014 December 1993 Notice of Violation from Insp on 931017-1120.Violation Noted:On 931029,periodic Test Procedure 2-PT-82H Was Not Implemented Correctly & While Performing Step 6.4.5,operator Incorrectly Placed Control Switch Breaker in pull-to-lock IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19933011993-11-12012 November 1993 Exam Rept 50-338/93-301 on 931008-15.Exam Results:Eight ROs & Six SROs Passed Written & Operating Exams.Exam for Both Units IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19933001993-10-20020 October 1993 Exam Repts 50-338/93-300 & 50-339/93-300 on 930825-0910 & 930921-24.Exam Results:Six SROs & Five ROs Received Written & Operating Exams.All Operators Passed Exams IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8521993-08-0505 August 1993 Notice of Violation from Insp on 930620-0717.Violation Noted:Operating Procedure 1-OP-6.5.A Not Implemented Properly,In That While Performing Step 5.3.4.e,operator Failed to Fully Open EDG Exhaust Muffler Bypass Valve ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1581993-07-13013 July 1993 Notice of Violation from Insp on 930509-0619.Violation Noted:Hydrogen Analyzer Determined to Be Inoperable from 930209 to 0509 W/O Implementing Requirements of Action Statement 1999-07-02
[Table view] |
Text
, . _ . , ... .,, ,
-- -
- - - - -
.
- -
.
--
.
,
y a.: y J L. . - . .j
.
.n l ., , ,
.
. -
'
-
' '
,
.' UNITED STATES -
~~
!
[. . sa neof .%*4
' '
' NUCLEAR REGULATORV COMMISSION -
' * .
,p&- :-r .
REGION 11 ,
.
i ;
101 MARIETTA STHEET, : *- I e ' ATLANTA, GEORGI A 30323 a
o7
>
.
k#. . . . . '
'
L m -
l
~
'I Report Nos.: 50-338/87-35 an'd 50-339/87235 ,
'
,c, ,: Licensee': ! Virginia Electric and Power Company ' ,
Ricimond, VA. 23261: 1 R . Docket Nos.: 50-338 and 50-339
'
License Nos.: 'NPF-4 and NPF-7 L Facility Name: North Anna 1 and 2 ;]
- Inspection n te : ' September 28 _0ctober 1, 1987 1
,e Inspecto f /o J J
~
.
emw Date Signed: -l
~Approv d b : e
-
,
,
J. 4 Take, Section. Chief; Date Signed .;
H ials and Processes'Section !
i'ision'of' Reactor Safety SUMMAR Scope: .This routine, announced inspection was in the-areas of installation of'
downcomer flow resistance plates in steam generators (S/G);" installation of'
reactor, vessel head . shielding (RVHS);. Pressurizer safety valve loop seal insulation -oven insta11ation; . licensee ~ action Lon Temporary Instruction (TI)
2515/8 ,
I Results: No violations or deviations were identifie ]
o
-
t
,
.-t L
8711020301 871027-PDR ADOCK 05000338 PD G
- ._-__-_ _ _ _ _ O
'
_
. _ _ - . _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
-____________,
- ,. .s i
-
REPORT. DETAILS
. Persons Contacted Licensee Employees
)
E. W. Harrell, Station Manager i
- M. L. Bowling, Jr., Assistant' Station Manager .!
- J. A. Stall, Superintendent: Technical Services i L. N. Hartz, Engineering Supervisor, Inservice Inspection (ISI)
- J. E. Wroniewicz, Supervisor Site Nuclear Engineer'ng G. Harkness,' Licensing Coordinator ,
- J. Leberstien, Licensing Engineering j
- F. T. Termine11a, Quality Centrol Supervisor _
-
l E. Taylor, Project Engineer, Steam Generator Downcomer Flow Resistanc H. W.-Burruss, Project. Engineer, Vessel Head Shield Other licensee employees contacted included construction craftsmen, J engineers, technicians, operators, mechanics, security force members, and' 1 office personne l Other Organizations Westinghouse, (W) Nuclear Services Integration Division F. T. Swartz, Technical Director J. Tepley, Outage Coordinator J. Marburger, QA Lead Engineer Other licensee employees contacted included QC/QA inspectors, technicians, ;
and office personne I NRC Resident Inspectors'
J. Caldwell, Senior Resident Inspector L. King, Resident Inspector '
- Attended exit interview Exit Interview ,
The inspection scope and findings were summarized on October 1, 1987, with j those persons indicated in paragraph 1 above. The ins)ector described the areas inspected and discussed in detail the inspection finding No dissenting comments were received from the license The licensee did not identify as proprietary any of the materials provided to or reviewed bv the inspector during this inspectio i i _ _
,
i l
2 .!
l Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspectio . Unresolved Items '
Unresolved' items were not identified during this inspectio . Temporary Instructions (TI) Units 1 and 2 (25584) j TI 2515/84, . Verification of Compliance With Order for Modification of i{
Licensee Primary Coolant System Pressure Isolation (Event) Valves the, 1 Reactor Safety Study (RSS), WASH-1400, identified in a PWR an intersystem l loss .of coolant accident (LOCA) that a significant contributor to risk of 1 core melt accidents (Event V). The design examined in the RSS contained in-series check valves isolating the high pressure primary coolant system i (PCS) from the; low pressure injection system-(LPIS) piping. The scenario- l which leads to the Event V accident _is initiated _ by the failure of these check valves to function as a pressure isolation barrier 'against reactor coolant system (RCS) pressur This 'causes an overpressurization and rupture of - the LPIS low pressure piping which results in a LOCA that bypasses containmen To better define the Event V concern, all light water reactor licensees were requested by letter dated February 23, 1980, to provide specific information on such valve configurations in accordance with 10 CFR 50.54(f).
In addition, licensees were asked to perform individual check valve leak testing before plant startup after the'next scheduled outag ,
{
Based on licensee responses and the ongoing unsatisfactory operational j experience at several plants, the NRC staff concluded that a valve- 1 configuration of concern existed; meaning that, when pressure isolation was provided by two check valves in-series, and when failure of one valve in the pair can go undetected for a substantial length of time, verifica-tion of valve integrity was aquired. The staff concluded that, since these valves are safety-related, they needed to be tested periodically to ;
ensure low probability of gross failure, as a result, the staff determined l that periodic examination of check valves was required to be undertaken by i the licensees to verify that each valve was seated properly and func- l tioning as a pressure isolation device. Such testing was intended to reduce the overall risk of an inter-system LOC On April 20, 1987, the Commission issued an Order for Modification of License Concerning Primary Coolant System Pressure Isolation Valves, to i specified PWR and BWR plants, requiring that the above described testing be implemente This Order included a Safety Evaluation Report (SER) and i Technical Specification insert pages to require leak rate testing of Event V pressure isolation valve i
_ _ - _ - _ _ _ _
_ __ _
il* .
i +
TI 2515/56 was issued on - June 1,1981, for followup inspection of ;
implementation of the Event V orders. It expired December 1983. The i present TI 2515/34, is . intended to verify satisfactory completion of licensee actions to implement the periodic testing of Event V valves as required by the aforementioned Orde i Within these areas, the below listed valves were selected at random for a review of test records and compliance with actions required by the subject'
Order and TI 2515/84. The valves are listed in Table 3.4-1 of North Anna's T Reactor Coolant System Pressure. Isolation Valves ;
Unit 1 t
System Valve N j Low Head Safety Injection to Cold Leg j
. Loop-1 1-SI-83/1-SI-195 i Loop-2 1-SI-86/1-SI-197' (
Loop-3 1-SI-86/1-SI-199 l Unit 2 Low' Head Safety Injection to Cold Legs 2-SI-91/2-SI-99/2-SI-105 Low Head Safety Injection to Hot Leg 2-SI-128 J Accumulator Discharge Check Valves 2-SI-170 1 Residual Heat Removal Isolation Valves MOV-2700/MOV-2701/M0V-2720A Low Head Safety Injection to Cold Legs and Hot Legs MOV-2890A, B, C, & D This inspection effort included review of: ' the plant's Technical Specifi-cation (TS) 3.4.6.2.2 Reactor Coolant Operational leakape rates and 1 limiting conditions for operation; a copy of the licensee s Event V Order I and the original SER, procedure changes and records of hardware modifica- )
tions as applicabl I The procedure for this leak test is PT-61.4, "RCS Pressure Isolation Valve Leakage Test." This procedure was reviewed to verify that it is consis- l tent with TS requirements including: ' An acceptable test method is use This would include a direct volumetric leakage rate measurement or other equivalent means capable of- demonstrating that leakage rate limits given in the TS are not exceede The test procedure ensures that leakage rates obtcined are for l individual valves rather than for combined component l
= _ . _. __ -
. - _-_- -
.
, .-
.;q i
4 The test' procedure requires that leakage rates received at ' test 1 pressures .1ess than the maximum potential pressure differential- '
across the valve be adjusted by assuming leakage to be directl proportional to the pressure dit'ferential to the-one-half power as noted in the SER which accornpanies the Order, d .' Acceptance criteria stated in the test procedure are in accordance with the T Verify that the procedure identifies required corrective actions-in l event leakage rate results are unacceptabl l For the valves: listed above, the inspector reviewed records of test completed during previous outages' for each of the two units as listed belo Unit 1 Date Tests and Leak Rates in Gallons Per Minute (GPM)
Va1ve 6/14/87 9/10/86 12/19/85 9/15/84 1-SI-195 0 - - -
1-SI-197 0 - - -
1-SI-199 0 - - - <
1-SI-83 0.027 0 0 0 1-51-86 0.032 0 0 0.191 ,
1-51-89 0.125 0 0 0.039 !
1-SI-95 0 -
0.08 -
l 1-SI-99 0 - -
0.02 1-SI-103 0 - - -
1-SI-209 0 - - -
1-SI-211 0 - - -
Unit 2 5/30/87 3/26/86 1985 4/6/84 10/25/84 11/1/84 12/13/84 2-SI-170 0 0 * 0.699 0.0114 0 0.345 MOV-2720A 2-SI-91 0 0 *
2-SI-99 0 0 *
2-SI-105 0 0 *
2-51-128 0 0 *
q
.
_ . _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- - - - _ _ . - . __ _ - _ _ _ -
,
'
,
.: .
,
5 1 l
I 5/30/87 3/25-31/86 1985 10/24/84 4/5/84 l
MOV-2890A 0.00076 0 * - '-
l MOV-2890 .0015 0 '* - -
MOV-28900 0 0 * 0 0.031 !
MOV-28900 0 0 * 0 .0.031 1 2-MOV-2700' 2.98 0 * - -
2-MOV-2701 * - -
i
)
' Discussions with the cognizant engineer disclosed that none of the subject isolation valves failed leak rate acceptance criteria of I gpm stipulated ,1 in the TS and, therefore, no repair-work has been performed during the l time frame inspected. In addition, test data was reviewed and verify that:
.
.
l Test records contain major test data including upstream and down- i stream pressures, leak volume per unit time (or equivalent), leakage rate adjustment calculations when required, and leakage rate accept-' ,]
ance criteria based on trending from previous tests where applicabl !
t Recorded test frequency is in accordance with T l I As found leakage (i.e. , prior to valve stroking, modification, adjustments,.etc.) is recorded, Leakage rates trending has been documented and adequately evaluated by the licensee in accordance with the TS requirement, No test data anomalies exist which indicate improper or inaccurate- .
testin ' Adequate corrective actions were taken for valves not meeting the acceptance criteri Within these areas, the inspector noted that although corrective action is taken when designated isolation valves fail to meet leak rate acceptance criteria, subject procedure PT-61.4 does not specifically stipulate that-such action be taken. This observation was discussed with the cognizant 4 engineer who took immediate action to revise the procedure to include ;
corrective action requirements. This matter was identified as an i inspector followup item (IFI) for tracking purpu:ct. Corrective Action for Valves not meeting Acceptance Criteria 338, 339/07-35-01. Except for this IFI no violations or deviations were identified.
- . - _ - -
ej *
l l
.
6'
!
'
6.- . Modifications (37700), 4
'
' Installation of Downcomer Flow Resistance Plates (DFRP) . in. Steam Generators, Units 1 and 2 (37700) }
. .
. . !
The DFRPs are being installed in the steam generators (SGs) in order to reduce mass flow through the SG tube bundle and, therefore, reduce
.the potential for fluid elastic instability of steam generator tube ,
Model 51 steam generators were originally designed and placed in
,,* service with DFRPs which were subsequently removed by W in an attemp to . increase . flow through the tube bundle and ultimately reduce the potential for sludge depositfor, in certain areas of the tube shee !
The DFRPs are located in the upper part of the downcomer annulus between the tubes bundle wrapper and the SG shell. They consist of 20' circular segments, each measuring 27"x13"x3/4" with two attached j gussets for welding it to the wrapper. Each plate segment had eight !
(8) drilled holes approximately 1-1/2 inches in diameter. The plate material was identified as ASTM A285 Grade C. Controlling documents-included:
EWR 87-572, " Installation of Downcomer Flow Resistance Plates in Steam Generators" i
DCP 87-026-3, " Steam Generator Flow Resistance Plate Installa- '
tion North Anna 1 and 2" Addition of tne DFPRs are regarded as non-safety modifications to q safety-related equipment as part of the W steam generator improve- 1 men Westinghouse stress analysis / evaluation used ASME Section III i Subsection NG as a guide in calculating stress limits. According to l this analysis, stress loads resulting from the addition of DFRP j assembly do not exceed original design load levels. North Anna's FSAR section impacted by this design change / modification and non- l scheduled for revision include: 5.5.2.3.5 (changing the recirculation 1 ratio and internals); 15.2.8, 15.2.9, 15.4.3 and 15.4.22 (impact.on i the results of certain accidents. The licensee's evaluation showed that there were no unreviewed safety questions involved in this modificatio j
.In addition to the aforementioned controlling documents, the inspector reviewed the following W field documents for technical content and compliance with referencing code requirement Welder Qualification Specification
-
WQS 1000, Rev. 8 Shielded Metal Arc Welding of Carbon (P-1)
and Low Alloy (P-3) Steels with Carbon (P-4)
Low Alloy (F-4) Steel Covered Electrodes l
l l
_-- ._
g - -
A
m u 7 ,
y c -
p Welding Engineering Procedure !
! -
WEP 200,'Rev. A Welding Carbon and Low Alloy Steel by the l Shielded Metal Arc Process PQR-053 9/20/82; Ref.'ASME Sections IX and l-II NB
' -
WEP 310, Rev. A Weld Filler Metal Control for Product
. Application ,
i
-
NDE-130, Rev. 0 Visual Examination L
-
-NDE-310, Rev. O Magnetic Particle Examination Ref. ASME y Section III and V (80W81) 4 Applicable Drawings
N-8726-3-V-800, Rev. 0 NG Units 1 and 2 0FRPs Installation N-8726-3-V-801, Rev. 0 NG Units 1 and 2 DFRPs N-8726-3-V-802, Rev. O W S/G (Vertical), General Assembly and Final Fabrication ,
Other quality records reviewed included pert.onnel qualifications and !
material document These recorders were as follows:
i
-'
DFRPs: W QR#14189, Rev. C and 13312, Rev. O, Certificate of i Conformafice - Radform Tool Co. Heat #65561, #64706, #50354, i
- U505 Welding Electrodes: !
-W QR#9832, Rev. 9 7018 1/8"0 HT-401C4481 Atom Arc 7018 3/32"0 HT-412K7107 Atom Arc j W QR#12546, Rev. 3 7018 3/32"0 HT-20791 Teledyne Mckay Magnetic Particle Powder:
W QR#35.34, Rev. O Batch #E66010, type 8A Red Pcvder 1
Welder Qualifications: M151, M159, M139, M147, M146 and M83 Visual Examiners:
Vi/ Level II M.J.S., R.J.H., L.D.M., and J. l l
.-
_, _ ._
V' :
.
._
.
'
i
'
-
8 i
.-
L' Nonconformance reports (NRC) generated.during this modification which l were reviewed for completeness, accuracy and adequacy of disposition 1 l
'
,
.
included VRA-87-00026, VRA-87-00027, VRA-87-00028._ Of these, two?
involved inadvertently generated arc strikes on the transition cone - !
area of the shell of SGs A and B, respectively, these were being repaired under ASME Section XI repair program. The third NCR related to some small items dropped through the staging down the S/GLannulu !
Disposition .of these NCRs was being pursued by- the licensee._ . On .
September 30,1987,'the inspector entered _S/Gs A and C and observed
.
'
>
the field and shop fabricated welds for appearance and workmanship quality, j
j
!
, Within these areas, no violations or deviations were identifie j
.
b .- Reactor Pressure Vessel (RPV) Head Radiation Shield Units 1 and 2 In an; effort to reduce current high men-rem expenditures resulting from work performed on the RPV head area, the licensee installed
-
permanent. reactor vessel head radiation shielding fixtures in each : !
unit. Each shield is a six foot high cylinder made of one inch: thic q ASTM A36 Grade A steel plate material which is permanent 1y' attached ~ i to a circular structural member and supported by special mounting !
devices attached to the three existing RPV head lifting-rig lug j The shields were designated as QA category 1, Group The licensee !
"
will revise North Anna's FSAR Section 5.1.1 to include the shiel c By stress analysis calculations W has shown that the additional -
weight on the RPV head lightning rig2 does not violate NUREG-0612 4 stress limits. Moreover W has indicated that their evaluation showed !
that the additional weight of 11,000 lbs. will have a minimal affect on the RPV supports, lugs and control rod mechanism. The. work was performed under design change DCP-85-06, Rev.1 and installation procedure 43-HWB-2019 The inspector selected, Unit 2 shield for )
review of quality records. Documents reviewed purchase order ~
90292-D, Drawing No.1777E43, Rev. 5, the manufacturers certificate of compliance, VEPCOs certificate of conformance, certified material ]'
s test reports and deviations notices. At the time of this inspection, !
both shields had been installed and access restrictions imposed by ,
health physics precluded a close visual examination at this tim J Within the areas examined, no violations or deviations were identi-fied, j Safety Valve Loop Seal Insulation Ovens Units 1 and 2 This work effort was performed as a followup to that documented in Inspection Report No. 338, 339/87-12 and pertains to modifications i)
performed to qualify piping and supports for Design Basis Transient l and accident conditions. The modifications became necessary when j stress analysis on pressurizer safety and relief valves piping showed the original piping analyses did not consider the fluid transient loads associated with a water slug passing through the syste _ - _ - _ _ _ _ - - _ ___ _-_ ..
[
Results of a subsequent analysis of safety valve transients showed unacceptable fluid transient loads on piping and supports downstream of the safety valves assuming " cold" loop-seal water temperatures upstream of the safety valve This work effort covers the licensee's fix for maintaining loop seal water temperature > 400 In order to reach and maintain the water in the logs seals at the I aforementioned temperature, the licensee installed metal (stainless I steel) reflective thermal insulation boxes which enclose the safety valve loop seal piping. The controlling document for this modifica-l tion was 0C-84-69-1, Pressurizer Safety Valve Loop Seal Insulation The insulation boxes were manufactured by Diamond Power
'
Oven Speciality Company per VEPCOs specification NAS-2017, " Metal
. Reflective Thermal Insulation Boxes for Pressurizer Loop Seal l Piping." The specification provided requirements for the engineering design, fabrication testing and shipment of the insulation. They were seismically designed and classified as non safety-related category Quality Group VEPC0's engineering review and safety analysis report indicated the design change did not involve an Unreviewed Safety Question" as defined in 10 CFR 50.5 Proper function of the insulation ovens will be verified through temporarily installed and strategically located thermacouple The. inspector reviewed available fabrication quality and installation records for compliance with specification requirements. A field inspection was performed in Unit 1 to observe the installed ovens and the thermocoupl Within the areas exanined, no violations or deviations were identi-fied.