IR 05000338/1989012

From kanterella
Jump to navigation Jump to search
Corrected Pages 1 & 2 to Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26.Violation Noted.Major Areas Inspected:Containment Integrated Leak Rate Test,Test Procedures,Evaluation of Test Results & Previous Items
ML20248D264
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 07/07/1989
From: Belisle G, Whitener H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20248D262 List:
References
50-338-89-12, 50-339-89-12, NUDOCS 8908100327
Download: ML20248D264 (2)


Text

g_

.

- --

- -

,

>

'

,

s

,

,

.

,

ENCL 05URE

~

[

$i9tTED STAf ris 1 '

- 'b

>(Mqg

'

,

NUCt.LMt REGULATC RY COMM

^

s

..

ESION

)

'y.O

-

, ce p

  • [ ~ /, fj$ -

,

' NEG80N 11

'

g.

..,

,

4-

,

. {

.101 MAmETTA STREET,N.W.

!

% g#

A4 p

.. ATL ANTA, CEOHGI A 30373 y

.{

!

% b.. /

,

j i

Report'Nos.: 50-338/89-12 and 50-339/89-12

~

I-

' Licensee: ' Virginia Electric and Power. Company l

'

. Glen Allen, VA 23060

.i l

>

Docket Nos.: 50-338 and 50-339

,

License Nos.:

NPF-4 and NPF-7

.,.

Facility Name: ' North Anna 1 and 2 L

Inspection Conducted: April,12-14 and 20-26,1989 inspector *,

b ]!]k WJ l!]IgnedM H. L. Whitener Date S'

!

Accolapanying Personnel:-

S. M. Shaeffer, April 12-14, 1959

{

s

,

kh 9r 4,[ 6'

7/ ~7#.f

.

' Approved by:C A. Belisle, Chief Date< Signed

!

Test Programs Section

!

Engineering-Branch

Division of Reactar Safety i

,

SUMMARY Scope:

u This routine, announced inspection was in the areas of witnessing the contain-

-

ment integrated lesk rate test, reviewing test procedures, evaluating test

'

results, and following up on previously identified items pertaining to leak

'

3.

rate testing.

,

,f Results:

,

'In the' arear, inspected, one violation was identified:

Failure to perform local

.

' leak rate (Type C) tests on certain containment isolatien valves in a manner which is as t. conservative as applying pressure in the direction the valve must

perform its - isolation fuAction (paragraph 4).

Additional problem ar6as identified during this inspection include:

,

An. evaluation (Engineering Study 88-31) which concludes that Type C tests

on globe; valves performed by applying test pressure in a direction

-

oppot,ite to the accident pressure (reverse direction) and which assists in seating the valves is conservative (paragraph 3).

Repair. or adjustment to the containment bour<dary prior to the integrated

L(Type A). leak rate test without adjustment for the "as found" leak rate (paragraph 2.b.(5)).

8908300327 890731 i

FDR ADCU 05000338

,

{

Q PDC

,

,

-

___x_________

_ _ _ -

- _ _ _ _ _

,

,,

,a.-,,,

. f ' '..'

.

,.

L A weakness in the Type A test procedure 2-PT-61.1 related to penetration

draining (paragraph 2.b(3)).

'

The inspector concluded that the Type A test was acceptable; however, increased management attention is needed to. reduce the number of deviations to the test (paragraph 2.b(1)) and establish stable temperature control during the test

. paragraph 2,b(4)).

(

..

,

_ _ _ _ _ _ _ - _ _ _. _ _ _ _ _ _. _ _ _ _ _ _ _

.___.m._.

_ _ _.