IR 05000338/1989012
| ML20248D264 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 07/07/1989 |
| From: | Belisle G, Whitener H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20248D262 | List: |
| References | |
| 50-338-89-12, 50-339-89-12, NUDOCS 8908100327 | |
| Download: ML20248D264 (2) | |
Text
g_
.
- --
- -
,
>
'
,
s
,
,
.
,
ENCL 05URE
~
[
$i9tTED STAf ris 1 '
- 'b
>(Mqg
'
,
NUCt.LMt REGULATC RY COMM
^
s
..
ESION
)
'y.O
-
, ce p
- [ ~ /, fj$ -
,
' NEG80N 11
'
g.
..,
,
4-
,
. {
.101 MAmETTA STREET,N.W.
!
% g#
A4 p
.. ATL ANTA, CEOHGI A 30373 y
.{
!
% b.. /
,
j i
Report'Nos.: 50-338/89-12 and 50-339/89-12
~
I-
' Licensee: ' Virginia Electric and Power. Company l
'
. Glen Allen, VA 23060
.i l
>
Docket Nos.: 50-338 and 50-339
,
License Nos.:
.,.
Facility Name: ' North Anna 1 and 2 L
Inspection Conducted: April,12-14 and 20-26,1989 inspector *,
b ]!]k WJ l!]IgnedM H. L. Whitener Date S'
!
Accolapanying Personnel:-
S. M. Shaeffer, April 12-14, 1959
{
s
,
kh 9r 4,[ 6'
7/ ~7#.f
.
' Approved by:C A. Belisle, Chief Date< Signed
!
Test Programs Section
!
Engineering-Branch
Division of Reactar Safety i
,
SUMMARY Scope:
u This routine, announced inspection was in the areas of witnessing the contain-
-
ment integrated lesk rate test, reviewing test procedures, evaluating test
'
results, and following up on previously identified items pertaining to leak
'
3.
rate testing.
,
,f Results:
,
'In the' arear, inspected, one violation was identified:
Failure to perform local
.
' leak rate (Type C) tests on certain containment isolatien valves in a manner which is as t. conservative as applying pressure in the direction the valve must
perform its - isolation fuAction (paragraph 4).
Additional problem ar6as identified during this inspection include:
,
An. evaluation (Engineering Study 88-31) which concludes that Type C tests
on globe; valves performed by applying test pressure in a direction
-
oppot,ite to the accident pressure (reverse direction) and which assists in seating the valves is conservative (paragraph 3).
Repair. or adjustment to the containment bour<dary prior to the integrated
L(Type A). leak rate test without adjustment for the "as found" leak rate (paragraph 2.b.(5)).
8908300327 890731 i
FDR ADCU 05000338
,
{
Q PDC
,
,
- -
___x_________
_ _ _ -
- _ _ _ _ _
,
,,
,a.-,,,
. f ' '..'
.
,.
L A weakness in the Type A test procedure 2-PT-61.1 related to penetration
draining (paragraph 2.b(3)).
'
The inspector concluded that the Type A test was acceptable; however, increased management attention is needed to. reduce the number of deviations to the test (paragraph 2.b(1)) and establish stable temperature control during the test
. paragraph 2,b(4)).
(
..
,
_ _ _ _ _ _ _ - _ _ _. _ _ _ _ _ _. _ _ _ _ _ _ _
.___.m._.
_ _ _.