U.S. NUCLRAR REGULATORY COMMISSION

REGION II

.

Docket Hos: 50-338 and 50-339 License Nos NPF-4 and NPF-7 l Report No: 97-10 l

Licensees Virginia Electric and Power Company Facility: North Anna Power Gtation Location: State Route 700 Mineral, VA 23117 Dates: September 22-23, 1997 Inspector: D. Thompson, Safeguards Inspector Approved by: Caudie A. Julian, Acting Chief Special Inspections Branch Division of Reactor Safety

!

9710160062 971007 PDR ADOCK 05000338 G PDR Demannemenshemuth

= tars % %

bformation. When neparated h ' * ~ * = = =

_

. RIBCUTIVE wUMMARY North Anna Power Station NRC Inspection Report 50-338/339/97-10 This routine announced inspection was conducted in the area of plant support by a regional safeguards specialis The specific area evaluated was the Malevolent Use of Vehicles at Nuclear Power Plant * The inspector concluded that the vehicle barrier system, using a combination of gates, jersey barriers, bollards, buildings, and terrain, was an acceptable barrier capable of stopping a design basis vehicle traveling at the established speed prior to the vehicle penetrating the protected area

_ perimeter and causing damage to vital equipmen The

inspector concluded that the engineering staff had performed l an excellent analysis of the vehicle threat and had l installed a superior vehicle barrier to counter the

'

threat.(S2.5.1)

  • The inspector determined that the licensee had installed the '

vehicle barrier at a distance that would preclude an explosion from a bomb-laden vehicle from causing damage to vital targets required for the safe shutdown of the reacto (S2.5.2)

  • Based on the inspector's review of the vehicle barrier system procedures and in discussion with the licensee, the inspector concluded that the plans and procedures were acceptable for implementing the vehicle barrier syste (S2.5.3)

%v==eme%