Partially Withheld Insp Repts 50-338/90-17 & 50-339/90-17 on 900709-13 (Ref 10CFR2.790).No Violations or Deviations.Major Areas Inspected:Physical Security Program for Power Reactors & Security Plan & Implementing Procedures
ML20056A052
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 07/27/1990
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20056A050 List:
References
50-338-90-17, 50-339-90-17, NUDOCS 9008030133
Download: ML20056A052 (1)


Text

{{#Wiki_filter:5AFEGU ARDS INFORMAT!ON ' UNITED STATES -

  • ' 8 @ 400q'o NUCLEAR REGULATORY COMMISslON

- . y

REGION 11 t n ' g y 101 MARIETTA STREET,N.W,

ATLANT A. GEORGI A 30323 \\..+ /

S

  • +

, l Report Nos.: 50-338/90-1 A and 50-339/90-l'( , l Licensee: Virginia Electric and Power Company' Glen Allen, VA 23060 Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7 Facility Name:. North Anna 1 and 2 Inspection Cond cted July 9e13, 990 Inspector: / D[[ Nf[//[ A. Tillman,' Mjuards Inspector Date Signed Accompanying Pers'o 1: D) Thompson,SafeguardsInspector Approved by: ,<W, ll2M ~7/l7/fd (a ') D. clear Materials Sdfaty and Safeguards Branch McGuire, Chief / \\- Q6teS/gned . .]JLJ Division of Radiation Safety and Safeguards SUMMARY i Scope: ' This routine unannounced inspection was conducted in the areas of: Physical Security Program for Power Reactors; Security Plan and Implementing P_rocedurest.

i Security System Power Supply; Personnel Training and Qualification General Requirements; Safeguards Contingency Plan Implementation and Physical ' Protection _ Safeguards Information.

In addition 'the licensee's ~ actions to upgrade security systems and equipment, and. investigation of allegations of drug abuse were reviewed.

Results: ' In the areas inspected, violations or deviations were not identified.

I'ispection findings confirmed continued improvement in the effectiveness of the Security Program.

Security personnel appeared to be motivated and professional-in their approach to duty performance.

The recent procurement of laser equipment for use in conducting contingency training and the programmed upgrade of the-security computer and access control equipment will further enhance security program effectiveness.

The change in security shift scheduling to 12-hour shif ts of-4-days on duty and 4-days off appears to have further improved morale, 9008630133 900730 PDR ADOCK 03000338 Q PDC SAFEGU ARDS INFORMATION ggggg; ~