{{#Wiki_filter:5AFEGU ARDS INFORMAT!ON ' UNITED STATES -
- ' 8 @ 400q'o NUCLEAR REGULATORY COMMISslON
- . y
REGION 11 t n ' g y 101 MARIETTA STREET,N.W,
ATLANT A. GEORGI A 30323 \\..+ /
S
- +
, l Report Nos.: 50-338/90-1 A and 50-339/90-l'( , l Licensee: Virginia Electric and Power Company' Glen Allen, VA 23060 Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7 Facility Name:. North Anna 1 and 2 Inspection Cond cted July 9e13, 990 Inspector: / D[[ Nf[//[ A. Tillman,' Mjuards Inspector Date Signed Accompanying Pers'o 1: D) Thompson,SafeguardsInspector Approved by: ,<W, ll2M ~7/l7/fd (a ') D. clear Materials Sdfaty and Safeguards Branch McGuire, Chief / \\- Q6teS/gned . .]JLJ Division of Radiation Safety and Safeguards SUMMARY i Scope: ' This routine unannounced inspection was conducted in the areas of: Physical Security Program for Power Reactors; Security Plan and Implementing P_rocedurest.
i Security System Power Supply; Personnel Training and Qualification General Requirements; Safeguards Contingency Plan Implementation and Physical ' Protection _ Safeguards Information.
In addition 'the licensee's ~ actions to upgrade security systems and equipment, and. investigation of allegations of drug abuse were reviewed.
Results: ' In the areas inspected, violations or deviations were not identified.
I'ispection findings confirmed continued improvement in the effectiveness of the Security Program.
Security personnel appeared to be motivated and professional-in their approach to duty performance.
The recent procurement of laser equipment for use in conducting contingency training and the programmed upgrade of the-security computer and access control equipment will further enhance security program effectiveness.
The change in security shift scheduling to 12-hour shif ts of-4-days on duty and 4-days off appears to have further improved morale, 9008630133 900730 PDR ADOCK 03000338 Q PDC SAFEGU ARDS INFORMATION ggggg; ~