Notice of Violation from Insp on 931017-1120.Violation Noted:On 931029,periodic Test Procedure 2-PT-82H Was Not Implemented Correctly & While Performing Step 6.4.5,operator Incorrectly Placed Control Switch Breaker in pull-to-lock
ML20059B275
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/14/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20059B264 List:
References
50-338-93-27, 50-339-93-27, NUDOCS 9401040064
Download: ML20059B275 (1)


Text

.

ENCLOSURE 1 NOTICE OF VIOLATION Virginia Electric and Power Company Docket No. 50-339 North Anna Unit 2 License No. NPF-7 During an NRC inspection conducted on October 17 - November 20, 1993, a violation of NRC requirements was identified.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:

Technical Specification (TS) 6.8.1.c requires that written procedures be established, implemented and maintained covering surveillance and test.

activities of sa fety-related equipment. The licensee's Periodic Test Procedure 2-PT-F2H, 2H Evergency Diesel Generator Slow Start Test, revision 14, ptovides ins; ructions for testing Emergency Diesel Generator 2H.

Procedure !-PT-82H, Step 6.4.5, for unloading the emergency diesei generator states to open breaker 25H2.

Contrary to the above, on October 29, Periodic Test Procedure 2-PT-82H was not implemented correctly. While performing step 6.4.5 (opening breaker 25H2), the operator incorrectly placed the control switch for the breaker in " pull-to-lock." This rendered Emergency Diesel Generator 2H inoperable from approximately 1:20 a.m. until 7:55 a.m.

i This is a Severity Level IV violation (Supplement I).

Dated at Atlanta, Georgia this//ffhdayofDecember1993 r

9401040064 931214 PDR ADOCK 05000338 G