IR 05000338/2013001

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - Report 05000338/2013001 and 05000339/2013001
ML14063A171
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/04/2014
From: Mark King
NRC/RGN-II/DRP/RPB5
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR-13-001
Download: ML14063A171 (6)


Text

UNITED STATES rch 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - REPORT 05000338/2013001 AND 05000339/2013001

Dear Mr. Heacock:

On February 19, 2014, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of North Anna Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2013, through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, North Anna Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at North Anna Power Station, Units 1 and 2, during the most recent quarter, was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, the NRC plans on conducting two non-ROP baseline inspections which include an Operating License Initial Exam and an audit. An NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The onsite component has been scheduled for the week of May 19, 2014. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4511 with any questions you may have regarding this letter.

Sincerely,

/RA/

Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7 Enclosure: North Anna Inspection/Activity Plan (03/01/2014 - 06/30/2015)

cc distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE SON /RA/ Via email MFK /RA/

NAME SNinh GKolcum MKing DATE 02/27/2014 02/28/2014 03/04/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to David Heacock from Michael F. King dated March 4, 2014 SUBJECT: ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - REPORT 05000338/2013001 AND 05000339/2013001 Distribution w/encl:

C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMNorth Anna Resource Institute of Nuclear Power Operations (INPO)

ROP Assessment

Page 1 of 2 North Anna 03/04/2014 08:45:58 Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PLANT MODDIFICATIONS INSPECTION 3 1, 2 03/31/2014 04/04/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 04/14/2014 04/18/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications OL EXAM - INITIAL LICENSE EXAM PREP 3 1 05/19/2014 05/23/2014 V23425 NORTH ANNA/JUNE 2014 INITIAL EXAM AT POWER FACILITIES EP - EP EXERCISE 3 1, 2 06/01/2014 07/11/2014 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 07/07/2014 07/11/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1, 2 07/07/2014 07/11/2014 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM WEEK 1 3 1 06/16/2014 06/20/2014 V23425 NORTH ANNA/JUNE 2014 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM WEEK 2 3 1 06/23/2014 06/27/2014 V23425 NORTH ANNA/JUNE 2014 INITIAL EXAM AT POWER FACILITIES HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 08/25/2014 08/29/2014 IP 7111107T Heat Sink Performance RP - RP OCCUPATIONAL BASELINE 3 1, 2 09/08/2014 09/12/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/08/2014 09/12/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/08/2014 09/12/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/08/2014 09/12/2014 IP 71124.04 Occupational Dose Assessment 1, 2 09/08/2014 09/12/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/08/2014 09/12/2014 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 09/15/2014 09/19/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK2 2 1, 2 09/22/2014 09/26/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/22/2014 09/26/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/22/2014 09/26/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/22/2014 09/26/2014 IP 71124.04 Occupational Dose Assessment 1, 2 09/22/2014 09/26/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/22/2014 09/26/2014 IP 71151 Performance Indicator Verification SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 09/22/2014 09/26/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 North Anna 03/04/2014 08:45:58 Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TFPI - TRIENNIAL FIRE PROTECTION 4 1, 2 01/26/2015 01/30/2015 IP 7111105T Fire Protection [Triennial]

1, 2 02/09/2015 02/13/2015 IP 7111105T Fire Protection [Triennial]

PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 02/23/2015 02/27/2015 IP 71152B Problem Identification and Resolution ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 03/23/2015 03/27/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RADIOLOGICAL HAZARDS ANALYSIS 1 1, 2 03/23/2015 03/27/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls RP - RP PUBLIC RAD SAFETY BASELINE 3 1, 2 06/15/2015 06/19/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/15/2015 06/19/2015 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/15/2015 06/19/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 06/15/2015 06/19/2015 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 06/29/2015 07/04/2015 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.