IR 05000338/1987018

From kanterella
Jump to navigation Jump to search
Insp Repts 50-338/87-18 & 50-339/87-18 on 870615-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Radiographs & NDE Acceptance Documentation for Unit 1 Feedwater Replacement Pipewelds
ML20236B765
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 07/17/1987
From: Blake J, Newsome R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20236B753 List:
References
50-338-87-18, 50-339-87-18, NUDOCS 8707290232
Download: ML20236B765 (11)


Text

f p* "f %q'(o.

UNITED SVATES

+

NUCLEAR REGULATORY COMMISSION

. #g

,,.

~

o REGloN ll

$

101 MARIETTA STREET, N W., SUITE 2900

ATLANTA, GEORGtA 30323 o,

'%..... k

Report Nos.: 50-338/87-18 and 50-339/87-18 l

Licensee:

Virginia Electric and Power Company

,

Richmond, VA 23261

Docket Nos.:

50-338 and 50-339 License Nos.:

NPF-4 and NPF-7

)

Facility Name: North Anna 1 and 2 Inspection Conducted:

June 15-19, 1987 Inspector:

lo!.

70'f-87 ate,w_e.-,

R.

so e Date Signed Approved by.

]

7 J F. Bl~ake, Chief Date Signed a) trials and Processes Section Di' vision of Reactor Safety SUMMARY Scope:

This routine, announced inspection was in the areas of review of radiographs and Nondestructive Examination (NDE) acceptance documentation for Unit 1 feedwater replacement pipewelds; review of Units 1 and 2 Maintenance Program Implementation procedures and selected work packages, and corrective and preventive maintenance procedures.

Results: No violations or deviations were identified.

l l

,

8707290232 070721 PDR ADOCK 05000338

,

G PDR l

l

<

l E

.

REPORT DETAILS 1.

Persons Contacted l

Licensee Employees

  • M. L. Bowling, Jr., Assistant Station Manager
  • M. Kansler, Maintenance Superintendent
  • J. A. Stall, Superintendent Technical Services

'

,

V. C. West, Planning Maintenance Supervisor

  • R. F. Driscoll, Manager Quality Assurance

,

'

  • P. J. Naughton, Inservice Inspection (ISI) Engineer
  • G. Harkness, Licensing Coordinator

.

  • J. Leberstien. Engineer Other licensee employees contacted included. craftsmen, engineers, technicians, mechanics, security force members, and office personnel.

NRC Resident Inspectors i

j

  • '. L. Caldwell, Senior Resident Inspector

!

L. King, Resident Inspector j

  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on June 19, 1987, with those persons indicated in the above paragraph.

The inspector described the areas inspected and discussed in detail the inspection findings.

No dissenting comments were received from the licensee The following new item was identified during this inspection.

(0 pen) Unresolved Item 50-338, 339/87-18-01, Specification for System and/or Component Cleanliness Following Maintenance, paragraphs 6.a.(5).

The licensee.did not identify as. proprietary any of the materials provided to or reviewed by the inspector during this inspection.

l l

3.

Licensee Action on Previous Enforcement Matters I

This subject was not addressed in the inspection.

i 4.

Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve violations or deviations.

One unresolved item identified during.tnis inspection is discussed in paragraph 6.a.(5)

,

J

-

-l l

'

.

2 i

l 5.

Feewater System Pipe Replacement, Unit 1

I a.

The inspector reviewed the below listed radiographs of circum-

)

ferential welds in the feedwater system which were produced as a

!

result of pipe replacement for portions of this system.

The welds j

were radiographer by a contractor for the licensee with some of the I

radiographs-being originally interpreted and rejected by the l

contractor.

The licensee's qualified radiographic film interpreter subsequently re-evaluated the radiographs which had been rejected due to possible weld flaw indications.

The licensee's film interpreter, in some case, accepted contractor rejected welds based on the applicable code and acceptance criteria. The applicable Code is ANSI l

B31.1.

Also, in at least two cases, the licensee's film interpreter

!

identified radiographs that had been accepted by the contractor which had rejectable flaw indications.

Following these findings,100% ~of i

the film was re-eveluated by the licensee's film. interpreter.

This

'

inspector reviewed radiographs that were originally rejected by the contractor and subsequently accepted by the licensee and in addition

'

selected a sample of the remaining accepted weld radiographs for review.

The inspectors review of the radiographs selected indicated that the welds were acceptable under the applicable ' acceptance criteria.

b.

The below listed radiographic film was reviewed to determine if radiographic quality was in accordance with applicable Code requirements and to specifically verify the following: penetrometer type, size and placement; penetrometer sensitivity; film density and density variation; film identification; film quality; and weld coverage.

Also, the inspector reviewed the examination records for l

I the listed welds to determine compliance with procedure requirements for examination records and to determine if disposition of the welds radiographer was in compliance with applicable Code and specification

!

requirements.

!

)

LINE DRAWING LOCATION REVIEWED

26" WFPD-6-901 M-100 FW-1 4-0, 3-4, 2-3, 1-2, 0-1 16" WFPD-7-901 M-103 FW-9 0-1, 1-2,'2-3, 3-4, 4-0 l

l 16" WFPD-7-901 M-106 FW-3 0-1, 1-2, 2-3, 3-4, 4-0

16" WFPD-8-901 M-102 FW-8 0-1, 1-2, 2-3, 3-4, 4-0 16" WFPD-8-901 M-102 FW-11 3-0, 2-3, 1-2, 1-0 16" WFPD-12-901 M-101 FW-9 4-0, 3-4, 2-3, 1-2, 0-1 16" WFPD-12-901 M-101 FW-13 4-0, 3-4, 2-3, 1-2, 0-1

1 l

l j

3 16" WFPD-12-901 M-106 FW-1 0-1, 1-2, 2-3, 3-4, 4-0

6" WFPD-14-901 M-101 FW-1A 0-3, 3-6, 6-9, 9-12, 12-0 6" WFPD-14-901 M-101 FW-3 0-1, 1-2, 2-3, 3-0 6" WFPD-10-901 M-102 FW-1 0-3, 3-6, 6-9, 9-12, 12-0 6" WFPD-18-901 M-103. FW-1 0-3, 3-6, 6-9, 9-12, 12-0

'

c.

The inspector reviewed the qualification documentation for both the contractor and licensee radiographer and film interpreters in the following areas: employer's name; person certified; activity qualified to perform; effective period of certification; signature.of employer's designated representatives; basis used for certification; and ' annual visual acuity, color vision examination and periodic decertification.

d.

The inspector reviewed the calibration documentation for the below listed radiographic film interpretation equipment.

Densitometer - Serial No. NQC 2020

-

NBS Film Strip - Serial No. 16973

-

e.

The inspector reviewed the radiographic procedure, RT-1 Rev. O, Appendix 3.0E with addendums 4.0E and 4.0P, in the following areas:

the type of material to be radiographer has been identified; the material and weld surface condition requirements; the material thickness is specified; type of radiation source, effective focal spot or effective source size; film brand, type, and number of films in cassette are identified; minimum source to film' distance: blocking or masking technique, if used; type and thickness of intensifying

,

screens and filters; exposure conditions for procedure qualifi-cations; quality of radiographs - limits on mechanical, chemical, or other blemishes, such as fogging, process marks, scratches, finger marks, loss of detail, or false indications; film density and suf ficient contrast for single and composite viewing; use of densitometers for assuring compliance with film density requirements; system of radiograph identification; use of location markers; methods

,

of reducing and testing for back-scatter; selection and use of penetrameters including: penetrometer placement, including special requirements for single and double wall viewing; nunber of

,

penetrameters; shims under penetrameters; radiographic technique for double wall viewing; and, evaluation and disposition of radiographs.

f.

The inspector reviewed the magnetic particle (MT), liquid penetrant (PT), and visual (VT) examination data, as applicable, for the welds noted above.

The results indicated that no indications had been detected with these examinations.

i

1q

.

,)

4-

!

q

I g.

The; inspector reviewed the qualification documentation for.the below.

listed licensee examiners in Lthe-following areas: - employer's name; person certified;: activity qualified to perform; effective period of-j

,

certification;. signature of employer.'s designated. representatives;

^

basis used for certification;.and annual visual acuity, color l vision

'

,.

' examination and periodic recert.ification.

Method - Level-l

' Examiner PT MT VT i

GAT-II II

-

II'

IIL

'

KJM

-

TRW II II

.

-

II

SRE II

-

III'

JRS

-

-

ABN II II

-

h.

The inspector reviewed the liquid penetrant Procedure PT-1, Rev. 4

{

with Addendum 4.0E, to ascertain whether it had been reviewed and approved in accordance with the licensee's established QA procedures.

'

The procedure was reviewed for technical adequacy and conformance with licensee commitments / requirements in the below listed areas:

specified method; penetrant material. identification; penetrant.

materials analyzed for sulfur; penetrant materials analyzed for total halogens; acceptable pre-examination ' surface; drying-time;: method of penetrant application; surface temperature; solvent removal; surface-drying prior to developing; type of developer; examination technique; evaluation technique; and,-procedure requalification.

The inspector reviewed the below listed liquid penetrant materials-

)

certification records to ascertain if the-sulfur. and halogen content-

,

l of the material was within' acceptable content limits.

,

l

Materials Batch Number

-l Liquid Penetrant 214E47 E

Cleaner / Remover 46F4 Developer 610K6-a

1.

The: inspector reviewed the magnetic particle procedure MT-1R-3 with

. Addendum 4.0E, to ascertain whether it had been reviewed and approved in

'

accordance. with the licensee's established nA-procedures.

This procedure was reviewed for technical adequacy 'and for.conformance with ' licensee commitments / requirements in the! below listed areas:

!

examination method; contrast of dry powder particle color..with.

background; surface temperature; suspension. medium and surface

'

temperature for wet particles; viewing conditions; ' examination

.:

overlap and directions; pole or prod spacing; current or lifting'

l

-

power (yoke); and, acceptance criteria.

'

t

I j

-

5 l

l The inspector reviewed the certification records for magnetic particle inspection medium batch no. 7802-23500 to ascertain if the sulfur and halogen content of the material was within acceptable content limits.

The above listed welds were MT examined using alternating current i

l (AC) yokes with Serial Numbers 10037, 4604, and 8300.

The i

certific. tion documentation for these AC yokes was reviewed by the i

inspector.

j No violations or deviations were identified within the areas inspected.

I L

6.

Maintenance Program and Maintenance Program Implementation a.-

The below listed documents.and. procedures were reviewed to determine if the licensee's maintenance program is in conformance with Technical Specifications, regulatory requirements, commitments in the licensee application, and industry guides or standards.

l Technical Specification Section 6.0 Administrative Controls 05-08-86 Station Administrative Procedures

,

i ADM-10.3 QC Hold / Verification Steps 08-01-85 ADM-6.1 Document Control 03-31-83 ADM-16.0 Corrective Action 08-20-86 ADM-16.4 Maintenance Program 08-28-86 ADM-16.5 Work Requests (WR)

02-12-87 ADM-16.7 Corrective Work Orders 09-11-86 BM-16.8 Use of Procedures During Maintenance-07-31-86

%-20.4i Material Conditions and Housekeeping Program 02-27-87 Maintenance Department Administrative Procedures

MM Adm 1.0_

Organization 03-09-87 MD Adm 2.0 Training _

04-12-84 MD Adm 2.2 Welding Training Program 08-17-83 MD Adm 3.0 Tool Control Program 02-14-84 MD Adm 5.0 Document Control 02-27-84 MD Adm 5.1 Procedure Review.

03-06-87 MD Adm 5.2 Inspection of Plant Water Systems 09-16-81

MD Adm 6.0 Maintenance Control For Open 09-25-85 System MD Adm 8.0 Planned Maintenance System 12-18-86 MD Adm 8.2 Equipment History 12-10-85 MD Adm 12.0 Grinnell Valve Maintenance 02-24-82 Program

_ __-

_-____ - -

.

(cont'd)

Maintenance Department Administrative Procedures MD Adm 12.1 Safety and Relief Valve 04-18-84 Maintenance Program MD Adm 13.0 Main Condenser / Heat Exchanger 01-21-83 Tube PWG History MD Adm 21.0 Control of Outside Contractor 09-30-86 Work MD Adm 23.0 Heat Tracing Maintenance Program 11-27-85 MD Adm 26.0 Valve Packing Program 03-26-87 MD Adm 27.0 Preparation and Content of 06-26-86 Maintenance Procedure (1) The above listed procedures, relative to the licensee's corrective maintenance program, were reviewed to confirm that:

written procedures have been established for initiating requests for routine and emergency maintenance; criteria and responsibilities have been established for review and approval of maintenance requests including emergency maintenance requests; criteria and responsibilities have been established that form the basis for designating the activity as safety-related or non safety-related; criteria and responsibilities have been designated for performance of inspections and maintenance activities; provisions and responsibilities have been established for the identification of appropriate inspection hold points related to maintenance activities; methods and responsibilities have been designated for performing functional testing of structures, systems, or components following maintenance work and/or prior to their being returned to service; administrative controls for' maintenance activities require that applicable records will be prepared, assembled, and reviewed for transfer to records storage; responsibility has been established to assemble and review the maintenance records for transfer to record storage; a program has.been established for reviewing completed corrective maintenance records to assess the adequacy of the preventive maintenance program, to identify repetitive failures of parts and components, and to identify design deficiencies; work control procedures have been established to require special authorization for activities involving welding, open flame, or other ignition sources and take cognizance of nearby flammable material, cable trays, or critical process equipment; and, revisions to technical specifications have been incorporated into procedures and included in the master program.

(2) The above listed procedures, relative to the licensee's preventive maintenance program, were reviewed to confirm that a written preventive maintenance program for safety-related structures, systems, and components has been established that includes:

responsibility for the program; master schedule for

. _ _ _ _ _ _

-

,

,

l preventive maintenance; documentation and review of completion j

of preventive maintenance activities; responsibilities and-

methods for establishing preventive maintenance frequencies-

~

L responsibility for periodic upgrading based on system or i

component failures; and, methods for incorporating revisions to technical specifications into procedures and the master program.

-(3) The above listed procedures, relative to. equipment control, were reviewed to establish that methods and responsibilities for equipment control have been defined and specifically to confirm that: procedures have been established to specify that the operating staff grants permission to release equipment or systems for maintenance; equipment that is environmentally qualified should be identified as such prior to maintenance and sufficient contro!s should exist to ensure it is returned to that status upon reassembly; procedures and rernonsibility have been established for returning equipment to service; and, revisions to Technical Specifications have been incorporated

into procedures and included in the master program.

i

(4) The above listed procedures, relative to special proceres, were

'i reviewed to confirm that responsibilities have been assigned to assure that the requirements of the administrative controls will l

be accomplished and that the administrative controls for special

)

processes have been established as follows: a requirement that only qualified procedures will be used; a requirement that only j

qualified personnel will be used; a requirement that a current j

file of special processes will be maintained to include qualification records of procedures and personnel; and, criteria to establish when the use of mock-ups or other special training will be required, j

(5) The above listed procedures relative to cleanliness controls were reviewed to verify that: procedures have been developed for l

cleaning safety-related components and systems and that i

responsibilities for implementing this requirement has been.

j established; procedures have been established for maintaining i

the cleanliness of previously cleaned systems and that responsibilities for implementing this requirement has been established; and, the cleanliness classifications of plant systems have been established.

During the review of procedures for cleanliness controls for plant systems / components, the inspector noted that no basic

,

specification had been developed to outline specific cleanliness

'

requirements after maintenance has been completed.

Upon discussions with plant personnel, it was determined that the quality assurance group did have guidelines, however, these

____

.

guidelines could not be traced to a specific specification.

~

Further, the licensee had previously identified this area as needing some specific specification bases and had initiated an Emergency Work Request (EWR) on Septemter 17, 1985, requesting resolution from the station engineering department.

However, due to EWR form changes at the time of submission, and i

subsequent rotational assignment of the. EWR within the Engineering department, the resolution has not yet been completed.

Pending the licensee's adequate resolution of this oversight and review of the resolution by the NRC, this item will be identified as Unresolved Item 50-338, 339/87-18-01, Specification for System and/or Component Cleanliness Following

,

Maintenance.

(6) The above listed procedures, relative to housekeeping controls, were reviewed to confirm that administrative controls and responsibilities for general housekeeping have been established to include defining housekeeping zones and controlling

'

housekeeping during work activities, b.

In ' order to determine whether the maintenance program is being implemented in accordance with regulatory requirements and to evaluate the effectiveness of the program on important plant equipment and to assess the ability of the maintenance staff to conduct an effective maintenance program, a selection of both i

completed and working maintenance work order packages and associated I

documentation was reviewed.

The specific work order packages and i

associated documentation are recorded in the following subparagraphs.

l (1) The below listed work order packages were reviewed to determine whether: the cause of the failure was evaluated and adequate i

corrective action was taken to reduce the probability of

'

recurrence; the procedures specified in the maintenance package were adequate for the scope of the maintenance performed; and vendor maintenance recommendations, if used, were correctly translated into or referenced by the maintenance procedures.

Work Order No.

Work Order Title Item I.D.

Safety-Related 107759 Leak Under Lagging Valve 02-RC-M0V-2590 Yes 179823 Tube Leak FW Heater 02-FW-E-4B No

020123 Repair Weld Leak PI Isolation

'

01-FW----147 Yes 043784 Check Valve Hung Open Valve 01-FW----1 No 012452*

U-2 Packing Program Valve 02-RC-MOV-2585 Yes l

'

_ _ _

_ _ _.

_

_

____

__

.>

,

~

.

(cont'd)

Work Order No.

Work Order Title Item 1.D.

Safety-Related 036078(EWR)

Repair Cracked Nipple Valve 01-CH---291 Yes 030411 Adjust / Replace Viv.

Valve 01-FW---195 No as necessary 038324*

Perform Proc.

Valve

M-20-MOV/R-5 02-RC-MOV-2585 Yes 038319*

Perform Proc.

Valve E-24-M0V/R-1 02-RC-M0V-2585 Yes 016056(EWR)

Reset TS Valve l

02-RC-MOV-2585 Yes

  • Preventive Maintenance (2) The above work order packages, associated with safety-related equipment, were also reviewed to confirm that: required adminis-trative approvals were obtained before initiating the work; i

l limiting conditions for operation were met while the component or system was removed from service; approved procedures were used where the activity appeared to exceed the normal skills possessed by qualified maintenance personnel; inspections were made in accordance with the licensee's requirements, and quality control records are complete; functional testing and calibra-tions, as necessary, were completed before returning the equip-ment to service; the personnel who performed the tests were properly qualified; the licensee evaluated system failures; corrective and preventive maintenance records were assembled and stored as part of the maintenance history; the measuring and I

test equipment (M&TE) used was identified and, in calibration;

.

'

parts and materials used were identified; and, special processes were controlled and documented.

(3) The below listed maintenance procedures were used to conduct portions of the maintenance activities for the work order packages listed in paragraph 6.b.(1).

The inspector reviewed these procedures in order to confirm that: the procedure con-forms to the licensee's administrative requirements, including format, approval, and control; the inspection and hold points are identified in the procedure or in a documented plan and are based on a set of established guidelines; supplenientary reference material such as drawings and technical manuals is adequate and controlled; the activity is described in sufficient.

detail; consideration is given to radiological, temperature, pressure, and electrical hazards, as appropriate to the cir-

!

cumstances; the provisions for fire protection, cleanliness, and housekeeping are adequate; appropriate instructions and

,

_---

.....

...

-

.

....

.

.

....

...

.

.

. -...

-

--

-

-

-

!

.

!

I quality control checks are included to verify that environ-mentally qualified equipment is properly protected against q

moisture intrusion when reassembled; and, the provisions for

control of equipment, including lifted leads, jumpers, bypasses, j

and mechanical blocks are present.

l M-20-M0V/R-5

-

E-24-M0V/R-1

-

-

MMP-C-RC-4.2 (4) Component historical records for the completed maintenance activities for several of the component work order packages listed in paragraph 6.b.(1) were reviewed to verify that the historical records are being kept up to date and are properly stored as quality assurance records.

I (5) Records of Measuring and Testing Equipment (M&TE) listed below, I

that were used during maintenance activities, were reviewed to

,

confirm the following: the M&TE was in calibration at the time

!

of use; the calibration of the M&TE can be traced to nationally i

recognized standards; the M&TE is properly stored, controlled, i

identified with a unique number, and labeled with calibration

!

status; and, the error of the M&TE was less than or equal to the instrument being calibrated.

i l

l l

Item Control Number I

i I

Depth Mic 1114 i

Torque Wrench 1076 Torque Wrench 1079 Torque Wrench 1372 l

i 22 x 1 Multiplier 1308

)

l Amptongs 1100 Torque Wrench 1378

(6) The preventive maintenance program was reviewed in order to verify the following: a master schedule is available; a compilation of late and incomplete preventive maintenance

activities' is available for management review; in put was made -

l to the preventive maintenance program, if appropriate, based on l

the equipment failures; preventive maintenance procedures are available and are sufficiently detailed; and, a lubrication control system is available and kept up-to-date.

Within the areas inspected, no violations or deviations were identified.