Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790)
ML20138D875
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/11/1993
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20138D834 List:
References
50-338-93-06, 50-338-93-6, 50-339-93-06, 50-339-93-6, NUDOCS 9302230108
Download: ML20138D875 (2)


Text

_ . . . . , . _

.

i UNI TED STATES '

'

-

f [, 1 og - NUCLEAR REGULATORY COMMISslON R

~

j, =- d o REGloN li j_

_

e5 - 101 MARIETTA STREET. ,'*,

'

!- ATLANTA, oEoRGI A 30323 g% . . ,/

.

'

Report Nos.: 50-338/93-06 and 50-339/93-06 Licensee: Virginia Electric and Pwer Company Gler: Allen, VA 23060 Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7 Facility Name: North Anna 1 and 2 Inspection Conducted: January 25-29, 1593

'

Inspector: M Mr\ d#4[ h A. Tillm'an, Saf uardsvInspector eN-// M Date Signed Approved by: M D. McGuire,-~ Chief b//-N Dat'e Sfgned-Safeguards Section Nuclear Material Safety and Safeguards Branch '

Division of Radiation Safety and Safeguard SUMMARY Scope:

.

This routine, unannounced inspection was conducted in the areas of Physical Security Program for Power Reactors, specifically; protected -and _ vital are *

barriers, protected and vital area access control of personnel,-packages and-

-

vehicles; testing, maintenance and compensatory measures; and = alarm stations and communications. In addition, the status of the licensee's major upgrade of the security system was reviewed to include observation of ongoing _

acceptance testing of the'new security computer system. Security _ activities in support of the Unit 1 Steam Generator replacemeni. cf fort were. also reviewe .

Results:

In the areas inspected, violations or deviations were not identifie Review and observation of_ security operational activities tours of the protected and vital areas, and observation of-licensee and vendor conducted-

-

tests of the upgrade security computer'and-access control system confirmed that the management and operational effectiveness of the securi_ty-program continued as noted during previous inspection Acceptance testing of the security computer system and access control components demonstrated-system operability. Actions to correct system software anomalies identified during testing were initiated as Problem Change Requests (PCRs). Phase 11 of the security system upgrade will be concluded 9302230100 930216 g, con,nt t,,nsrn,tted iterewith-PDR ADOCK 05000338- gn,,,n,tive unciewtied O' PDR gw wnen separated from

~ - t**=~ao****** -

. . .

__ ,.

-

.

.. -  ;

^

.*

SAFEGUARDS lNFORMATIONL ,

2-upon completion of acceptance testing and associated-corrective action Inspection _r esults confirmed that the' security force continues to perform effectively and with a high~1evel of professionalism, with strong management support eviden I-i

'l I .

-I

~

'

i

'

l-

-

l l -

,

I-I L :-

-

l 1- *

l

..

rnent transmitted herewith-

. pH senWtive unclessited 4 ' ggggggg",u

-

i